Low-Energy Linac Upgrade Scenarios Elliott McCrory BD/Proton/Linac 21 November 2003.

Slides:



Advertisements
Similar presentations
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
Advertisements

Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Ion Accelerator Complex for MEIC January 28, 2010.
1 M. Popovic NFMC Collaboration Meeting IIT Muon (Pre)Acceleration for 8 GeV Proton Driver Linac Milorad Popovic FNAL 14-March.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Knoxville, TN, Jan , 2014 Lecture.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
FFAG Tune-stabilized, Linear-field Nonscaling FFAG Lattice Design C. Johnstone, Fermilab S. Koscielniak, TRIUMF FFAG07 April 12-17, 2007 LPSC, Grenoble,
ESS DTL beam commissioning
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
CAS, BilbaoMueller, Ugena, Velez, Zerlauth May 31 st v0 SCC – Industrial ADS.
ACCELERATING A CYCLOTRON 18 MEV PROTON BEAM BY A SCDTL LINAC Luigi Picardi, Concetta Ronsivalle (ENEA C.R. Frascati, Frascati (Roma)), Paola Panichelli,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
FFAG Tune-stabilized, Linear-field FFAG C. Johnstone, Fermilab S. Koscielniak, TRIUMF FFAG06 Japan f Fermilab.
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
F Proton Source Department Linac Briefing to Directorate August 9, 2002 Fermilab Linac Status and Outlook Briefing to the Directorate Beams Division /
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
Proton Planning Eric Prebys FNAL Accelerator Division.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
PAC Meeting, December 12, Prebys 1 The Problem.
Hybrid Fast-Ramping Synchrotron to 750 GeV/c J. Scott Berg Brookhaven National Laboratory MAP Collaboration Meeting March 5, 2012.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
Beam dynamics and linac optics studies for medical proton accelerators
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
NICA injection complex status
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Linac4 Beam Characteristics
Progress in the Multi-Ion Injector Linac Design
Part2: Cavities and Structures
Superbeams with SPL at CERN
CEPC RF Power Sources System
FFAG Accelerator Proton Driver for Neutrino Factory
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Part2: Cavities and Structures
MEBT1&2 design study for C-ADS
Physics Design on Injector I
The SPL-based Proton Driver at CERN
Status of the JLEIC Injector Linac Design
DTL for MEIC Ion Injection
Multi-Ion Injector Linac Design – Progress Summary
HE-JLEIC: Do We Have a Baseline?
RF system for MEIC Ion Linac: SRF and Warm Options
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Low-Energy Linac Upgrade Scenarios Elliott McCrory BD/Proton/Linac 21 November 2003

Elliott McCrory2 Why Another Linac Upgrade? The supply of 7835 power amplifiers may end soon  Ingrid Bergman as Mike Witherell: "You're saying this only to make me [spend money]."  Humphrey Bogart as Elliott: "I'm saying it because it's true. Inside of us, we both know [Burle will go out of business someday]. If that [happens] and you're not [prepared], you'll regret it - maybe not today, maybe not tomorrow, but soon, and for the rest of your life." Modulator “switch tubes” are no longer available  We have a 5-10 year supply of these tube Activation in the Linac may become a problem  Matching between 201 MHz and 805 MHz portions is not ideal  #particles/day is 6X higher in FY03 than FY00 And MiniBooNE and NUMI want ~4X more than this Many 33-year-old components are difficult & expensive to maintain  LEL Quad Power supplies ($1M to replace, ASAP)  LEL LLRF, driver amplifiers, etc., etc. Technical staff that built LEL are nearing retirement

21 November 2003Elliott McCrory3 Linac Upgrade Possibilities Replace the Cockcroft-Walton & prototype tank 1 with a 201 MHz RFQ to 10 MeV  But only solves the activation issue Replace the 201 MHz portion of the Linac with a 402 MHz Linac  Solves all issues  Similar to SNS  Several possible scenarios Add more accelerating modules at the end  Solves no issues, but would help Booster  Conventional SCC modules, like existing Module 7, or …  Superconducting modules, similar (identical?) to 8 GeV Linac injector

21 November 2003Elliott McCrory4 New 402 MHz Low-Energy Linac Original: Don Young, “PD Study 1” (2002) Commercial partner  AccSys Technologies, Pleasanton, CA 80% owned by Hitachi Potential collaborations with:  New Proton Driver efforts Foster and/or Chou  Fermilab’s NTF (Arlene Lennox) “Fermi Institute of Hadron Therapy” $50M from Hastert?!  National Taiwan University Hospital, Hsinchu Biomedical Science Park Taipei, Taiwan Has ~$100M ready to spend NOW

21 November 2003Elliott McCrory5 From AccSys Web page Synchrotron Injector Linac Systems The LINSTAR™ series of proton linac systems are designed to provide moderate-energy proton beams (typically from 2 to 7 MeV) for injection into high energy proton synchrotrons that are used for proton beam cancer therapy or physics research. These fully integrated systems typically consist of a carefully designed and selected combination of a radiofrequency quadrupole (RFQ) linac, a drift tube linac (DTL) for injection energies of >3 MeV, AccSys' standard rf power system, a high energy beam transport system tailored to the specific requirements of the facility and an optional debuncher cavity. They can accelerate either H+ or H- ion beams and are also available for polarized H+ or H- beams. Standard LINSTAR™ units can provide pulsed beam currents up to 25 mA at pulse widths from 3 to 300 µsec. Operation at pulse repetition rates from 0.1 to 30 pulses per second have been demonstrated, including on- demand pulsing for breath-mode synchronization in proton cancer therapy. LINSTAR™ systems are currently in use at several facilities around the world: A Model PL-2i has been operating at Loma Linda University Medical Center since 1990 as the injector to the high energy proton synchrotron cancer treatment facility. The synchrotron system operates 24 hours a day, 6 days a week and has been described in a number of technical publications. Complete proton therapy systems based on the Loma Linda installation are commercially available from Optivus Technology, Inc. Two systems are being commissioned in Japan: a Model PL-3i is the injector to the proton synchrotron cancer treatment facility at the Shizouka Cancer Center, being built by Mitsubishi Electric Company, and a Model PL-7i is the injector for the proton synchrotron cancer treatment facility being installed at the Tsukuba Medical Center by Hitachi, Ltd. A Model PL-7i has been operating at the Indiana University Cyclotron Facility since 1997 as the injector for the CIS compact synchrotron which is in turn the injector for the high energy physics cooler ring. technical publicationsOptivus Technology, Inc.CIS compact synchrotron

21 November 2003Elliott McCrory6 Two Scenarios: Commonalities Replace Cockroft-Walton with two redundant RFQs  Available from AccSys technologies  3 MeV  New LEBT including the “Double Alpha” idea invented by Del Larson  No need for a buncher cavity. New DTL from 3 to 70 or 89 MeV  Tank 1: Ramped Gradient Drift Tube Linac RGDTL available from AccSys technologies  Three or four new 402 MHz DTLs New Transition section  We can “do it right” this time One or two new SCC modules to 116 MeV Extra room at 400 MeV to add more acceleration

21 November 2003Elliott McCrory7 Basic Parameters of Today Length of existing LEL78.8m Length, SCC Module 16.7m Length, SCC Module 79m Length of HEL55m Input Energy to existing HEL116MeV Linac Output Energy401.5MeV Energy gain in Module 740MeV “SCC” == “Side Coupled Cavity” “LEL” == “Low Energy Linac”

21 November 2003Elliott McCrory8 Three Scenarios 1. Modest  2 RFQ, RGDTL, 4 DTL, 2 LE SCC 2. Luxury  2 RFQ, RGDTL, 5 DTL, 1 LE SCC, 2 new modules at 400 MeV  Shift existing SCC modules upstream by ~18 m 3. More aggressive ideas (not explored here)  800 MeV?? Move everything upstream into C-W pit (+ ~ 100m?) Add Superconducting accelerating cavities at end

RFQ 2 RFQ 1 RGDTLDTL Tank 2DTL Tank 5 Trans0TransVNew Module 1Existing Module 1 […] Existing Module 7New Module 8 To Booster at ~480 MeV Schematic Layout of #2 DTL Tank 3 New Module 9 DTL Tank 4 Solid: NEW Hatched: Existing ~89 MeV

21 November 2003Elliott McCrory10 Benefits of a new LE Linac Replaces all 33-year-old Linac equipment  SOA technology  NO MORE 7835’s! Increase beam brightness  Probably: 2 to 4 X smaller transverse emittance Existing technical staff: Days are numbered  New technical staff can “own” this new machine New machinery and new people might last another 30+ years 402 MHz Klystrons exist  And our 805 MHz klystrons last “forever” Significantly shorter than existing LEL  Could add more modules at the end to give an energy boost  Higher injection energy into Booster is better Reduced losses/activation throughout the Linac  Transition section is our predominant loss now  Lower emittance would mean lower 400 MeV-line losses

21 November 2003Elliott McCrory11 Higher Energy Linac Benefits The space charge limit for constant aperture at Booster injection scales like β 2 γ 3

21 November 2003Elliott McCrory12 Pet Project (1996) RFQs

21 November 2003Elliott McCrory13 Double α Magnet: Del Larson

MEBT Parameters

21 November 2003Elliott McCrory15 Trace-3D Run of PET MEBT Longitudinal RFQ 1 RFQ 2

21 November 2003Elliott McCrory16 From Larson’s ‘96 MEBT paper 6.1. Longitudinal Control. […] some control over the longitudinal phase space can be exercised by using the trim quads located in the cross over arm. The MEBT has been designed to have a high dispersion in this region, and quadrupole variations in this region therefore have a large effect on the dispersion function. The dispersion is introduced in the first alpha magnet, and the magnet and optics have been nominally designed so that the dispersion function has zero gradient in the middle of the cross over arm. With zero dispersion gradient and transverse waists in the center of the cross over arm, the beam will have symmetric optics about this point, leading to zero dispersion and zero dispersion gradient at the end of the second alpha magnet. While the first goal of the trim quads is to ensure a symmetric dispersion function, so as to eliminate dispersion at the end of the MEBT, a second function can be to control the position of the longitudinal waist. Since small trim quad variations have a large effect on the dispersion and a small effect on the transverse beam optics, the longitudinal control exercised by the trim quads is largely independent of the transverse optics Transverse Control. Once dispersion has been minimized (by arranging for symmetric optics within and between the dipoles) the quadrupoles placed downstream of the dipoles will have no effect on the longitudinal optics and can therefore be used solely for transverse optics matching. Since there are three such quads, one can in principle exercise control over three linear combinations of the four independent transverse phase space variables. […]

21 November 2003Elliott McCrory17 Linac Upgrade Params (#1)

21 November 2003Elliott McCrory18 Linac Upgrade Params (#2)

21 November 2003Elliott McCrory19 Rough Cost Estimate

21 November 2003Elliott McCrory20 Final Thoughts Collaborators galore!  NTF/Lennox  Taiwan  AccSys (but not for free) How much longer can we get 7835 power amplifiers? How much longer can we maintain the old Linac? The time is right to proceed on this