Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann Special PAF meeting 10.04.2007 We acknowledge the support of the European.

Slides:



Advertisements
Similar presentations
Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Long-range beam-beam compensation at HL-LHC Tatiana Rijoff, Frank Zimmermann ColUSM # /03/2013.
Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann ACES workshop We acknowledge the support of the European Community-Research.
Name Event Date Name Event Date 1 SLHC Machine Plans We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know...
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities fundamental limitations to the ultimate performance of high-luminosity.
1 BeamBeam3D: Code Improvements and Applications Ji Qiang Center of Beam Physics Lawrence Berkeley National Laboratory SciDAC II, COMPASS collaboration.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Thoughts on crab cavity noise, Fritz Caspers, Bandwidth of cavity structure with loaded Q is nearly always MUCH higher than generator bandwidth.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Beam-beam studies in the LHC and new projects T. Pieloni for the LHC and HL-LHC Beam-Beam Teams ICFA mini-workshop on "Beam-Beam Effects in Hadron Colliders”
Scenarios for the sLHC and the vLHC Walter Scandale, Frank Zimmermann CERN HCP2007 We acknowledge the support of the European Community-Research Infrastructure.
Frank Zimmermann, LHCb Upgrade Meeting Overview of LHC Machine Upgrade Plans from an LHCb Perspective - Frank Zimmermann LHCb Upgrade Meeting CERN, 5 August.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
F. Willeke, Snowmass Luminosity Limitations of e-p Colliders Extrapolation from HERA Experience Examples for IR Layout LINAC-Ring Limitations HERA.
Already time to think of upgrading the machine Two options presently discussed/studied Higher luminosity ~10 35 cm -2 s -1 (SLHC) –Needs changes in.
Frank Zimmermann, LARP Beam-Beam, SLAC, July 2077 Beam-Beam Effects for LHC and LHC Upgrade Scenarios Frank Zimmermann US-LARP Beam-Beam Workshop SLAC,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Criteria for dynamic aperture limits and impact of the multipolar errors: summary of the simulations with beam-beam for levelling scenarios at 5 and 7.5x10.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
CERN Upgrade Plans for the LHC and its Injectors Frank Zimmermann EPS HEP 2009 EPS HEP 2009 Krak ó w, 17 July 2009 Krak ó w, 17 July 2009.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
E. Todesco, Milano Bicocca January-February 2016 Unit 2 Magnets for circular accelerators: the interaction regions Ezio Todesco European Organization for.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Tentative conclusions. Beam parameters new parameter sets with acceptable electron cloud & pile-up events 25 ns spacing ultimate beam with low  * - may.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Name Event Date Name Event Date 1 CERN LHC Phase-II Upgrade Scenarios CERN-KEK Committee, 3 rd meeting, Friday 12 December CERN Lucio Rossi – CERN/AT.
Name Event Date Name Event Date 1 CERN Super-LHC We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
Issues related to crossing angles Frank Zimmermann.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Turnaround time in modern hadron colliders & store-length optimization
Collision with a crossing angle Large Piwinski angle
Operating IP8 at high luminosity in the HL-LHC era
contribution to the round table discussion
LUMI06 preliminary conclusions
fundamental equations of LHC performance
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
LHC Accelerator Upgrade
Jean-Pierre Koutchouk, Frank Zimmermann
Scenarios for the LHC Upgrade
Measurements, ideas, curiosities
LHC (SSC) Byung Yunn CASA.
Walter Scandale, Frank Zimmermann 18 January 2007
Possible Scenarios for an LHC Upgrade
Frank Zimmermann & Walter Scandale
Thursday Summary of Working Group I
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Performance and Accelerator R&D
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Large emittance scenario for the Phase II Upgrade of the LHC
Presentation transcript:

Two Scenarios for the LHC Luminosity Upgrade Walter Scandale, Frank Zimmermann Special PAF meeting We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring the European Research Area" programme (CARE, contract number RII3-CT )

outline beam parameters features, IR layouts, merits and challenges of both scenarios luminosity evolution bunch structures luminosity leveling summary & recommendations appendix - LUMI’06 outcome, effect of off-center collisions, shorter bunches vs crab cavities, Super-LHCb, leveling equations

Piwinski angle luminosity reduction factor from crossing angle nominal LHC

Name Event Date Name Event Date 4 W. Scandale/F. Zimmermann, parametersymbolnominalultimate 12.5 ns, short transverse emittance  [  m] protons per bunch N b [10 11 ] bunch spacing  t [ns] beam current I [A] longitudinal profile GaussGauss Gauss rms bunch length  z [cm] beta* at IP1&5  [m] full crossing angle  c [  rad] Piwinski parameter  c  z /(2*  x *) peak luminosity L [10 34 cm -2 s -1 ] peak events per crossing initial lumi lifetime  L [h] effective luminosity (T turnaround =10 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] effective luminosity (T turnaround =5 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] e-c heat SEY=1.4(1.3) P [W/m] 1.07 (0.44) 1.04 (0.59) (7.85) SR heat load K P SR [W/m] image current heat P IC [W/m] gas-s. 100 h (10 h)  b P gas [W/m] 0.04 (0.38) 0.06 (0.56) (1.13) extent luminous region  l [cm] commentpartial wire c. total heat far exceeds max. local cooling capacity of 2.4 W/m baseline upgrade parameters abandoned at LUMI’06 (SR and image current heat load well known)

Name Event Date Name Event Date 5 W. Scandale/F. Zimmermann, parametersymbol 25 ns, small  * 50 ns, long transverse emittance  [  m] 3.75 protons per bunch N b [10 11 ] bunch spacing  t [ns] 2550 beam current I [A] longitudinal profile GaussFlat rms bunch length  z [cm] beta* at IP1&5  [m] full crossing angle  c [  rad] 0381 Piwinski parameter  c  z /(2*  x *) 02.0 hourglass reduction peak luminosity L [10 34 cm -2 s -1 ] peak events per crossing initial lumi lifetime  L [h] effective luminosity (T turnaround =10 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] effective luminosity (T turnaround =5 h) L eff [10 34 cm -2 s -1 ] T run,opt [h] e-c heat SEY=1.4(1.3) P [W/m] 1.04 (0.59)0.36 (0.1) SR heat load K P SR [W/m] image current heat P IC [W/m] gas-s. 100 h (10 h)  b P gas [W/m] 0.06 (0.56)0.09 (0.9) extent luminous region  l [cm] comment D0 + crab (+ Q0)wire comp. two new upgrade scenarios compromises between heat load and # pile up events

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 for operation at beam-beam limit with alternating planes of crossing at two IPs, luminosity equation can be written as ↓↓ 25 ns ↑↑ 50 ns↓ 50 ns where  Q bb = total beam-beam tune shift (hourglass effect is neglected above)

Name Event Date Name Event Date 7 W. Scandale/F. Zimmermann, ns low-  upgrade scenario stay with ultimate LHC beam (1.7x10 11 protons/bunch, 25 spacing) stay with ultimate LHC beam (1.7x10 11 protons/bunch, 25 spacing) squeeze  * to ~10 cm in ATLAS & CMS squeeze  * to ~10 cm in ATLAS & CMS add early-separation dipoles in detectors starting at ~ 3 m from IP add early-separation dipoles in detectors starting at ~ 3 m from IP possibly also add quadrupole-doublet inside detector at ~13 m from IP possibly also add quadrupole-doublet inside detector at ~13 m from IP and add crab cavities (  Piwinski ~ 0), and/or shorten bunches with massive addt’l rf and add crab cavities (  Piwinski ~ 0), and/or shorten bunches with massive addt’l rf → new hardware inside ATLAS & CMS detectors, first hadron-beam crab cavities (J.-P. Koutchouk et al)

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 CMS & ATLAS IR layout for 25-ns option ultimate bunches & near head-on collision stronger triplet magnets D0 dipole small-angle crab cavity Q0 quad’s

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 challenges: D0 dipole deep inside detector (~3 m from IP), Q0 doublet inside detector (~13 m from IP), crab cavity for hadron beams (emittance growth), or shorter bunches (requires much more RF) 4 parasitic collisions at 4-5  separation, “chromatic beam-beam” Q’ eff ~  z /(4  *   ), poor beam and luminosity lifetime ~  *. merits: negligible long-range collisions, no geometric luminosity loss, no increase in beam current beyond ultimate 25-ns scenario assessment

Name Event Date Name Event Date 10 W. Scandale/F. Zimmermann, ns higher  * upgrade scenario double bunch spacing double bunch spacing longer & more intense bunches with  Piwinski ~ 2 longer & more intense bunches with  Piwinski ~ 2 keep  *~25 cm (achieved by stronger low-  quads alone) keep  *~25 cm (achieved by stronger low-  quads alone) do not add any elements inside detectors do not add any elements inside detectors long-range beam-beam wire compensation long-range beam-beam wire compensation → novel operating regime for hadron colliders

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 CMS & ATLAS IR layout for 50-ns option long bunches & nonzero crossing angle & wire compensation wire compensator larger-aperture triplet magnets

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 merits: no elements in detector, no crab cavities, lower chromaticity, less demand on IR quadrupoles (NbTi possible), could be adapted to crab waist collisions (LNF/FP7) challenges: operation with large Piwinski parameter unproven for hadron beams, high bunch charge, beam production and acceleration through SPS, “chromatic beam-beam” Q’ eff ~  z /(4  *   ), larger beam current, wire compensation (almost etablished) 50-ns scenario assessment

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 IR upgrade optics “compact low-gradient” NbTi,  *=25 cm <75 T/m (Riccardo De Maria, Oliver Bruning) “modular low gradient” NbTi,  *=25 cm <90 T/m (Riccardo De Maria, Oliver Bruning) “low  max low-gradient” NbTi,  *=25 cm <125 T/m (Riccardo De Maria, Oliver Bruning) standard Nb 3 Sn upgrade,  *=25 cm ~ 200 T/m, 2 versions with different magnet parameters (Tanaji Sen et al, Emmanuel Laface, Walter Scandale) + crab-waist sextupole insertions? (LNF/FP7) early separation with  *=8 cm, Nb 3 Sn includes D0; either triplet closer to IP or Q0; being prepared for PAC’07 (Jean-Pierre Koutchouk et al) compatible with 50-ns upgrade path

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 crab waist scheme minimizes  at s=-x/  c focal plane realization: add sextupoles at right phase distance from IP initiated and led by LNF in the frame of FP7; first beam tests at DAFNE later in 2007 Hamiltonian

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November ns spacing 50 ns spacing IP1& 5 luminosity evolution for 25-ns and 50-ns spacing average luminosity initial luminosity peak may not be useful for physics (set up & tuning?)

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November ns spacing 50 ns spacing IP1& 5 event pile up for 25-ns and 50-ns spacing

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 old upgrade bunch structure 25 ns 12.5 ns nominal 25 ns ultimate 12.5-ns upgrade abandoned at LUMI’06

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November 2006 new upgrade bunch structures 25 ns 50 ns nominal 25 ns ultimate & 25-ns upgrade 50-ns upgrade, no 50 ns 50-ns upgrade with 25-ns collisions in LHCb 25 ns new alternative! new baseline!

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 luminosity leveling in IP1&5 experiments prefer more constant luminosity, less pile up at the start of run, higher luminosity at end how could we achieve this? 25-ns low-  scheme: dynamic  squeeze 50-ns higher-  scheme: dynamic  squeeze, and/or dynamic reduction in bunch length (less invasive)

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 dynamic  squeeze for 25-ns option  N 150  N 75

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 dynamic  squeeze for 50-ns option  N 150 we might also reduce the charge/bunch and go for shorter bunches

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 dynamic bunch length change for 50-ns option

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November ns, low  *, with leveling 50 ns, long bunches, with leveling events/crossing 300 run time N/A2.5 h av. luminosityN/A2.6x10 34 s -1 cm -2 events/crossing 150 run time 2.5 h14.8 h av. luminosity2.6x10 34 s -1 cm x10 34 s -1 cm -2 events/crossing 75 run time 9.9 h26.4 h av. luminosity2.6x10 34 s -1 cm x10 34 s -1 cm -2 assuming 5 h turn-around time

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November ns spacing 50 ns spacing IP1& 5 luminosity evolution for 25-ns and 50-ns spacing with leveling average luminosity

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November ns spacing 50 ns spacing IP1& 5 event pile up for 25-ns and 50-ns spacing with leveling

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November evts/Xing example tune shifts with luminosity leveling

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 average luminosity & run time vs. final  for 25-ns option with dynamic  * squeeze

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 average luminosity & run time vs. final  for 50-ns option with dynamic  * squeeze

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 average luminosity & run time vs. final  z for 50-ns option with dynamic  z change

Name Event Date Name Event Date 30 W. Scandale/F. Zimmermann, summary two scenarios of L~10 35 cm -2 s -1 for which heat load and #events/crossing are acceptable two scenarios of L~10 35 cm -2 s -1 for which heat load and #events/crossing are acceptable 25-ns option: pushes  *; requires slim magnets inside detector, crab cavities, & Nb 3 Sn quadrupoles and/or Q0 doublet; attractive if total beam current is limited; transformed to a 50-ns spacing by keeping only ½ the number of bunches 25-ns option: pushes  *; requires slim magnets inside detector, crab cavities, & Nb 3 Sn quadrupoles and/or Q0 doublet; attractive if total beam current is limited; transformed to a 50-ns spacing by keeping only ½ the number of bunches 50-ns option: has fewer longer bunches of higher charge ; can be realized with NbTi technology if needed ; compatible with LHCb ; open issues are SPS & beam-beam effects at large Piwinski angle; luminosity leveling may be done via bunch length and via  * 50-ns option: has fewer longer bunches of higher charge ; can be realized with NbTi technology if needed ; compatible with LHCb ; open issues are SPS & beam-beam effects at large Piwinski angle; luminosity leveling may be done via bunch length and via  * b

Name Event Date Name Event Date 31 W. Scandale/F. Zimmermann, recommendations luminosity leveling should be seriously considered: → higher quality events, moderate decrease in average luminosity luminosity leveling should be seriously considered: → higher quality events, moderate decrease in average luminosity it seems long-bunch 50-ns option entails less risk and less uncertainties; however not w/o problems it seems long-bunch 50-ns option entails less risk and less uncertainties; however not w/o problems leaving the 25-ns option as back up until we have gained some experience with the real LHC may be wise leaving the 25-ns option as back up until we have gained some experience with the real LHC may be wise needed for both scenarios are concrete optics solutions, beam-beam tracking studies, and beam-beam machine experiments needed for both scenarios are concrete optics solutions, beam-beam tracking studies, and beam-beam machine experiments

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 appendix

Name Event Date Name Event Date 33 W. Scandale/F. Zimmermann, ) quadrupole 1 st preferred over dipole 1 st 2) pushed NbTi or Nb 3 Sn still pursued, or hybrid solution - new 3) slim magnets inside detector (“D0 and Q0”) – new 4) wire compensation ~established; electron lens – new 5) crab cavities: large angle rejected; small-angle – new 6) 12.5-ns scenario strongly deprecated 7) e-cloud/pile-up compromise: 25-ns w  *~8 cm, or 50- ns spacing,  *=0.25 m, long bunches – new Reminder of LUMI’06 Outcome IR upgrade and beam parameters

LHC Upgrade Beam Parameters, Frank ZimmermannW. Scandale/F. Zimmermann, PAF/POFPA Meeting 20 November parasitic collisions at 4-5  offset in 25-ns low-  case concerns: poor beam lifetime enhanced detector background discouraging experience at RHIC, SPS, HERA and Tevatron

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 RHIC experiments in 2005 and 2006 single off-center collision one collision with 5-6  offset strongly reduces RHIC beam lifetime; worse at smaller offsets (W. Fischer et al.) 24 GeV 100 GeV

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 proton background with 1 head-on and 1 off-center collision vs beam-beam separation (K. Cornelis, LHC99); significantly affected by single LR collision at 3  (W.Herr  see also PhD thesis M.Meddahi, CERN SL/91-30, Fig. 22 SPS collider ~1980s

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 HERA ~1992 proton beam lifetime drops from 50 h to 1-5 h for single off-center collision with beam-beam separation between 0.3 and 2  (F. Willeke & R. Brinkmann, PAC 93; T. Limberg, LHC’99) Tevatron 2006 removal of the four closest long-range collisions at about 6.2  separation has increased integrated Tevatron luminosity per run by up to 30%  (V. Shiltsev, private communication)

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 shorter bunches for 25 ns? reduced longitudinal emittance 2.5 eVs → 1.78 eVs (loss of Landau damping if  z 5 f rf 3 V rf < const N b Im(Z || /n); also stronger IBS) 43 MV rf voltage at 1.2 GHz (nominal LHC: 16 MV at 400 MHz) not sufficient to avoid large luminosity loss (for which crab cavities are needed anyhow)

bunch shortening rf voltage: crab cavity rf voltage: unfavorable scaling as 4 th power of crossing angle and inverse 4 th power of IP beam size; can be decreased by reducing the longitudinal emittance; inversely proportional to rf frequency proportional to crossing angle & independent of IP beam size; scales with 1/R 12 ; also inversely proportional to rf frequency

LUMI’05

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 LHCb recipe for 50-ns scenario add satellites at 25 ns spacing these can be produced by highly asymmetric bunch splitting in the PS (possibly large fluctuation) in LHCb satellites collide with main bunches satellite intensity should be lower than 3x10 10 p/bunch to add <5% to beam-beam tune shift and to avoid e-cloud problems; 3x10 10 ~ 1/16 th of main-bunch charge  function of ~3 m would result in desired luminosity equivalent to 2x10 33 cm -2 s -1 ; easily possible with present IR magnets & layout

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 here head-on collisions unavoidably contribute to beam-beam tune shift of the bunches colliding in ATLAS & CMS two potential ways out: –collisions with transverse offset; concerns: offset stability, interference with collimation, poor beam lifetime, detector background –collide at LHCb only in later part of each store, when the beam-beam tune shift from IP1 & 5 has decreased (H. Dijkstra) LHCb schemes for 25-ns scenario

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 L = L 0 exp (-d 2 /(4  2 )) LHCb collisions with transverse offset d luminosity:  Q LHCb = 2  Q IP1or5 / (d/  2 tune shift: suppose tune shift from LHCb should be less than 10% of that from CMS or ATLAS → d>4.5  then luminosity L ~ L 0 if we wish L LHCb ~0.01 L IP1or5 (~1-2x10 33 cm -2 s -1 ) we need  * ~0.08 m → IR triplet upgrade! offset collisions w/o IR upgrade L LHCb ~ 4x10 31 cm -2 s -1 (for Gaussian distribution)

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 LHCb luminosity for 25 ns with offset & 50 ns 25 ns spacing, 4.5  offset,  *~0.08 m 50 ns spacing, satellites LHCb 50-ns luminosity decays 2x more slowly than 25-ns luminosity or that at ATLAS and CMS

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November ns spacing 50 ns spacing tune shift during store for 25-ns & 50-ns spacing change  Q ~ LHCb 25-ns collisions from middle of each store?!  *~3 m (5 h turnaround time is assumed)

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 LHCb luminosity for 25-ns late collisions & 50 ns 25 ns spacing,  * ~ 3 m, no transverse offset 50 ns spacing,  *~3 m, satellites (5 h turnaround time is assumed)

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 S-LHCb collision parameters parametersymbol25 ns, offset25 ns, late collision50 ns, satellites collision spacingT coll 25 ns protons per bunchN b [10 11 ] & 0.3 longitudinal profileGaussian flat rms bunch length  z [cm] beta* at LHCb  [m] rms beam size  x,y * [  m] 640 rms divergence  x’,y’ * [  rad] 8013 full crossing angle  c [urad] Piwinski parameter  c  z /(2*  x *) peak luminosityL [10 33 cm -2 s -1 ] effective luminosity (5 h turnaround time)L eff [10 33 cm -2 s -1 ] initial lumi lifetime  L [h] length of lum. region  l [cm] rms length of luminous region:

LHC Upgrade Beam Parameters, Frank ZimmermannF. Zimmermann, W. Scandale, PAF/POFPA Meeting 20 November 2006 beam intensity decays linearly length of run average luminosity leveling equations