1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Lecture 9: Scheduling (Chapter 27) Mehran Rezaei.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Chapter 7 Project Scheduling and Tracking. 2 Write it Down! SoftwareProjectPlan Project Scope EstimatesRisksSchedule Control strategy.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Chapter 24 Project Scheduling and Tracking
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Scheduling and Tracking
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Project Management Methodology Project monitoring and control.
Process: A Generic View n A software process  is a roadmap to building high quality software products.  provides a framework for managing activities.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
1. Earned Value Analysis (EVA) Earned value is a measure of progress enables us to assess the “percent of completeness” of a project using quantitative.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 COSC 4406 Software Engineering COSC 4406 Software Engineering Haibin Zhu, Ph.D. Dept. of Computer Science and mathematics, Nipissing University, 100.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Lecture 7 Project Scheduling and Tracking
Software Project Management Lecture # 7. Outline Project Scheduling.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Chapter 7 Project Scheduling and Tracking. 2 Project Scheduling   Includes   Task Sets   Concept Development   Project Tracking   Involves.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Chapter 24 Software Project Scheduling - Introduction - Project scheduling - Task network - Timeline chart - Earned value analysis (Source: Pressman, R.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
Lecture 18: Chapter 27 Project Scheduling
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Scheduling & Tracking. Why Software Is Delivered Late? An unrealistic deadline Changing but unpredicted customer requirements Underestimation.
1 These slides are designed to accompany Software Engineering: A Practitioner’s Approach, 7/e (McGraw-Hill 2009). Slides copyright 2009 by Roger Pressman.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1.  an unrealistic deadline established by someone outside the software development group  changing customer requirements that are not reflected in.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
1 Chapter 24 Project Scheduling and Tracking Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Scheduling, Tracking & Communication Aug, 2010 Presented by: Alok Wadehra.
Monitoring Risk Factors General attitude of team members based on project pressures The degree to which the team is jelled Interpersonal relationships.
PROJECT SCHEDULING AND TRACKING
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Software Engineering (CSI 321) Project Scheduling 1.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Project Scheduling. Why Are Projects Late? an unrealistic deadline established by someone outside the software development group changing customer requirements.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
1 Chapter 24 Project Scheduling and Tracking Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman.
Chapter 24 Project Scheduling and Tracking
Chapter 34 Project Scheduling
Project Scheduling.
For University Use Only
Software Engineering Fall 2005
Software Engineering (CSI 321)
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
For University Use Only
Software Engineering: A Practitioner’s Approach, 6/e Chapter 23 Estimation for Software Projects copyright © 1996, 2001, 2005 R.S. Pressman & Associates,
Chapter 27 Project Scheduling
Chapter 34 Project Scheduling
Presentation transcript:

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Software Engineering: A Practitioner’s Approach, 6/e Chapter 24 Project Scheduling and Tracking Software Engineering: A Practitioner’s Approach, 6/e Chapter 24 Project Scheduling and Tracking copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc. For University Use Only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioner's Approach. Any other reproduction or use is expressly prohibited.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Why Are Projects Late? an unrealistic deadline established by someone outside the software development group an unrealistic deadline established by someone outside the software development group changing customer requirements that are not reflected in schedule changes; changing customer requirements that are not reflected in schedule changes; an honest underestimate of the amount of effort and/or the number of resources that will be required to do the job; an honest underestimate of the amount of effort and/or the number of resources that will be required to do the job; predictable and/or unpredictable risks that were not considered when the project commenced; predictable and/or unpredictable risks that were not considered when the project commenced; technical difficulties that could not have been foreseen in advance; technical difficulties that could not have been foreseen in advance; human difficulties that could not have been foreseen in advance; human difficulties that could not have been foreseen in advance; miscommunication among project staff that results in delays; miscommunication among project staff that results in delays; a failure by project management to recognize that the project is falling behind schedule and a lack of action to correct the problem a failure by project management to recognize that the project is falling behind schedule and a lack of action to correct the problem

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Scheduling Principles compartmentalization—define distinct tasks compartmentalization—define distinct tasks interdependency—indicate task interrelationship interdependency—indicate task interrelationship effort validation—be sure resources are available effort validation—be sure resources are available defined responsibilities—people must be assigned defined responsibilities—people must be assigned defined outcomes—each task must have an output defined outcomes—each task must have an output defined milestones—review for quality defined milestones—review for quality

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Effort and Delivery Time

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Effort Allocation 40-50% 30-40% “front end” activities “front end” activities customer communication customer communication analysis analysis design design review and modification review and modification construction activities construction activities coding or code generation coding or code generation testing and installation testing and installation unit, integration unit, integration white-box, black box white-box, black box regression regression 15-20%

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Defining Task Sets determine type of project determine type of project assess the degree of rigor required assess the degree of rigor required identify adaptation criteria identify adaptation criteria select appropriate software engineering tasks select appropriate software engineering tasks

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Task Set Refinement 1.1Concept scoping determines the overall scope of the project. Task definition: Task 1.1 Concept Scoping 1.1.1Identify need, benefits and potential customers; 1.1.2Define desired output/control and input events that drive the application; Begin Task FTR: Review written description of need FTR indicates that a formal technical review (Chapter 26) is to be conducted Derive a list of customer visible outputs/inputs FTR: Review outputs/inputs with customer and revise as required; endtask Task Define the functionality/behavior for each major function; Begin Task FTR: Review output and input data objects derived in task 1.1.2; Derive a model of functions/behaviors; FTR: Review functions/behaviors with customer and revise as required; endtask Task Isolate those elements of the technology to be implemented in software; 1.1.5Research availability of existing software; 1.1.6Define technical feasibility; 1.1.7Make quick estimate of size; 1.1.8Create a Scope Definition; endTask definition: Task 1.1 is refined to

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Define a Task Network

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Timeline Charts Tasks Week 1 Week 2 Week 3 Week 4 Week n Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Use Automated Tools to Derive a Timeline Chart

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Schedule Tracking conduct periodic project status meetings in which each team member reports progress and problems. conduct periodic project status meetings in which each team member reports progress and problems. evaluate the results of all reviews conducted throughout the software engineering process. evaluate the results of all reviews conducted throughout the software engineering process. determine whether formal project milestones (the diamonds shown in Figure 24.3) have been accomplished by the scheduled date. determine whether formal project milestones (the diamonds shown in Figure 24.3) have been accomplished by the scheduled date. compare actual start-date to planned start-date for each project task listed in the resource table (Figure 24.4). compare actual start-date to planned start-date for each project task listed in the resource table (Figure 24.4). meet informally with practitioners to obtain their subjective assessment of progress to date and problems on the horizon. meet informally with practitioners to obtain their subjective assessment of progress to date and problems on the horizon. use earned value analysis (Section 24.6) to assess progress quantitatively.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Progress on an OO Project-I Technical milestone: OO analysis completed Technical milestone: OO analysis completed All classes and the class hierarchy have been defined and reviewed. All classes and the class hierarchy have been defined and reviewed. Class attributes and operations associated with a class have been defined and reviewed. Class attributes and operations associated with a class have been defined and reviewed. Class relationships (Chapter 8) have been established and reviewed. Class relationships (Chapter 8) have been established and reviewed. A behavioral model (Chapter 8) has been created and reviewed. A behavioral model (Chapter 8) has been created and reviewed. Reusable classes have been noted. Reusable classes have been noted. Technical milestone: OO design completed Technical milestone: OO design completed The set of subsystems (Chapter 9) has been defined and reviewed. The set of subsystems (Chapter 9) has been defined and reviewed. Classes are allocated to subsystems and reviewed. Classes are allocated to subsystems and reviewed. Task allocation has been established and reviewed. Task allocation has been established and reviewed. Responsibilities and collaborations (Chapter 9) have been identified. Responsibilities and collaborations (Chapter 9) have been identified. Attributes and operations have been designed and reviewed. Attributes and operations have been designed and reviewed. The communication model has been created and reviewed. The communication model has been created and reviewed.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Progress on an OO Project-II Technical milestone: OO programming completed Technical milestone: OO programming completed Each new class has been implemented in code from the design model. Each new class has been implemented in code from the design model. Extracted classes (from a reuse library) have been implemented. Extracted classes (from a reuse library) have been implemented. Prototype or increment has been built. Prototype or increment has been built. Technical milestone: OO testing Technical milestone: OO testing The correctness and completeness of OO analysis and design models has been reviewed. The correctness and completeness of OO analysis and design models has been reviewed. A class-responsibility-collaboration network (Chapter 8) has been developed and reviewed. A class-responsibility-collaboration network (Chapter 8) has been developed and reviewed. Test cases are designed and class-level tests (Chapter 14) have been conducted for each class. Test cases are designed and class-level tests (Chapter 14) have been conducted for each class. Test cases are designed and cluster testing (Chapter 14) is completed and the classes are integrated. Test cases are designed and cluster testing (Chapter 14) is completed and the classes are integrated. System level tests have been completed. System level tests have been completed.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Earned Value Analysis (EVA) Earned value is a measure of progress enables us to assess the “percent of completeness” of a project using quantitative analysis rather than rely on a gut feeling “provides accurate and reliable readings of performance from as early as 15 percent into the project.” [FLE98]

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Computing Earned Value-I The budgeted cost of work scheduled (BCWS) is determined for each work task represented in the schedule. The budgeted cost of work scheduled (BCWS) is determined for each work task represented in the schedule. BCWS i is the effort planned for work task i. BCWS i is the effort planned for work task i. To determine progress at a given point along the project schedule, the value of BCWS is the sum of the BCWS i values for all work tasks that should have been completed by that point in time on the project schedule. To determine progress at a given point along the project schedule, the value of BCWS is the sum of the BCWS i values for all work tasks that should have been completed by that point in time on the project schedule. The BCWS values for all work tasks are summed to derive the budget at completion, BAC. Hence, The BCWS values for all work tasks are summed to derive the budget at completion, BAC. Hence, BAC = ∑ (BCWS k ) for all tasks k BAC = ∑ (BCWS k ) for all tasks k

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Computing Earned Value-II Next, the value for budgeted cost of work performed (BCWP) is computed. Next, the value for budgeted cost of work performed (BCWP) is computed. The value for BCWP is the sum of the BCWS values for all work tasks that have actually been completed by a point in time on the project schedule. The value for BCWP is the sum of the BCWS values for all work tasks that have actually been completed by a point in time on the project schedule. “the distinction between the BCWS and the BCWP is that the former represents the budget of the activities that were planned to be completed and the latter represents the budget of the activities that actually were completed.” [WIL99] “the distinction between the BCWS and the BCWP is that the former represents the budget of the activities that were planned to be completed and the latter represents the budget of the activities that actually were completed.” [WIL99] Given values for BCWS, BAC, and BCWP, important progress indicators can be computed: Given values for BCWS, BAC, and BCWP, important progress indicators can be computed: Schedule performance index, SPI = BCWP/BCWS Schedule performance index, SPI = BCWP/BCWS Schedule variance, SV = BCWP – BCWS Schedule variance, SV = BCWP – BCWS SPI is an indication of the efficiency with which the project is utilizing scheduled resources. SPI is an indication of the efficiency with which the project is utilizing scheduled resources.

These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, Computing Earned Value-III Percent scheduled for completion = BCWS/BAC Percent scheduled for completion = BCWS/BAC provides an indication of the percentage of work that should have been completed by time t. provides an indication of the percentage of work that should have been completed by time t. Percent complete = BCWP/BAC Percent complete = BCWP/BAC provides a quantitative indication of the percent of completeness of the project at a given point in time, t. provides a quantitative indication of the percent of completeness of the project at a given point in time, t. Actual cost of work performed, ACWP, is the sum of the effort actually expended on work tasks that have been completed by a point in time on the project schedule. It is then possible to compute Actual cost of work performed, ACWP, is the sum of the effort actually expended on work tasks that have been completed by a point in time on the project schedule. It is then possible to compute Cost performance index, CPI = BCWP/ACWP Cost performance index, CPI = BCWP/ACWP Cost variance, CV = BCWP – ACWP Cost variance, CV = BCWP – ACWP