ACTAR Nov 05 Lolly Pollacco CEA Saclay Front End Electronics for ACTAR.

Slides:



Advertisements
Similar presentations
TDC130: High performance Time to Digital Converter in 130 nm
Advertisements

Towards HadronPhysics3 Towards HadronPhysics3. JointGEM continuation  readout electronics  n-XYTER ?  T2K After ?  active TPC  large area prototype.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Front-end electronics for the LPTPC  Connectors  Cables  Alice readout electronics  New developments  New ideas  Open questions Leif Jönsson Phys.
JRA01: ACTAR Collaboration : GANIL, DAPNIA Saclay, CENBG Bordeaux, Univ. Liverpool, Daresbury, GSI, Univ. Santiago de Compostela Objectives: Investigate.
1 ACTAR meeting – Santiago March 2008 Requirements Features required not available in standard ASICs for HEP: Auto-triggerable. Large dynamic range. Low.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
General Electronics for Time projection chambers GET a Multi-Project for IRFU/SPhN, GANIL, GSI, Compostela, CENBG, NSCL/MSU, Darsebury, York General Electronics.
Darsebury June - Lolly ACTAR. Darsebury June - Lolly Si – TOF/ Active Target Si - PSD Si – DE-E Si/CsI - Tracking SPIRAL2 NuStar A 50 keV.
- Frédéric Druillole - Présentation du SEDI 1 30/06/2015 Complete electronic Readout for Active Target (CERAT) Project Project Physicist’s demands Physicist’s.
Pattern Gas Detectors. Towards an R&D Collaboration CERN, 10 September P. Baron1, A. Delbart1, X. de la Broise1, D. Calvet1,
14-5 January 2006 Luciano Musa / CERN – PH / ED General Purpose Charge Readout Chip Nikhef, 4-5 January 2006 Outline  Motivations and specifications 
Front-end electronics for the LPTPC  System lay out  End-cap and panels  Mechanics for the front-end electronics  Connectors and cables  Front-end.
Overview of the read-out electronics for the TPCs at T2K ND280m P. Baron, D. Calvet, X. De La Broïse, E. Delagnes, F. Druillole, J-L Fallou, J-M. Reymond,
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
Readout ASIC for SiPM detector of the CTA new generation camera (ALPS) N.Fouque, R. Hermel, F. Mehrez, Sylvie Rosier-Lees LAPP (Laboratoire d’Annecy le.
P. Baron CEA IRFU/SEDI/LDEFACTAR WORKSHOP Bordeaux (CENBG) June 17, Functionality of AFTER+ chip applications & requirements At this time, AFTER+
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
1 E. Delagnes Saclay Dec 3rd CLAS12 Micromegas Tracker: FE electronics
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
P. Baron CEA IRFU/SEDI/LDEFACTAR Meeting Santiago de Compostela March 11, A review of AFTER+ chip Its expected requirements At this time, AFTER+
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
JRA01: ACTAR Task J01-1: Physics constraints and detailed simulations Subtask J01-1-1: Physics constraints Subtask J01-1-1: Simulations Task J01-2: Test.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
Como, October 15-19, 2001H.R. Schmidt, GSI Darmstadt 1 The Time Projection Chamber for the CERN- LHC Heavy-Ion Experiment ALICE ALICE Detector overview.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
1 Luciano Musa, Gerd Trampitsch A General Purpose Charge Readout Chip for TPC Applications Munich, 19 October 2006 Luciano Musa Gerd Trampitsch.
EUDET Annual Meeting 2008, TPC Task K. Dehmelt 1 Status Report TPC Task Klaus Dehmelt DESY EUDET Annual Meeting Oct-2008.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
A. SarratTPC jamboree, Aachen, 14/03/07 1 Full Monte Carlo of a TPC equipped with Micromegas Antony Sarrat CEA Saclay, Dapnia Motivation Simulation content.
1 Characterization of the PCA16 CERN, 14 th July 2008 M. Mager, L. Musa.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Pixel detector development: sensor
TPC electronics Status, Plans, Needs Marcus Larwill April
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
ASIC Development for Vertex Detector ’07 6/14 Y. Takubo (Tohoku university)
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
GET is a relatively unique project in data capture for Nucl. Phys. because:- – G : for Generic – Multi national lab collaboration – Multi project application:-
1 E. Delagnes Saclay Dec 3rd FE electronics for Micromégas Trackers
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Architecture and Implementation of the Front-End Electronics of the Time Projection Chambers in the T2K Experiment P. Baron, D. Besin, D. Calvet, C. Coquelet,
CEA DSM Irfu IDeF-X HD Imaging Detector Front-end for X-ray with High Dynamic range Alicja Michalowska, CEA-IRFU 1 Journées VLSI June 2010.
ASAD Workshop Saclay (CEA Irfu) November 25, AGET circuit: Application Information actar.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
The AGET chip Circuit overview, First data & Status
Data Reduction Schemes for MicroBoone Wu, Jinyuan Fermilab.
FEE for TPC MPD__NICA JINR
ALICE INDUSTRIAL AWARD for its collaboration to the ALTRO Chip
A General Purpose Charge Readout Chip for TPC Applications
Readiness of the TPC P. Colas What is left before final design?
A Readout Electronics System for GEM Detectors
TDC at OMEGA I will talk about SPACIROC asic
TPC electronics for ILD
TPC electronics design - GdSP
A Low Power Readout ASIC for Time Projection Chambers in 65nm CMOS
TPC electronics Atsushi Taketani
Valter Bonvicini, Giulio Orzan, Nicola Zampa, Gianluigi Zampa
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
Presented by T. Suomijärvi
Presentation transcript:

ACTAR Nov 05 Lolly Pollacco CEA Saclay Front End Electronics for ACTAR

ACTAR Nov 05 Lolly Pollacco CEA Saclay What Are Our Specs? - Simulation Energy Deposit –Particle dynamic range – p  U –Stopping of particle in gas –Pad density –… Particle Multiplicity Channels –Number of channels –Power consumption –… External/Internal Trigger On-Line processing … What Are Our Inputs? Budget Manpower –Engineers – Electronics –Physicists - Simulations

ACTAR Nov 05 Lolly Pollacco CEA Saclay Possible Sol n GASSIPLEX –DRIFT/SeD/MAYA – CERN –16 cannels T2K –Neutrino TPC –DSM/SEDI – Saclay –Can modify eventually & local experts –64 channels –2 msec ALTRO – ALICE TPC Readout Chip – CERN –16 channels –No dead-time …

ACTAR Nov 05 Lolly Pollacco CEA Saclay T2K Specs PARAMETERVALUE Number of Channels72 Number of Time Bins512 MIP value (MICROMEGAS)12fC to 60fC MIP value (GEM)Need values MIP to noise ratio100 Dynamic Range10 MIPS on 12 bits I.N.L1% 0-3 MIPS; 5% 3-10 MIPS GainAdjustable (4 values) Sampling Frequency1MHz to 50MHz Shaping Time200ns to 4us Readout Frequency20 MHz to 25MHZ Polarity of the detector signalPositive or Negative CalibrationSelection 1 / 72 TestInternal Test capacitor for each channels Power< 3mW / Channel

ACTAR Nov 05 Lolly Pollacco CEA Saclay T2K Chip components Serial Interface Trigger CK In Test 512 cells SCA FILTER Tpeak;Gain CSA 1 channel X724 BUFFER SLOW CONTROL TESTSCA MANAGER StopCK ADC Asic T2K GAIN

ACTAR Nov 05 Lolly Pollacco CEA Saclay ALTRO PA (PASA) +System Chip(ALTRO) System chip –ADC + Correction + … ADC 10 bits 10 & 40 MHz Operated at IPN Orsay and Saclay Expensive Power hungry (35 mW/channel) It is built & it works

ACTAR Nov 05 Lolly Pollacco CEA Saclay

STMicroelectronics TSA1001 ADC 10 – 40 Mhz, 11 bits

ACTAR Nov 05 Lolly Pollacco CEA Saclay