Dr Rakesh Dubey Director Disaster Management Institute Bhopal Hazards Identification and Risk Assessment And On-site and off-site.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Dr Rakesh Dubey Director Disaster Management Institute Bhopal
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
Determining the Significant Aspects
Development of Tools for Risk Assessment and Risk Communication for Hydrogen Applications By Angunn Engebø and Espen Funnemark, DNV ICHS, Pisa 09. September.
CE 510 Hazardous Waste Engineering
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Wingra Engineering, S.C.1 Evaluating Local Impacts of a Utility SCR Retrofit Project Steven Klafka, PE, DEE Wingra Engineering, S.C. A&WMA Conference 2002.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Integrated Risk Management and Risk Communications David DeGagne, Executive Director Centre for Risk Management Tel: Fax: Web:
Mr. R. R. Diwanji Techniques for Safety Improvements.
1 Chemical Hazards. 2 Purpose of Lectures on Chemical Safety To understand the hazardous properties of chemicals prior to their use. To transport / handle.
Present Status of Chemical (industrial) Disaster Risk Management and future Strategies Dr Rakesh Dubey Director Disaster Management Institute Bhopal October.
Contractor Management and ISO 14001:2004
Health Aspect of Disaster Risk Assessment Dr AA Abubakar Department of Community Medicine Ahmadu Bello University Zaria Nigeria.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
HSE for Supervisors HEMP Module
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
DELIVERING SAFE & RELIABLE OPERATION
Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans Dr. R. Dubey - DMI.
Project Risk Management
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
ISO EMERGENCY PREPAREDNESS AND RESPONSE
ForYourTodayForTheirTomorrowForYourTodayForTheirTomorrow SPCC Spill Prevention Control and Countermeasures September 2003.
Hazards Analysis. The Next 55 Minutes... l Overview of Hazards Analysis l Scenarios for EPCRA and RMP l Resources.
Ship Recycling Facility Management System IMO Guideline A.962
Ert 312 LECTURE 4 OSHA & DOSH.
ISO 14001:2004, Environmental Management System
Engineering Risk Assessments and Risk Communication Sarah Arulanandam, Hazard and Risk Group RWDI West Inc. DISCLOSURE OF MATERIAL ENVIRONMENTAL EXPOSURES:
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
RISK ASSESSMENT. What is Risk Assessment? It is an examination of what we do, to determine the things that can cause harm to people It allows us to decide.
Introduction to Risk Management C7 Slide 1. The Concept of Safety  ‘Safety’ refers to the reduction of risk to a tolerable level  Risk = Likelihood.
Introduction to Workplace Safety
Present Status of Chemical (industrial) Disaster Risk Management and future Strategies Dr Rakesh Dubey Director Disaster Management Institute Bhopal August.
Layers of Protection Analysis
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
National Action Plan on Chemical (industrial) Disaster Risk Management: Perception, approach and challenges Dr Rakesh Dubey Director Disaster Management.
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
Hazards Identification and Risk Assessment
Responsible Care® Distribution Code of Management Practices.
Industrial Disaster Risk Management and future Strategies Dr Rakesh Dubey Director Disaster Management Institute Bhopal Bend Joints Pvt Ltd
Risk management and disaster preparedness
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
THE FOUR PHASES OF EMERGENCY MANAGEMENT. GIS and Preparedness The process of identifying potential emergency management problems that a community may.
CONSEQUENCE ASSESSMENT. Consequence Assessment Definition: The analysis, evaluation, and interpretation of available information associated with an actual.
Visit us at E mail: Tele:
Chapter 3: Business Continuity Planning. Planning for Business Continuity Assess risks to business processes Minimize impact from disruptions Maintain.
Hazard Mitigation Plan Update Lancaster County Final Public Meeting April 26, 2013.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Risk Assessment: A Practical Guide to Assessing Operational Risk
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Industrial Emergency Response for Municipal-Based Responders.
1.
Off-site Emergency Management Planning
HSE Case: Risk Based Approach.
Risk Reduction Potential of Accident Mitigation Features
Sandia National Laboratories
Quantitative Risk Assessment
Terminologies on On-site and Off-site Disasters Management
Effective Risk Management in Decision Making Process
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
Project Risk Management Jiwei Ma
Presentation transcript:

Dr Rakesh Dubey Director Disaster Management Institute Bhopal Hazards Identification and Risk Assessment And On-site and off-site Emergency Management Plans

Hazardous gases/liquids in Indian Industries LPG, Propane ( under pressure in liquid phase) Ammonia ( under pressure/refrigeration in liquid phase) Chlorine ( under pressure in liquid phase ) Hydrogen ( under pressure in gases)

Causality chain Emission Environmental distribution Exposure Effects MODELLING or MONITORING

Sources Source types Source types: Point sources Line sources Diffuse sources

Types of Emissions Continuous emissions Intermittent emissionsPeak emissionsBlock emissions

Spatial scales Local scale Local scale Area around one point source Area around one point source Average environmental characteristics Average environmental characteristics “ Reasonable worst case ” scenario “ Reasonable worst case ” scenario Regional scale Regional scale Area of 200 x 200 km Area of 200 x 200 km 20 million inhabitants 20 million inhabitants 100 or 10% of production 100 or 10% of production Average environmental characteristics Average environmental characteristics

Key Points: RAIN! R ecognize A void I solate N otify What can I do?

Recognize Unusual Activity / Behavior Hazardous weather conditions Things out of place Unexplained liquids Strange smells Abnormal fogs or mists Suspicious Packages ?

Avoid What Do I Stay Away From? Don’t assume anything Don’t become a victim Don’t rush in Don’t TEST (Taste, Eat, Smell, Touch) The 4 Don’ts

Isolate Keep others away from hazard area

Notify Immediate Supervisor Hospital Emergency Phone Number Remember RAIN! Recognize, Avoid, Isolate, Notify

RAIN! Example #1 Recognize: Suspicious Package Avoid: Do not touch object Isolate: Contain the area & keep others away from hazard area Notify: Call for help

RAIN! Example #2 Recognize: Chemical Spill Avoid: Do not touch, taste, or smell Isolate: Contain the scene & keep others away from hazard area Notify: Call for help

Industrial Disaster Management Cycle: OECD

What to do? How to do? Is there any way exists?

Disaster Management Planning both on- site (Schedule 11) and off-site (Schedule 12) of MS&IHC Rules 1989 of EPA 1986 with following components: A. Risk Assessment & Management B. Emergency Preparedness C. Community Dialogue

Part one Disaster Impact Assessment Toxic release, heat fluxes, pressure waves

Risk Assessment & Management 1. evaluate range of potential incidents (without considering possible causes) 2. put mitigation in place for foreseeable ones 3. evaluate community consequences for range of incidents,

a) credible worst case - largest tank or worst failure consequence - reasonable duration of release - passive mitigation in effect - credible worst weather b) worst imaginable case - largest tank or worst failure consequence - worst possible duration or release - no mitigation - worst possible weather

Reliability Risk Assessment Risk Based Maintenance Planning Risk estimation Hazard identification Quantitative Hazard Assessment Probabilistic Hazard Assessment Risk Quantification Risk evaluation Setting up risk acceptance criteria Risk comparison Maintenance planning

Hazard identification Accident scenario development Fault tree development Quantitative hazard assessment Probabilistic hazard assessment Consequences analysis Fault tree analysis Risk estimation Whether risk is in acceptance? Suggest maintenance measures to control risk Apply maintenance measures and re- evaluate risk No End Yes Start Fault tree for the envisaged scenario What may go wrong? What would be the impacts? How it may go wrong? How likely its occurrence? What maintenance schedule would reduce its likelihood of occurrence?

Storage Conditions Atmospheric Storage Pressure Storage Fully Refrigerated Storage Semi-Refrigerated Storage Gas Under Pressure Which condition is leading to significant impacts

On-site Risk Off-site Risk

Hazards identification : Materials, process, regulatory, Consequence of hazards Likely hood of consequences Frequency of occurrence Calculation of Risk Decision for weighing alternatives

Part two Preparedness, Planning, Response

By putting prevention techniques Through planning By response plans Through mitigation Education and awareness Best practices

ALARP

ALARP means ‘As Low As Reasonable Practicable’ ALARP demonstration means: To demonstrate that the project & associated systems and HSEMS will enable the facility to be operated & maintained safely such that residual risks to HSE are tolerable

Good practices Technical approaches

Management review

Transport Sector

How plan should be made more use full for Top Management Communication

Living with the risks with continuous improvement: UN ’ s Statement of 2 nd WCDR Kobe Japan

Don ’ t forget to visit