Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community www.mobile-bambini.eu.

Slides:



Advertisements
Similar presentations
1 ECOMM 2010 moving people – bridging spaces How klima:aktiv mobil helps to move and bridge DI Robert Thaler Head of Division Transport,
Advertisements

Attaining Energy Efficient Mobility in an Ageing Society The AENEAS project Matthias Fiedler Rupprecht Consult.
Capacity Building for Public Health and Health Promotion in Central and Eastern Europe Caroline Costongs Programme Manager EuroHealthNet
Cyclelogistics – moving Europe forward IEE/10/277/SI May 2011 – May
The Business Support Professional Career Pathway Leonardo Partnership Management Meeting CECA´s headquarter Seville, Spain March 2010.
ARTEMIS Industry Association & ARTEMIS Joint Undertaking ARTEMIS Industry Association The association for R&D actors in embedded systems.
You are a Smart Consumer USmartConsumer Contract number: 13/590/SI Project duration: 36 months (03/ /2017) Last modified: USmartConsumer.
EU-wide establishment of enduring national and European support networks for sustainable urban mobility Contract Number: IEE/12/698/SI Duration:
1 eBRIDGE: empowering e-fleets for business and private purposes in cities The sole responsibility for the content of this publication lies with the authors.
“Low cost ZERO WASTE Municipality” Under the MED programme, Objective 2.1: Protection and enhancement of natural resources and heritage 1 Project.
The PASTA project in short Bike it. Walk it. Live it. This project has received funding from the European Union’s Seventh Programme for Research, Technological.
You are a Smart Consumer USmartConsumer Contract number: 13/590/SI Project duration: 36 months (03/ /2017) Last modified:
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Renovation through quality supply chains and energy performance certification standards EU programme supported by Intelligent Energy Europe.
CH4LLENGE Project Presentation. Sustainable Urban Mobility Plan (SUMP): – strategic document designed to contribute to meeting.
UNLEASH MICROHYDRO POTENTIAL IN EUROPE. Renewable Energy Sources Transforming Our Regions (RESTOR) Hydro is a project is co-financed by the European Commission.
More biking in small and medium sized towns of Central and Eastern Europe by 2020 mobile2020 IEE/10/166/SI Project duration May May 2014.
Main Objective The main objective of ACTIVE ACCESS is to increase the use of cycling but especially walking for short everyday trips.
CONNECT – Developing & Disseminating Excellent Mobility Management Measures for Young People Final summary slides September 2010 Grant agreement number:
The IUSES Educational Toolkit Introduction to IUSES Intelligent Use of Energy at School The sole responsibility for the content of this presentation lies.
TOOL & ALL Conference IASI 2009 A.P.P.L.E. EDUCATIONAL PACKAGE An innovative method of learning foreign languages for preschool children. European Language.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
LifeCycle - Cycling as a life long approach Bike Brno Conference Karl Reiter, FGM-AMOR LifeCycle Cycling as a life long approach.
IEE/08/631/SI Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community
ECOMOBILITY SCHEME TO INCENTIVIZE ENERGY-EFFICIENT TRANSPORT ECOMOBILITY SHIFT IEE/09/924/SI – ECOMOBILITY SHIFT –
INSPIRE/GINIE Workshop Objectives To discuss directions for the construction of a European Spatial Data Infrastructure (ESDI) Share the current State of.
IEE/10/SI May May 2014 (36 Months) The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
How to Use the Structural Funds ? 1.Financing sustainable energy projects. 2.Practical support – RUSE operation. Jana Cicmanova Energie-Cités.
Strengthening global awareness in the local communities - Kolping 2020 Strategy.
Project duration: 36 months ( – ) Contract number: IEE/12/738/SI
Welcome to the E-learning Training Course on Urban Sustainability & Green Economy: Chinese and European Practices March 21.
CONNECT – Developing & Disseminating Excellent Mobility Management Measures for Young People Workshop ‘STEER - A recipe for sustainability’ 1-2 July 2014.
REALISING POTENTIAL Social services and active inclusion John Halloran Director European Social Network Social Services In Europe
EUROPEAN REGIONAL DEVELOPMENT FUND Insight into interregional cooperation Elena Ferrario| Project Officer Joint Technical Secretariat FLIPPER final conference.
The AENEAS project and best practice from SALZBURG Angelika Gasteiner Customer Service & Marketing at public transport company Salzburg - Austria.
The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Communities.
Solar thermal applications in Eastern Europe with Guaranteed Solar Results Solar thermal applications in EASTern Europe with Guaranteed Solar Results EAST-GSR.
ENABLE Building capacity in renewables in the health, education and water sectors to help meet poverty reduction targets in sub-Saharan Africa January.
Renovation through quality supply chains and energy performance certification standards REQUEST EU programme supported by Intelligent Energy Europe IEE/09/870/SI
ICHNOS Plus Opening Conference Cagliari, 11 Dicembre 2008.
Schools for Health in Europe SHE Goof Buijs NIGZ 8 June 2008 Vancouver, partnership track.
Supported by The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the Community. The.
Beispielbild Schools At University for Climate and Energy – SAUCE Project slides Contract no.: IEE/07/816-SI project duration: 01/09/2008 – 31/08/2011.
Susanne Wrighton, Karl Reiter. Socialisation towards motorised traffic.
Sustainable Urban Transport Planning General Presentation.
Move Together Share it with us ! Move Together Day Conference Brussels, Monday 7 December 2009 European Economic and Social Committee Carlo Sessa – ISIS.
15th of December 2012 IEE/09/702/SI , Project duration from 1/07/2010 to 31/10/2012 Expert-system for an INtelligent Supply of Thermal Energy in.
Contract Number: IEE/11/885/SI PInE Project Duration: from to – Date of creation: PI N E P ROMOTING I NDUSTRIAL.
MUSEC-EIE/06/024/SI SUPPORTED BY Contract number: EIE/06/024/SI Project duration: December 2006 – June 2009 (30 months) MUSEC.
IEE/08/631/SI Duur van het project: 36 maandenAugustus 2009 Teching the next generation to step away from the car
SMARTSET Sustainable MARketdriven Terminal Solutions for Efficient freight Transport Contract Nr: IEE/12/714/SI Duration:
6 th December 2010 Contract N°: IEE/08/696/SI June May 2012 EPOMM-PLUS Partners Learning Urban Sustainability.
Task Force on Innovation in Mobility Taxiworld Istanbul, 05 th February 2016 Monica Giannini Project Manager, IRU Projects ASBL.
SEGmented Marketing for ENergy efficient Transport SEGMENT SEGmented Marketing for ENergy efficient Transport IEE/09/ SEGMENT: 19-Apr-10 to 18-Apr-13.
Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.
CASCADE Cities exchanging on local energy leadership June 2011 – May 2014 Contract number: IEE/10/217/SI Last update: December 2011.
Regions for economic change Fostering competitiveness through innovative technologies, products and healthy communities Institut für Landes- und Stadtentwicklungsforschung.
FROM LOCAL TRIALS TOWARDS A EUROPEAN KNOWLEDGE COMMUNITY
Coordinated action in the aviation sector to control public health threats Slides developed by the AIRSAN Coordinator, Robert Koch Institute, Germany.
Interregional Conference Pécs 19 th of October 2010.
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
Project number: FR01-KA REALISE Realising the potential of the international mobility of staff in higher education.
European Transport Conference Barcelona, Spain - 5 October 2016
ERA-Net Smart Energy Systems
TRAILBLAZER Transport and Innovation Logistics by Local Authorities with a Zest for Efficiency and Realization 1 July 2010 – 31 June 2013 „The sole responsibility.
for sustainable urban mobility Contract Number: IEE/12/698/SI
OTHER IEE PROJECTS Comune di Padova, Settore Ambiente.
CAPITAL its-elearning.eu
Presentation transcript:

Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community

IEE/08/631/SI Project duration: 36 monthsAugust 2009 BAMBINI aims to increase the presence of soft mobility in the lives of small children and to motivate parents to use car-free mobility to achieve internalisation of eco- friendly means of transport from early on. 12 partners in 11 countries will address key actors in 5 application areas to:  Create Toys and Books focussing on soft mobility  Promote BAMBINI content during Prebirth and Early Month  Motivate children/parents from Crèches to use alternative means of transport  Create motivational programmes for children in Kindergartens  Initiate traffic calmed areas and children streets. Main results expected: A improvement of childrens health, reduction of emmissions, energy and cost savings A set of implementation support materials and motivational programms Applications that are transferable throughout Europe Project Summary

IEE/08/631/SI Project duration: 36 monthsAugust 2009  Socialization and Conditioning towards motorised traffic starts early in life  The car industry uses advertising intensely to create an emotional link to their products  The predominant number (66%) of the toys are related to motorized traffic  Children get less and less exercise in daily life due to an increasing use of the car for short trips Background BAMBINI Some basic facts illustrate the rationalisation behind the BAMBINI approach: BAMBINI BAMBINI aims to counteract this by exerting influence on the traffic behaviour of small children and their parents, starting at birth and throughout kindergarten, in a phase of life where the most important behavioural parameters are defined.

IEE/08/631/SI Project duration: 36 monthsAugust 2009 The overall objectives  Motivate industy to produce appropriate toys for children  Communicate issues of alternative transport in antenatal classes  Create specific motivational programmes for child care facilities  Integrate BAMBINI content in training of child educationalists – and create long term effects and benefits  Enable the transformation of streets into traffic calmed areas  Disseminate BAMBINI Know-how and Good Practices  Promotion of a healthier lifestyle, Energy savings, emmissions reduction Objectives and main steps

IEE/08/631/SI Project duration: 36 monthsAugust 2009 Key Deliverables/outcomes/results  A set of innovative toys focussing on sustainable modes of transport  Toolkit „Living and playing streets“  Set of related materials, templates and guidelines for application  Local Know-how transfer  Picture books on soft mobility  Material development for higher education and university sector Expected Results

IEE/08/631/SI Project duration: 36 monthsAugust 2009 BAMBINI Toys

IEE/08/631/SI Project duration: 36 monthsAugust 2009 Intermediate results 3 toys have been developed and distributed in kindergartens in partner countries for testing BAMBINI content has been integrated into 10 antenatal classes BAMBINI courses have been held in 30 Nurseries (number of children and parents reached: 255) BAMBINI courses have been held with kindergarten staff from 57 groups, toys have been distributed and are currently tested 597 professionals have been trained with BAMBINI content so far – 76% of them are satisfied with it Traffic calming measures have been established in 11 streets 351 stakeholders have been reached in workshops, 3060 face-to-face at conferences and almost with written BAMBINI materials

IEE/08/631/SI Project duration: 36 monthsAugust 2009 Project Coordinator: Mr. Karl Reiter Austrian Mobility Research /Forschungsgesellschaft Mobilität Gemeinnützige GmbH, Austria Tel: +43/316/ Project Partners:  Centre for Health and Development Murska Sobota, Slovenia  Mobiel 21, Belgium  DTV Consultans B.V.,The Netherlands  BAJO – Wojciech Bajor, Poland  Agency for Energy and Environment’s Protection Mangagement – Brasov, Rumania  Agency for Engery, Environment and Sustainable Development Salerno, Italy  Energy Agency of Plovdiv (EAP), Bulgaria  City of Munich, Department of Public Order, Germany  REACM – Development Agency of Eastern Thessaloniki, Greece  Regional Agency for Environment and Energy Ile de France, France  Municipality of Hisar, Bulgaria The sole responsibility for the content of this webpage lies with the authors. It does not represent the opinion of the European Communities. The European Commission is not responsible for any use that may be made of the information contained therein.