ENERGY STAR Computer Monitor Test Methodology Craig Hershberg US EPA

Slides:



Advertisements
Similar presentations
1 GEO Implementation Plan Task Team (IPTT) GEOSS 10-Year Implementation Plan Reference Document.
Advertisements

Display Power Management Policies in Practice Stephen P. Tarzia Peter A. Dinda Robert P. Dick Gokhan Memik Presented by: Andrew Hahn.
Module 3 Configuring Hardware on a Computer Running Windows XP Professional.
Computer Case Houses computer components Provides physical, environmental and electrostatic protection Source for the following: wikipedia.org-Personal_computer_hardwarewikipedia.org-Personal_computer_hardware.
CommentaryVideo Hi, my name is Edward Guillergan and I’m one of AMETEK Programmable Power’s Applications Engineers. I’m here to provide an overview of.
…performance audio networks. ABOUT RockNet => RockNet provides ultra low latency and very high audio quality. Genuine Audio Technology  RockNet is a.
Mammography Industry: Review of Proposed Accessibility Standards U.S. Access Board May 8, 2012 Atlanta, Georgia.
Estimating Key Parameters for the Retail Plug-Load Portfolio (RPP) Program: Recommended Methodological Approaches EM&V, Residential Programs, Products.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
CTIA Industry Standards for Estimating Battery Life
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
CFL ENERGY EFFICIENCY LABELLING/ PUBLIC PROCUREMENT Presented at the workshop on “energy efficient procurement” Mumbai, September 20, 2005.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
© 2014 Pearson Education, Inc. This work is protected by United States copyright laws and is provided solely for the use of instructors in teaching their.
Calibration Procedure.  A winch calibration is completed via a linear interpolation between 2 points.  Requires 2 references  Known lower weight 
Radiology Understanding Display Characteristics What You Should Know When Viewing Images from PACS.
Chapter 10 Digital Imaging: Capture. Digital imaging – electronically producing, viewing, or reproducing an image Pixel – a square with a uniform brightness.
1 E NERGY S TAR ® Monitor Industry Meeting April 29, 2002 San Francisco, CA Craig Hershberg US EPA
William Stallings Data and Computer Communications 7th Edition (Selected slides used for lectures at Bina Nusantara University) Data, Signal.
Project Overview APU for Hybrid HMMWV Operation Charge.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
Jamie Unger-Fink John David Eriksen. Outline Intro to LCDs Power Issues Energy Model New Reduction Techniques Results Conclusion.
1 Proposed ENERGY STAR Specifications for Computer Monitors Craig W. Hershberg ENERGY STAR Office Equipment and Consumer Electronics
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 40 – Displays and Resolution.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
CIT In this chapter you will learn how to -  Describe the workings of keyboards  Explain how to connect and use mice and other pointing devices.
1 CCTV SYSTEMS CCTV MONITORS. 2 CCTV SYSTEMS A monitor simply allows remote viewing of cameras in a CCTV system from a control room or other location.
Portfolio Manager—ICBA Members ENERGY STAR  Tools For Benchmarking and Tracking Energy Use.
Introduction Purpose  To introduce Newhaven Display International Inc.’s full color OLED displays Objective  Discuss general overview of OLED technology.
 A monitor or display is an electronic visual display for computers.  The monitor consists of : o the display device o circuitry o enclosure The display.
Monitor. The Basics Often referred to as a monitor when packaged in a separate case, the display is the most-used output device on a computer. The display.
> Natural Gas Composition for NGVs William E. Liss Gas Technology Institute.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Strata IT Training Chapter 3 Common Input/Output Devices.
TOPIC 2: H ARDWARE COMPONENTS FOR INTEGRATIVE MEDIA SYSTEMS 1.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
Output Thomas W. Davis. What is Output? Output it data that has been processed into a useful form Output includes: Monitors Printers Speakers Etc.
PC Maintenance: Preparing for A+ Certification Chapter 16: Monitors.
Overview of Draft 2 (Version 4.0) ENERGY STAR Specification for Computer Monitors Craig Hershberg US EPA
Authentication, Access Control, and Authorization (1 of 2) 0 NPRM Request (for 2017) ONC is requesting comment on two-factor authentication in reference.
Wireless Intelligent Sensor Modules for Home Monitoring and Control Presented by: BUI, Phuong Nhung, 裴芳绒 António M. Silva1, Alexandre Correia1, António.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Other Peripherals Cahpter 9. Video Overview video as a subsystem that consists of the monitor, the electronic circuits that send the monitor instructions,
Active Mode Discussion Chris Calwell Ecos Consulting.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
/1 Standby Power & IEC62301.
Astable Multivibrators ©Paul Godin Created February 2007 Modified March 2015 Oscillator Basics Technician Series.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Power Supply and Programming Devices by Dr. Amin Danial Asham.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
OV Copyright © 2012 Logical Operations, Inc. All rights reserved. Beginning with Image Basics  Manage Image Elements and Formats  Work with Digital.
INPUT AND OUTPUT COMPUTER DEVICES PENGANTAR TEKNOLOGI INFORMASI (A)
Planar® DirectLight™ LED Video Wall System
05/03/2016 RESOLUTION GSC-8/5: Radio Microphones the elaboration of a single specification for radio microphone products that could be used on a global.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 2 Measurement issues Business Statistics and Registers 1.
TITLE: 555 Timer OM INSTITUTE OF TECHNOLOGY Subject: Analog Electronics ( ) Semester: 03 Prepared By:
Electronic Devices and Circuit Theory
Digital Light Sources First introduced in 2001.
555 Timer EEE DEPARTMENT KUMPAVAT HARPAL( )
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
Project guide B. SUBBULAKSHMI M. E Assistant Professor C. A. R
UHD Terminology Analysis & Suggestions
McCrometer Nano Board Test Procedure
LDZ System Charges – Structure Methodology 26 July 2010
SAS-3 Transmitter Training Review
SAS-3 Transmitter Training Review
Introduction- Link with WG E activity CMEP PLENARY MEETING-PRAGUE
UNIT 5 Analog signals.
Presentation transcript:

ENERGY STAR Computer Monitor Test Methodology Craig Hershberg US EPA

2 Objectives of Today’s Presentation Provide an overview of the final test methodology Share key points of discussion during the test methodology development phase, and their resolutions Present and gather industry input on two remaining issues regarding multiple measurements

3 Test Methodology Goals Develop sound procedure for testing computer monitors in On Mode; incorporate existing methodologies for Sleep and Off Design a methodology that is comprehensive and produces repeatable test results Decrease burden on manufacturers by referencing, where applicable, existing and widely used industry standards for testing –VESA –IEC

4 Development Phase Extensive input from stakeholders –Manufacturers, trade associations, European and Japanese stakeholders, TCO Development Various drafts broadly distributed for comment during 9-month development phase Final test methodology ed to stakeholders in February 2003 – minor changes made since then “Development Summary” captures key additions and changes that led to final methodology – ed to stakeholders and available on Web site –Basis for today’s presentation

5 Non-Energy Factors

6 Removed References to Three Non-Energy Factors Three non-energy factors from Draft 1 have been removed from Draft 2 –Defective pixels (no effect on power consumption) –Contrast ratio (VESA Flat Panel Display Measurements (FPDM) Standard 2.0 does not define parameters for measuring contrast ratio) –Warranty (market-specific so hard to implement and police for global products like computer monitors)

7 Retained Two Non-Energy Factors Two non-energy factors originally included in Draft 1 of the specification have been moved to the test methodology –Refresh rate –Luminance (brightness) Ensure all computer monitors are being tested under similar conditions

8 Refresh Rate Different refresh rates given for LCDs and CRTs, to accommodate differences in technologies LCDs: Measured at 60 Hz, unless a different refresh rate is specifically recommended by the manufacturer CRTs: Measured at 75 Hz (long-time norm in North America) –Discussion over use of 75 Hz or 85 Hz, which is consistent with TCO ’99 and general practice in Europe –75 Hz chosen because most appropriate for power measurement purposes, whereas 85 Hz better for ergonomic purposes (reduces flicker, but increases power consumption)

9 Luminance (Brightness) Levels chosen that support the implementation of a performance-based specification –Allow for comparisons of power use between computer monitors when providing the same visual experience for the user CRTs: Measured at minimum of 100 candelas per square meter (cd/m 2 ) LCDs: Measured at minimum of 175 cd/m 2 –Higher than CRTs because 100 candelas per square meter is much easier for LCDs to attain than for CRTs All luminance test patterns borrowed from VESA FPDM Standard 2.0

vs. 175 cd/m 2 for LCDs 125 cd/m 2 : Not selected because it would unfairly advantage models that only have brightness control, or operate in digital mode –Adjusting brightness to get 125 cd/m 2 may lower power consumption by reducing power to backlights, allowing these models to qualify more easily Maximum brightness: Not chosen because it may punish better performing models with a high brightness range, to allow for some degradation over time

11 Dark Room Conditions and Color Controls and Peripherals

12 Dark Room Conditions Suggested by several members of industry for light measurements References current industry norms through VESA FPDM Standard 2.0

13 Color Controls and Peripherals All color controls and peripherals should be placed at factory default settings –No external devices should be connected to any USB hubs/ports –Any built-in peripherals should be set to off, or placed in their minimum power configuration (as adjustable by the user) –Circuit removal or similar actions not under user control may not be undertaken (e.g., removal of built-in speakers)

14 DVI Inputs and Digital Monitors

15 Addressing DVI Inputs and Digital Monitors Added a clarifying statement re: stable power measurements in Off Mode –Test methodology for all three operating modes states that power measurements should be taken once the power readings are stable –Power readings never quite stabilize due to DVI input check cycle –For models with DVI inputs, manufacturers should ignore the DVI input check cycle when measuring power consumption in Off Included information on how to test digital only interface monitors –Monitors with both analog and digital interfaces should be tested in analog interface –See footnote 1

16 Multiple Measurements

17 Data Variability Analysis First round of testing: Requested testing of 5 units at each of 3 different voltage/frequency combinations –100 Volts/50 Hz, 115 Volts/60 Hz, 230 Volts/50 Hz Data analysis: Considered the variability of manufacturers’ test data provided at each of the voltage/frequency combinations Findings: 1) Much greater variation by sample than by voltage; 2) In On Mode, power use was often higher at 115 than 230; and 3) More data points submitted by manufacturers at 115 than other voltages

18 Active Power Variability Among Different Samples Up to 30% variability by sample for some models

19 Active Power Variability Among Different Voltages Less than 4% variability by voltage for majority of models

20 Reduced Number of Measurements per Model Second round of testing: Requested that interested manufacturers only test 3 units at 115 Volts/60 Hz Overall testing reduced from 15 data points per model to 3 data points per model

21 Questions for Industry 1.Does industry agree that testing at only one voltage/frequency combination is sufficient? –And if so, does it make sense to test at 115 Volts/60 Hz, as proposed in Draft 2? –Another option is to test at the voltage/frequency combination of the country where the monitor will be sold –Which option would industry prefer, and why? 2.Are there any manufacturer concerns with requiring three test units per model? –Do manufacturers have any other alternatives that they would like EPA to consider?