RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Status report - Technical aspects RAMSES Project Status report - Technical.

Slides:



Advertisements
Similar presentations
SESAME Radiation Safety and PSS Phase I : Microtron + Booster Morteza Mansouri on behalf of Safety group TAC SESAME TAC 2013 : Morteza Mansouri.
Advertisements

ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
André Augustinus 16 June 2003 DCS Workshop Safety.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
WG-AL3S - Recommendations1 H. Laeger; SAPOCO 9/11/98 Working Group LHC Safety Alarms (AL3S) DSO TIS & FB LHC GLIMOS CONTROLS Civil Engineering Legal Service.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
ARCON/RAMSES: Current Status and Operational Risk D. Forkel-Wirth, G. Segura Milan, D. Perrin, S. Roesler; H. and Hz. Vincke, P. Vojtyla, M. Widorski (DGS,
SCADA and Telemetry Presented By:.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Interaction of ST & TIS in matters of safety Mandate & OrganisationMandate & Organisation InteractionsInteractions Basis for cooperationBasis for cooperation.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
André Augustinus 16 September 2002 Safety issues.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
RAdiation Monitoring System for the Environment and Safety (RAMSES) The RAMSES Team Presented by L. SCIBILE (TS/CSE) and D. PERRIN (SC/RP)
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
ST Workshop 1 April 2003P. Vojtyla - TIS/IE1/10 Interaction of TIS and ST in Environmental Matters P. Vojtyla TIS – Integrated Safety and Environment.
1LHC COOP, Uwe EPTING, CERN, ST/MO LHC - Technical Infrastructure Monitoring Uwe EPTING CERN, ST/MO.
A. Hangan, L. Vacariu, O. Cret, H. Hedesiu Technical University of Cluj-Napoca A Prototype for the Remote Monitoring of Water Parameters.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
EDMS July 2004 LHCb Experiment Area Meeting RAMSES at LHC point 8 LHCb Experiment Area Meeting 21 July 2004 RAMSES at LHC point 8 LHCb Experiment.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
External Data and DIP Oliver Holme 18 th January 2008.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
1 Infrastructure and DCS Presentation of the Infrastructure Controls aspect in the ALICE DCS Based on U ser R equirements D ocument …you should still know.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
I. Bergevoet - Training preparation
CERN Mobile network migration
Installation of an Instrument on a CERN machine
Instrumentation and control
Radiological and Environmental Monitoring System (REMS)
PSS verification and validation
Radiation Detectors for the PSS1 at ESS
Review of hardware commissioning
Presentation transcript:

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Status report - Technical aspects RAMSES Project Status report - Technical aspects Presented by D. Perrin (TIS/RP) on behalf of the RAMSES team (ST/MA, TIS/IE & TIS/RP)

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 The RAMSES will provide LHC, and finally CERN, with an integrated RAdiation Monitoring System for the Environment and Safety covering acquisition, transmission, logging and display for the LHC machine, LHC experiments and experimental areas.The RAMSES will provide LHC, and finally CERN, with an integrated RAdiation Monitoring System for the Environment and Safety covering acquisition, transmission, logging and display for the LHC machine, LHC experiments and experimental areas. TIS will exploit this system to assess radiation risks and to control the release of radioactivity.TIS will exploit this system to assess radiation risks and to control the release of radioactivity. The system will also be incorporated into the accelerator and experiment control rooms.The system will also be incorporated into the accelerator and experiment control rooms. The mandate of the project team covers the system specification, prototyping, tendering, installation and integration of radiation monitors and industrial control equipment for safety systems.The mandate of the project team covers the system specification, prototyping, tendering, installation and integration of radiation monitors and industrial control equipment for safety systems. RAMSES Project Mandate / Scope

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Major functions  Monitoring radiation variables (real-time) Measurement of dose rates during LHC operation around the accelerator, in experimental areas and their annexes, on the surface and in the environment (prompt radiation) Measurement of radioactivity in released gases and fluids (radioactive nuclides) Measurement of induced activity during LHC stop/shutdown  Generation of local radiation alarms and transmission of remote alarms  Generation of interlocks  Long term data storage Measured values Events (radiation alarms, technical alarms, system faults, etc) System configuration

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Major requirements and constraints  LHC design (strong dependency)  Distributed Radiation Monitoring network  Flexible and modular design for easy configuration  Integrated software infrastructure (control rooms and networks)  Operational 24/24 hours a day, 365/365 days per year  Industrial components State-of-the-art radiation monitors and monitoring stations.  International standards for radiation protection instrumentation  Valid for the replacement of the current radiation monitoring system (ARCON)

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Mandate / Scope The radiological safety of the LHC will be ensured by the on- line measurement from about 350 radiations monitors of 15 different types spread over the 8 access points, both surface and underground installations. Radiation monitors The choice and position of the radiation monitors depend on: - Quantities to detect; - LHC Design (strong dependency); - Monte-Carlo simulations; - Extensive professional experience in RP;

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003  Stray radiation monitoring station:  Stray radiation monitoring station: (x 13) Gamma and muons monitor [EPIC]; Neutrons monitor [ERC];  Ventilation monitoring station (Emissions):  Ventilation monitoring station (Emissions): (x 18) Gas monitor [VGM]; Aerosol sampler [VAS];  Water monitoring station (Effluents):  Water monitoring station (Effluents): (x 9) Release water monitor [RWM]; Release water sampler [RWS]; Radiation Monitors Inventory Inventory For the Environment 1/2  Ventilation flow;  Water discharge flow;

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 Radiation Monitors Inventory Inventory For the Environment 2/2  Meteorological data : ( wind speed, wind direction, atmospheric stability class ) : Ultrasound anemometer [USA]; (x 5)  Samples from the environment : Environmental aerosol sampler [EAS]; (x 4)  Conventional parameters in released water  Conventional parameters in released water (x 9) pH; Temperature Conductivity Turbidity Flow rate  Non-ionising radiation fields  Non-ionising radiation fields (x 13) Electromagnetic fields

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 For radiation protection Radiation Monitors Inventory Inventory  LHC accelerator and experimental areas : Area REM-counter monitor [ARC]; (x 17) Area Gamma dose rate monitor [AGM]; (x 2) Area Mixed field radiation monitor [AMF]; (x 10) Tunnel Gamma dose rate monitor [TGM]; (x 15) Tunnel Mixed field radiation monitor [TMF]; (x 7) X rays monitor [XRM]; (x 6) Induced activity monitor [IAM]; (x 151)  Other monitors & equipment : Hand&Foot monitor [HFM]; (x 8) Site Gate monitor [SGM]; (x 5) Tools & material controller [PCM]; (x 18) Alarm radiation display [PAD]; (x 40)

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Installation example at LHC point 5 RAMSES Installation example at LHC point 5

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Installation example at LHC point 5 RAMSES Installation example at LHC point 5

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Installation example at LHC point 5 RAMSES Installation example at LHC point 5

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Installation example at LHC point 5 RAMSES Installation example at LHC point 5

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Installation example at LHC point 5 RAMSES Installation example at LHC point 5

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 ( For surface and underground installations ) Integration in the LHC Project  Reservation of space for radiation monitors (PSIWG, ST/CV) ~ 350 radiations monitors (~ 50 non-RP monitors);  Reservation of space for associated electronics (PSIWG) 24 racks equivalent (30 locations); 24 racks equivalent (30 locations);  Evaluation of cabling needs (ST/EL) ~ 60 km (~30 km for Induced Activity Monitors);  Evaluation of powering needs (ST/EL) < 25kVA;  Network communication (TCP/IP) Requests underway through CEIWG (~200 connections);  Preliminary planning of installation and EVM (~ 100 work units) ; RAMSES Monitoring hardware infrastructure RAMSES

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Integration in the LHC Project RAMSES Induced Activity Monitor [IAM]

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Integration in the LHC Project RAMSES PX15 AMF + PAD PCM ARC

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Fully redundant server Centralises data coming from the stations Stores the data in the database (measured values, alarms, configurations) Surveys the correct operation of the RAMSES (technical alarms) Acts as server for the different HCI of the system (real-time and historic data) Integrates RAMSES into CERN control infrastructure

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project CERN will use Data Exchange Module to integrates RAMSES in the LHC control infrastructure: Transfer radiation alarms to the LHC control room (CAS) Transfer technical alarms to the TCR (CAS) Provide displays for radiation monitoring in the LHC control room Provide displays for monitoring conventional parameters in water releases (for TCR) Sharing measured values with external system (e.g. LHC Experiences…)

RAMSES Project Technical AspectsDPerrin RSOC September 17, Installation and calibration Commissioning Minimum time before LHC 1st beam Production by industry Qualification of Instrumentation Development by industry Procurement procedure Evaluation & Specifications RF test 4 th quarter 10/2001 : Project Launched 7/2002 : Market Survey launched launched 1 st LHC beam Sector test TI8 -> LHC-7 7/2003 : Invitation to Tender 12/2003 : FC -> Contract Adjudication Adjudication LHC Underground cables installation campaigns 17 September 2003 Integration in LHC RAMSESStatusRAMSESStatus

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 Organisation RAMSES Project Product Owner L. Evans DG (for LHC) (Maître d'Ouvrage): W. WeingartenTIS (for other CERN sites) Product Manager P. Proudlock AC (for LHC) (Maître d'Ouvrage Délégué): H. Menzel TIS (for other CERN sites) Project Owner: H. MenzelTIS (Maître d'Oeuvre) Project Leader: L. ScibileST/MA (Maître d'Oeuvre Délégué) Project Engineers ‘Radiation Protection‘ : D. Forkel-WirthTIS/RP ‘Environmental Safety’: P. VojtylaTIS/IE ‘Radiation Monitors’:D. PerrinTIS/RP ‘Software Infrastructure’: G. Segura, R. BartolomeTIS/IE and ST/MA

RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Thank you for your attention ! The project team Luigi Scibile Doris Forkel-Wirth Daniel Perrin Pavol Vojtyla Gustavo Segura Roberto Bartolome