Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando.

Slides:



Advertisements
Similar presentations
We are now working with 2 microscope: 1st Microscope Official setup: MICOS stage NIkON optics and illuminator DALSA camera cad-4 Recently several hardware.
Advertisements

1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
PEANUT Nagoya 2006/12/08 M. Komatsu. Scanning trials Feb : BL039,040,041,050,052,060 –PL1 and 2 scanned with S-UTS prototype. –SFT matching.
Bern 13 Feb 2006 G. Sirri – INFN BO1 Scan back with dry objective G. Sirri for Bologna group Dry objective with correction collar: ZEISS LD Achroplan (code.
G. Sirri – INFN BO1 Test of Lamp with centering filament and mirror  An UPGRADE for the illumination with back mirror-lens and fine centering and focusing.
SUTS data taking and processing K.Morishima. Introduction to Morishima ・ Refresh ・ Development of Plate Changer ・ Development of Dry lens scanning ・ Development.
Slides for the discussion Cosmic ray density. Cosmic ray density. Cosmic ray is  useful for the alignment between plates. Decay search Momentum measurement.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 20/01/2009 MIZUNAMI.
OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
Giovanni De Lellis University of Naples (Italy) An overview of the European Scanning System (ESS) Nucl.Instrum.Meth. A568 (2006) Nucl.Instrum.Meth.
NetScan for BL118 PEANUT Fermilab 22-23/Jan/2007.
Status and activities in Salerno Cristiano Bozza Salerno Emulsion Group Nagoya Dec 2006.
Reconstruction of neutrino interactions in PEANUT in general scanning (unbiased) mode Giovanni De Lellis on behalf of Andrea Russo Naples University.
CS LNGS Current status and perspectives.
Cristiano Bozza – European Emulsion Scanning Group of OPERA– Jan 2008, Nagoya 1 Status and evolution of the European Scanning System  Basic concepts 
Edge Scanning: new plate design for the European Scanning System G. Sirri for Bologna group.
PEANUT Brick Scanning for NETSCAN by S-UTS Kunihiro Morishima F-Lab Nagoya University BL118 Peanut Fermi Lab 2007/01/22-23.
Kouji Narita Nagoya University, Japan CHORUS collaboration Study of charm production in neutrino interactions.
November 24th, 2005OPERA General meeting1 CS facility A. Ariga, M. Kazuyama, S. Hiramatsu Nagoya University Overview Introduction of components.
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
CS Scan report at Nagoya Film samples August run Rock muon events Comic ray events October run Rock muon events 1 event (1 Brick) Cosmic.
Vertex localization in Lyon Emulsion Workshop 7th-9th Dec. 2006, Nagoya Luisa Arrabito – IPN Lyon.
Evaluation of SySal efficiencies for 1  sample Chorus Collaboration Meeting Ishigaki,7-8 April 2003 Emiliano Barbuto, Chiara Sirignano, Salvatore Sorrentino.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 02/04/2009 ANKARA.
CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)
BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec PEANUT meeting.
Wide Field Scanning K. Morishima Nagoya University.
Status of Napoli scanning laboratory OPERA Emulsion Workshop, Nagoya, 7/12/2006 F. Di Capua on behalf of Napoli group.
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
PEANUT exposure summary and brick distribution and Situation of PEANUT analysis Fermilab.
Status report from Swiss labs Ciro Pistillo LHEP Bern University Opera Emulsion Workshop Nagoya December 7 / 9.
Scanning status in Europe Giovanni De Lellis University of Naples.
CS to brick and track follow-up ● Cosmic ray test ● CS scanning ● CS to brick connection ● Track following Napoli Scanning Lab.
Virtual Alignment alignment technique for no CR exposure or very low density case Satoru Takahashi Nagoya Univ.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
The first application of automatic scanning to vertex location T.Toshito (Nagoya Univ.) 7. Mar. 2002
Reconstruction of neutrino interactions in PEANUT G.D.L., Andrea Russo, Luca Scotto Lavina Naples University.
EM shower reconstruction and located neutrino event analysis Ciro Pistillo (Bern LHEP) on behalf of the Swiss OPERA groups.
DONUT Reinhard Schwienhorst DOE review 7/28/1999.
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
LNGS 25 May 2005 G. Sirri – INFN BO1 Test of a dry objective with correction collar Dry objectives having an high numerical aperture give aberration when.
LNGS 4 Jul 2006 INFN BO1 Grain analysis with High-Resolution microscope  An High Resolution microscope was developed in parallel with the ESS and is working.
Jean Favier LAPP CERN Physics and soft meeting 23/04/04 Why Monte-Carlo ? To understand and separate influences of parameters (ex: fog d, distorsions,m.i.p.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Status of European Scanning System (Bari, Bern, Bologna, Lyon, Napoli, Neuchatel, Roma, Salerno) The final fast version is ready and working up to 20 cm.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
G. Sirri - Bologna videoconf /9 Lateral X-rays with ESS  Goal: implementation of the lateral mark finding in the ESS software  test version.
OPERA scanning session, CERN 03/05/06 DB-driven Scan-back with collar Nikon dry obj.
Development of the European Scanning System Progress Report Development of the European Scanning System Cristiano Bozza – European Emulsion Group - LNF,
Gluing machine (scanning at the edge…) G. Sirri for Bologna Group.
New camera -> Async SySal Mikrotron MC1310 camera: Matrox Odyssey framegrabber Use of dry lens CFI LU Plan Epi X50.
OPERA Physics Coordination, CERN, 03/05/2006 Effect of  and  radiation on the on-line emulsion scanning M. Cozzi for the Bologna group.
I.Kreslo / LHEP BERN1 Status of scanning lab in Bern 2 Microscopes are operating Data acquisition/sharing setup Scanning performance: 2x2cm 2.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
Emulsion handling tools for plate changer oil solution N. D’Ambrosio (LNGS Group) LNGS May 2006.
Swiss Scanning lab report A. Ariga for Swiss group.
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Wide Field Scanning K. Morishima Nagoya University.
Characterization of muon beam in T2K with emulsion detectors A. Ariga, T. Ariga, C. Pistillo AEC-LHEP University of Bern 1.
Edge Scanning: new plate design for the European Scanning System
OPERA Stato dell’esperimento Run 2007
Presentation transcript:

Status of the Bologna scanning laboratory G. Sirri for the Bologna Group* Nagoya 7-9 Dec 06 Bologna Group: L. Consiglio (PhD), M. Cozzi, D. Di Ferdinando (PhD), G. Giacomelli, M. Giorgini, G. Mandrioli, L. Patrizii, M. Pozzato (PhD), M. Sioli, G. Sirri + 2 undergrad. students, 3 technicians

2/16 Bologna Emulsion Laboratory MIC 1 MIC 2 MIC 3 MIC 4 Standard ESS setup + DRY objective Correction collar moving setup Standard ESS setup Prototype ESS – High Resolution Zeiss 100x oil objective Vision/Motion Synchronization 2 air-conditioned rooms connected with the computing room (gigabit) Space for 2 automatic exchangers 4 microscopes all driven by the DB batch manager. D043 D041 D044 D042  corridor  ntd

3/16  The microscope is equipped with : ZEISS 100x objective | N.A. 1.3 ZEISS tube lens hosted in a custom tube Stage with higher load capacity [MICOS HPS-170] Legs with air suspension mechanisms to reduce vibrations. Custom CMOS camera (same sensor as mikrotron mc1310)  Motion/Vision synchronization using libACQ (by Bern)  Illumination, horizontal stage, motor controller, frame grabber, workstation are the same as ESS  This microscope is used for manual checks, fog density and grain size measurements and normal scanning. MIC1: High Resolution MIC1: parameters optimization for scanning with both SySal and libACQ acquisition software in progress. R&D for homogeneous immersion (oil condenser N.A 1.4)

4/16 Nikon ELWD PlanFluor DRY objective magnification: 40x (nominal) numerical aperture: 0.60 working distance: 1.8 mm correction range: 0-2 mm A DC motor, drive belt and serial motor controller has been mounted in a Nikon microscope. SySal acq sw modified. Working conditions: two collar positions c.c. 0 for the TOP scanning c.c. 0.3 for the BOTTOM scanning The magnification depends (a bit) on the correction. The focal plane vertical position depends (largely) on the correction position (ΔZ~ 40 µm). MIC4 setup and the dry objective optimization in progress. Another prototype of collar handler is coming. MIC4 : ESS with also NIKON DRY collar correction objective

5/16 MIC2, MIC3 : ESSs ready for the October Run MIC2 and MIC3 ready for the October Run according to the specifications agreed within the scanning working group. How to improve the accuracy and stability of the measurements? f.e. how to deal with scanning in case of high fog emulsion sheet (as in the november cosmic rays test for CS-brick connection)? - Installation and test of new software modules (tracking, … ) - Test of new filters We suggest to take into account also some points, for example: - Motion/Vision synchronization during acquisition - Microtracks on-line rejection using adequate quality evaluators - Use focus data as guess for on-line shrinkage evaluation

6/16 Analyses in progress in Bologna  Peanut analysis: BL044 BL088  Cosmic ray exposure (shielding and handling): brick transportation unit validation internal shielding  CS-brick connection (November c. r. exposure test)  Edge scanning with ESS dedicated talk (10’)

7/16 4 bricks exposed at FNAL: BrickBeam Exposure (days) Cosmic Ray Exposure (h) BL BL BL BL Peanut analysis:

8/16 Rejected all vertices whose tracks were not all downstream the vertex  Found 148 vertices Required that at least one track from the vertex reaches the end of the brick.  43 vertices 9x10 cm 2 on plates 1-4 6x5 cm² on the plates 5-57 General Scan : BL044

9/16 42 vertices are 2-prongs 1 vertex is 5-prongs BL044

10/16 To validate the vertices : Match between SFT predictions and the 2 most downstream plates The analysis is still in progress. t.eTY BL044 : Brick-SFT matching

11/16 90cm² general scan on the first three plates 298 tracks matched with SFT DB-driven ScanBack in progress. BL088 : Brick-SFT matching

12/16 BL044 General Scan of the brick completed (6x5 cm 2 area) SFT-brick connection successful Vertex validation in progress BL088 Scan Back of SFT predictions in progress Peanut summary

13/ As decided at the June PB, 20 boxes have been produced. Now the production has been stopped in order to: 1) validate them from the technical point of view 2) validate them from the scanning point of view 1)They have been used in the Nov test at LNGS (14 bricks exposed at the cosmic ray pit) 2) A special test was performed in October in order to guarantee the CSD-Brick mechanical compatibility (for transport BMS  X ray site) day exposure inside the CR pit (outside the shielding) - exposure interrupted to stress the brick and the box (many opening-closing cycles, shakings etc.) - results: a) unique align pattern: bivariate gaussian with  x ~ y ~30 mrad b) integral number of tracks compatible with a 4.75 day exposure (after correction for efficiency ~ 85%) C. R. exposure: Brick Transportation Unit

14/  The internal shielding is still pending to be validated: Oct run would be useful also for this;  Nevertheless, in the Nov test 14 bricks have been exposed in the cosmic ray pit in different experimental conditions: 10 in the internal shielding 3 outside the internal shielding 1 outside the internal shielding and near the roof (as in the 2003 exposure – where we measured a penetrating component)  We would ask to the institutions involved in the test to provide a measurement of this quantity: basetrack density as a function of the emulsion sheet (after quality cut and inside a 400 mrad cone) C. R. exposure: Internal Shielding

15 CS1 CS2 PL 60 PL 1  z = 300  m  z ≈ 4800  m Found 18 base-tracks compatible with 8 LNGS tracks within 200  m and 0.03*(1+3*|slope|) rad Scanning of plate 60 in Bologna Fog: 15 / 1000  m 3 Many electrons Microtracks / View: ~1600 BaseTracks / View: ~400 BaseTracks / View after quality cut*: ~50 *CHI2< 0.66*PULS-9 CS-brick connection LNGS scanning of CS doublet provided 11 tracks

16 CS-brick connection Search for tracks without taking into account the result of the automatic scanning Found 6 tracks Fine alignment of CS doublet and PL60 Search for the “missing” tracks  found 3 more Final manual check result: 9 tracks found (2 LNGS tracks not found) With the plate 60 located at z = Manual vs automatic scan: only 5 out of 8 tracks found with the automatic system are good Manual Check Warning: it seems that the x-ray beams for marking is somewhat divergent