© ABB AB, Corporate Research - 1 6/1/2015 abb Work Breakdown Structure Creation.

Slides:



Advertisements
Similar presentations
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Advertisements

Project Activity Planning
OPSM 639, C. Akkan1 Overview Planning Models Project planning determines what happens, when and how they happen. Since planning takes time and consumes.
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Systems Analysis and Design 9th Edition
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Project Management Product Breakdown Structures (PBS) and Work Breakdown Structures (WBS)
© ABB AB, Corporate Research - 1 5/19/2015 abb Project Breakdown Structure Creation.
Lecture Network Analysis
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Project Management Session 7
Software project management (intro)
The 9 Things in the PMBOK 19-Nov-08. The PMBOK “Project Management Body of Knowledge” –sum of knowledge within the profession of project management –used.
Work Breakdown Structure Workshop
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Project Management Education
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Human Resources Management Course Objectives The purpose of this course is to learn the Project Management Institute (PMI) processes required to make.
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 PART.
Edward B. Farkas, Managing Director, Project Management Practice
Chapter 4 Defining the Project.
BSBPMG502A Manage Project Scope 5.3 Create Work Breakdown Structure The process of sub dividing project deliverables and project work into smaller, more.
Chapter 5 Project Scope Management
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Planning the project Project Management (lecture).
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
Management & Development of Complex Projects Course Code - 706
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Week 2 Seminar: Project Scope Management
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Resources Performance time Project Planning Phase : Generating Tasks & Identifying Responsibilities 1.
Geog 469 GIS Workshop Project Management.
How to Develop a Winning Project Plan © Edward B. Farkas, CHS, CPM, MIEEE, PMP Managing Director, Project Management Practice ETR Technology Center.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 4 Project Scope Management.
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
LECTURE IV. o Project HRM include the processes that organize, manage and lead the project team. o The project team is comprised of the people with assigned.
Work Breakdown Structure Use and Demo
PLANNING ENGINEERING AND PROJECT MANAGEMENT
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
© Pearson Education Limited 2004 OHT 9.1 Cadle and Yeates: Project Management for Information Systems, 4th edition IS estimating issues Unique projects.
PRJ566 Project Planning & Management Work Breakdown Structure.
PRJ566 Project Planning and Management Project Management Concepts 1.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
P r o j e c t : from INITIATING to CLOSING ( 1 ).
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Slide 1 Critical Success Factor : Project Management Project Management is the process of _______ the development of a system with a specified _____ frame.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SOFTWARE PROJECT MANAGEMENT
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
Bus 1040 Project Management Week 6,. Agenda Housekeeping Marking for the past 6 weeks. WBS Quiz review Decision Matrix Work through the book case we will.
Creating a Work Breakdown Structure with Microsoft Project.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
MENG 446 : Management of Engineering Projects
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Scope Planning.
Plan Schedule Management
WORK BREAKDOWN STRUCTURE
Create a project schedule
Work Breakdown Structure SESW 108: Program Development and Management
HCIS 410 Education for Service-- snaptutorial.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
Basics of Project Planning
Presentation transcript:

© ABB AB, Corporate Research - 1 6/1/2015 abb Work Breakdown Structure Creation

© ABB AB, Corporate Research - 2 abb Project Planning Course Overview Project Planning Overview Facilitating Processes Project Planning Pre-conditions Risk Management Work Breakdown Structure Project Breakdown Structure Estimation Resource Planning Logical Network Plan Budgeting Time Schedule Project Planning Result Product Anatomy Organic Integration Plan Integration Plan

© ABB AB, Corporate Research - 3 abb Purpose Define the scope of work in the project. Identify all included activities and basic data on these, e.g. size and complexity.

© ABB AB, Corporate Research - 4 abb Input & Output INPUT Detailed Requirements Specification Project Breakdown Structure Work Breakdown Structure from previous projects, if available Know-how from experienced personnel OUTPUT Work Breakdown Structure Planning Package Descriptions These are used as input to Estimation.

© ABB AB, Corporate Research - 5 abb Identifying the WBS The Work Breakdown Structure is identified by defining what activities are needed to produce the Work Products, defined in the Project Breakdown Structure, to the required quality.

© ABB AB, Corporate Research - 6 abb Creating a Work Breakdown Structure Start with the Project Breakdown Structure (what to do) Break down all Work Products in the PBS into corresponding activities Define PBS Define WBS Create Time Schedule Calculate Budget Create Organic Integra- tion Plan Estimate Define Product Anatomy Create Logical Network Plan Create Resource Plan Negotiate Resources Review Project Plan Mgmnt Products Req. Spec. Project Plan The Project

© ABB AB, Corporate Research - 7 abb Numbering the Boxes Each box in the WBS should have a unique identification, i.e. a number Project

© ABB AB, Corporate Research - 8 abb Writing Planning Package Descriptions For each lowest level activity write a Planning Package Description containing the following data: Name and unique identification (i.e. number) of the activity Input (what is needed to perform the activity) Output / Work Products A short description of what to do Size (1, 2, 3) (measure in units like lines of code, size of documents etc., not in time required) Complexity (1, 2, 3) Other dependencies

© ABB AB, Corporate Research - 9 abb Summary The Work Breakdown Structure is a tree structure reflecting the activity structure on all levels of the project, and a Planning Package Description for each of the lowest level activities. The Planning Package Descriptions will be used as input to estimation where size, duration and cost elements will be added to each Planning Package.

abb

© ABB AB, Corporate Research - 11 abb Revisions Rev.New Slide (N) Slide (S) DescriptionDate Dept./Init. 04AllUpdate from Version C / Fredrik Ekdahl 04d3p6Clarify Work Package in picture Branger 05ExerciseWBS Exercise divided into 3 sub exercises. Refer to the exercise of the Estimation-presentation / Christer Persson 06p6Work Package border redrawn, / Christer Persson