CTIO Blanco WF Imager Data Acquisition Jon Thaler Fermilab, Dec. 6, 2003.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

ESODAC Study for a new ESO Detector Array Controller.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
March 2003 CHEP Online Monitoring Software Framework in the ATLAS Experiment Serguei Kolos CERN/PNPI On behalf of the ATLAS Trigger/DAQ Online Software.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
1 Requirements, Software Architecture & Design ….
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
Todd Moore for the DES CollaborationPS TalkJune 13 th, DES DHE CRATE SYSTEM MANAGEMENT & CONTROL Todd Moore University of Illinois, at Urbana-Champaign.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Monitoring and Configuration R. Van Berg Electronics.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
A. Homs, BLISS Day Out – 15 Jan 2007 CCD detectors: spying with the Espia D. Fernandez A. Homs M. Perez C. Guilloud M. Papillon V. Rey V. A. Sole.
CMS Upgrade Workshop November Fermilab POWER DISTRIBUTION SYSTEM STUDIES FOR THE CMS TRACKER Fermilab,University of Iowa and University of Mississippi.
ZTF Server Architecture Roger Smith Caltech
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
02/2008 MATRIX VISION GmbH 1 Presentation The intelligent camera and Image processing sensor.
Application Protocol for Veris E30 Panel-board Monitoring System Jaein Jeong UC Berkeley LoCal Workshop Oct 5 th, 2009.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
P. Earle p1 November 16, 2001Electrical SNAP Electrical Design Estimates November 16, 2001 C. Paul Earle Super Nova/Acceleration Probe.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
Status Review Dec. 1, 2003 Mark Hunten MONSOON Project Manager NOAO MI Program.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
CKM Data Source System CKM Electronics Group July 2003.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Image Builder Design Tao Qian UIUC April 10, 2007.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
EPICS Development for the ASKAP Design Enhancements Program ASTRONOMY AND SPACE SCIENCE Craig Haskins 18 th October 2015 EPICS User Meeting – Melbourne.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 NGC controller Leander Mehrgan.
Paolo Ciambrone INFN- LNF ODE ECS ODE ECS Off Detector Electronics for the muon system INFN - LNF Servizio Elettronica Laboratori Frascati A. Balla, M.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Array Trigger for CTA-US MSTs Feb CTA-US Meeting, SLAC Frank Krennrich John Anderson Karen Byrum Gary Drake Frank Krennrich Amanda Weinstein.
DeLiDAQ-2D ─ a new data acquisition system for position-sensitive neutron detectors with delay-line readout F.V. Levchanovskiy, S.M. Murashkevich Frank.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
LHCb Outer Tracker Electronics 40MHz Upgrade
Software for Testing the New Injector BLM Electronics
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
Instrument Control Systems 2014
Mark Hunten NOAO MI Program
Requirements, Software Architecture & Design
University of Illinois, at Urbana-Champaign
Example of DAQ Trigger issues for the SoLID experiment
The MONSOON Generic Pixel Server Software Design
The Generic Pixel Server (GPX) Dictionary
MONSOON Software Design & Status
MONSOON Software Design & Status
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
MONSOON Software Review
Task Manager & Profile Interface
Presentation transcript:

CTIO Blanco WF Imager Data Acquisition Jon Thaler Fermilab, Dec. 6, 2003

MONSOON Pixel Server MSL (MONSOON Supervisory Level Focus on this connection for a moment Nick Buchholz (12/1/03)

Crude specs Assume: 60 2k  4.6k with 2 amps (E2V) 1 MHz pixel digitization and read rate  Read time is 4.6 s per CCD. 2 bytes per pixel  9  10 9 bits per image Exposure time > 600 sec / 10 (0.5 TB/night) (Mohr/Annis) >120 parallel DAQ channels  dead time below 8%. >Time average data rate (DHE  PAN) ~ 1.2 Mbps/chan  ~150 Mbps total. There is a mismatch between CCD readout and DHE  PAN fiber rate requirements. Monsoon architecture issue?

QuantityItemCost (est.) 1Chassis & Backplane$5k 1 setPower Supplies$1.3k 2 + 1MCB$3.9k 1 + 1CBB$8k 8 + 1IR Acquisition$73.8k 2 + 9Transition Cards$1.6k 2 setsSL100 (DHE & PAN)$10k 1PAN PC$3k Total$107k 2MCB CBB88 1CBB Transition55 8IR Acq IR Acq Transition324 1Power supplies (75% eff.)35 Total dissipated177 NEWFIRM Implementation ( Mark Hunten’s presentation at 12/1/03 Monsoon Status review) Naïve Scaling: Cost~ $200k Power~ 300 W 8 channels each

Space on the Telescope NEWFIRM uses a standard 19” crate We will require two, if this is the route we take. We need to worry about space and power.

Software Pixel Acquisition Node (PAN) SW resides in a PC. Detector Head Electronics (DHE) SW can either be implemented in a processor or as firmware (FPGA). Communications is via Systran fiber optics interfaces. PAN SW (at least for NEWFIRM) has been implemented by the Monsoon group. A DHE SW emulator for the PC has been written by Nick Buchholz (partial implementation?). DHE SW is detector dependent, and wil be a major project.

Pixel Acquisition Node (PAN) Layer No knowledge of other PAN-DHE pairs.No knowledge of other PAN-DHE pairs. Provides PPX interface to MSL or users.Provides PPX interface to MSL or users. Provides run-time configuration of PAN/DHE.Provides run-time configuration of PAN/DHE. Provides first level data archiving.Provides first level data archiving. Provides multiple image processing ‘modes’.Provides multiple image processing ‘modes’. Fowler Sampling, coadds, MSR techniques, OT imaging.Fowler Sampling, coadds, MSR techniques, OT imaging. Provides parameter verification/control/help.Provides parameter verification/control/help. Deals with IR/OUV/etc. differences.Deals with IR/OUV/etc. differences. Handles single exposure sequencing.Handles single exposure sequencing. Handles raw data pre-processing.Handles raw data pre-processing. Provides interface to DHE hardware.Provides interface to DHE hardware. Provides DHE sequencer configuration/download.Provides DHE sequencer configuration/download. Provides PAN error monitoring/reporting/recovery.Provides PAN error monitoring/reporting/recovery. Provides support for ‘speed ROI’.Provides support for ‘speed ROI’. Provides support for ‘compression ROI’s’.Provides support for ‘compression ROI’s’.

Detector Head Electronics (DHE) Layer Handles array hardware control. Voltage levels, sequencing, monitoring.Handles array hardware control. Voltage levels, sequencing, monitoring. Handles integration timing.Handles integration timing. Handles detector readout sequencing.Handles detector readout sequencing. Handles digital averaging.Handles digital averaging. Handles shutter control.Handles shutter control. Can handle array temperature control.Can handle array temperature control. Board Self Identification and Version tracking.Board Self Identification and Version tracking. Some of this is DAQ and some is “front end.”

Near Term Plans Buy a pair of Systran PCI cards to study DHE/PAN communications. Fermilab should probably to the same, so we can coordinate. We must define boundaries and allocate responsibilities. Emulator verification. DHE controller specs? Awaits a sensor decision? Are Systran cards overkill? (e.g., they can do broadcast). How can cost be kept down?