CARE steering April 9th 2008 1 NED Status Report Thierry Boutboul (CERN) LPNHE 9 April 2008.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
CARE steering September 17th NED Status Report Thierry Boutboul (CERN) CERN 17 September 2008.
NED Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS Collège de France, Paris 23 February 2004 We now have a logo!
Next European Dipole (NED) Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE Steering Committee Meeting.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Next European Dipole (NED) Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration HHH General Meeting CERN 11.
Innovation with Integrity Klaus Schlenga Washington, March 25, 2015 Bruker response to the FCC specifications.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
CARE08, Dec , G. de Rijk, The NED Conductor Review 1 The NED Conductor Review: Experience gained and outlook for future development Gijs de Rijk.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
NED Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS CARE Steering Committee Meeting LPNHE 11 April 2006.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
Next European Dipole (NED) Overview & Status Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE General Meeting CERN.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Task 6: Short Period Nb 3 Sn Superconducting Helical Undulator Jim Clarke/George Ellwood 28/11/2012.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Stellarator magnet options. Electrical/winding issues Elegant solution for ARIES-AT does not extrapolate well for ARIES-CS –High Temperature Superconductor.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
Stress review - CERN, Review on stress sensitivity Part I R. Flükiger B. Seeber Group of Applied Physics (GAP) University of Geneva 1.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
CARE08, Dec , G. de Rijk, Summary report on NED activities 1 Summary Report on NED Activities Gijs de Rijk (CERN) on behalf of the NED collaboration.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Applied Superconductivity at UNIGE Overview of the activities Départment de Physique de la Matière Condensée & Départment de Physique Appliquée Université.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Conductor Requirements for Magnet Designers DOE- Conductor Development Program Daniel R. Dietderich Superconducting Magnet Program Office of Science ICFA.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
HL-LHC Magnet components and assemblies
FCC Conductor Development at KAT-Korea
Status of the manufacturing process of a Nb3Sn wiggler prototype
Development of Nb3Sn (and Bi-2212) strands in preparation for the FCC
CSP 25th November 2010 Technical agreement number 3: overview
11 T cable development and procurement strategy at CERN
Task 6: Short period helical superconducting undulator
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Q0 magnet, cooling, support ideas
SMC Design overview of the construction and project issues
EuCARD2 WP 10.2 HTS Conductor
CEA Nb3Sn quadrupole magnet : test results and future
Qingjin XU Institute of High Energy Physics (IHEP),
Development of Nb3Sn in Japan
Presentation transcript:

CARE steering April 9th NED Status Report Thierry Boutboul (CERN) LPNHE 9 April 2008

CARE steering April 9th CARE/NED JRA Following the 2003 EU peer review, the scope of the NED program was revised to focus on Nb 3 Sn conductor and insulation development. The NED JRA has been articulated around four Work Packages and one Working Group 1 Management & Communication (M&C), 2 Thermal Studies and Quench Protection (TSQP), 3 Conductor Development (CD), 4 Insulation Development and Implementation (IDI), 5 Magnet Design and Optimization (MDO) Working Group. It involves 7 institutes (8 laboratories) Total budget: ~2 M€; EU grant: 979 k€ (over ~3 years).

CARE steering April 9th NED/TSQP Work Package The Thermal Studies part of the TSQP Work Package was completed with the publication of the final report in December 2007 (CARE-Report NED) (CEA and WUT; Task Leader: B. Baudouy, CEA) The quench computation task was already completed before (INFN-Mi; Task Leader: G. Volpini).

CARE steering April 9th NED- CD Work Package The CD Work Package includes two main Tasks –conductor development two industrial contracts under CERN supervision: Alstom/MSA (F) and EAS/SMI (NL/D); Task Leader: L. Oberli –conductor characterization (CEA, INFN-Ge, INFN-Mi, and TEU; Task Leader: A. den Ouden, TEU) It is the core of the Program and absorbs ~70% of the EU funding. It is complemented by two extensions of scope –FE wire model development to simulate cabling effects (INFN-Ge & CERN; Task Leader: S. Farinon, INFN-Ge), –heat treatment study (CERN; Task Leader: C. Scheuerlein).

CARE steering April 9th NED- CD: Status of the SMI contract EAS/SMI completed the step 2 with the successful cabling trial of a 40- strand Rutherford cable performed at LBNL in summer 2007, for which a critical current degradation of 4-8 % was measured at both CERN and Twente University for extracted strands. EAS/SMI was then awarded the green light to launch the final strand production. Final strand manufacturing (12.7 km of strand) is currently underway under the responsibility of EAS with part of process done at Hanau (EAS) and part at Enschede (SMI). The total strand is fabricated from 4 billets. The first length (~ 3 Km) expected to be completed by end of May 2008 (3 months of delay) The 3 remaining strand amounts expected by summer Part of the final strand (~ 1 length) will be used to produce at CERN a 14-strand cable for Short Model Coil (SMC) program.

CARE steering April 9th NED- CD: Status of the Alstom contract (1) During Step 2, Alstom produced a wire, B1/ This strand included 78 sub-elements and was processed by means of cold drawing only. B1/14508 strand was characterized by workability problems (numerous breakages), like B1/21204 wire (cold drawing as well). The best critical current densities obtained for B1/14508 are ~ 1900 A/mm 2 (1.25 mm) and ~ 2100 A/mm 2 (0.83 mm). Then, to ensure better workability, emphasis put on another process, based on hot extrusion to guarantee a fair cohesion between Nb barrier and copper can. Two final billets assembled with this sub-element material: 1.One billet with 78 sub-elements, like previous strands manufactured (~ 85 µm at nominal Φ) 2.One billet with 246 sub-elements corresponding to ~ 50 µm final sub-element diameter. First billet fulfilling NED specification.

CARE steering April 9th NED- CD: Status of the Alstom contract (2) Drawing of sub-elements and final billets were done by means of a new set of drawing dies, more suitable to Nb 3 Sn process. The final wires were achieved in January Drawing very successful: 1.B1/63468 strand: 246 sub-elements, 1308 m in a lone length!! 2.B1/20124 strand: 78 sub-elements, 826 m m In addition, sub-elements nicely shaped, as shown by the micrograph: B1/63468 cross-section

CARE steering April 9th NED- CD: Status of the Alstom contract (3) Drawing successfully 246 sub-elements very challenging!! As a comparison, the American company OST, after many years of development, is currently drawing kilometric strand lengths of up to 108 sub-elements, corresponding to ~ 80 µm final element diameter at NED strand nominal diameter (1.25 mm). B1/63468 strand: sub-elements - Strand diameter = 1.26 mm - Cu/non-Cu = J c non-Cu (12 T, 4.2 K) ~ 1450 A/mm 2 (Alstom, o C) B1/20124 strand: 78 sub-elements, Φ1.26 mm, Cu/non-Cu = 1.53, J c non-Cu similar to B1/ Other HT schedules tried without big success for time being, max. J c achieved: ~ 1600 A/mm 2. SEM examinations at CERN showed Sn content at stochiometry (~ 25 at. % Sn) but big Nb 3 Sn grains, barrier not fully reacted (more details given in Characterization part).

CARE steering April 9th NED- CD: Status of the Alstom contract (4) HT optimization underway to react more barrier and to try reducing grain size. Relatively low J c partly due to binary Nb 3 Sn compound. Ti or Ta additions (limit grain growth) should enhance J c by ~ 50 %. Indeed solutions using Ta are currently implemented to achieve the Step 2. Alstom seems to be close to success although ~ 6 months are needed to produce strands. The final strand production would be launched in parallel to Step 2 completion and could not be completed by end of It would require a delay of several months. Meeting with Alstom people yesterday afternoon at CERN to discuss NED program completion. They will send to CERN very shortly a letter to express their commitment to finish the final strand production.

CARE steering April 9th NED- CD: Conductor characterization (1) EAS/SMI B215 wire B215 is the successful prototype wire developed by SMI during Step 2. According to its design, the final strand is currently produced. 288 filaments (~ 50 µm), o C: J c ~ 2500 A/mm 2, RRR ~ 80 Heat treatment optimization studies at CERN: general trend is to decrease reaction temperature but increase duration to try to decrease Nb 3 Sn grain size o C: - I c = T and 4.2 K (gain of ~ 100 A vs o C) - J c = 2665 A/mm 2 !!! (gain of ~ 6 % !) - RRR ~ 220 (vs 80 for o C): much better for stability Impact of o C HT schedule on cabling degradation (both I c and RRR) to be checked soon.

CARE steering April 9th NED- CD: Conductor characterization (2) Alstom B1/63468 strand Jc ~ 1440 A/mm 2 for o C (reacted and tested at Alstom) Several other HT schedules tried at CERN: o C, o C, o C and I c measured at CERN At Geneva University, I c measured as function of longitudinal strain (to check stress impact). J c measured at CERN or Geneva never exceeded 1590 A/mm 2 (12 T). SEM/EDS examinations (CERN) showed that the Sn content is nearly stochiometric (~ 25 at. % Sn) and there is no Sn leak into copper (expected from high RRR values).

CARE steering April 9th NED- CD: Conductor characterization (3) SEM examinations (CERN): 1. The barrier not fully reacted 2. Numerous big grains (~ nm) Potential for more J c even for low temperature reaction 620 o C ): bad for J c. B1/63468 micrograph 660 o C)B1/63468 micrograph 645 o C) Currently in CERN oven: o C. The goal: try to completely react the barrier

CARE steering April 9th NED-IDI Work Package (1) The Insulation Development and Implementation Work Package includes two main Tasks –studies on “conventional” insulation systems relying on ceramic or glass fiber tape and vacuum-impregnation by epoxy resin (CCLRC/RAL; Task Leader: S. Canfer) Completed with a final report in March 2007 –studies on “innovative” insulation systems relying on pre- impregnated fiber tapes and eliminating the need for a vacuum impregnation (CEA; Task Leader: F. Rondeaux). Completed with a final report in December 2007 (CARE-Report NED)

CARE steering April 9th Next Step: Short Model Coil SMC Participant funding only (formally outside FP6-CARE-NED ) CCLRC/RAL, CEA and CERN have agreed to manufacture and test a series of LBNL-type Short Model Coils wound from NED-sub-cables so as to investigate –cable and insulation performances in real coil environment, –design limits for transverse and longitudinal loads. Coil design finished, cold mass design being finalized, winding tests with dummy in progress by RAL-CERN team (interactions with LBNL). Waiting for Nb 3 Sn strand from NED. First magnet foreseen to be tested in Sept-Oct at CERN (Courtesy P. Ferracin, LBNL)

CARE steering April 9th Deliverables NED24Final report on Heat Transfer Measurements ReportWP2CEA- WUT doneDec 07 NED30Report on innovative insulationreportWP4CEAdoneDec 07 NED25Final wire productionPrototypeWP3CERNLate 08 NED26Final report on wire characterizationreportWP3CERNLate 08 NED27Final cable productionPrototypeWP3CERNLate 08 NED28Final report on cable performancesreportWP3CERNLate 08

CARE steering April 9th Publications in S. Farinon, T. Boutboul, A. Devred, D. Leroy, L. Oberli,NB3SN wire layout optimization to reduce cabling degradationMT20 2.T. Boutboul, A. den Ouden, A. Devred, P. Fabbricatore4, M. Greco, D. Leroy, L. Oberli, D. Pedrini and G. Volpini,Nb3Sn conductor development and characterization for NEDEUCAS M. Di Michiel, C. Scheuerlein,Phase transformations during the reaction heat treatment of powder-in-tube Nb3Sn superconductorsSupercond. Sci. Technol. 20, (2007) L55- L58 4.C. Scheuerlein, M. Di Michiel, A. Haibel,On the formation of voids in Nb3Sn superconductors", Appl. Phys. Lett., 90, , (2007) 5.Polinski J., Canfer S., Ellwood G., Baudouy B.,Low Temperature Heat Transfer Properties of Conventional Electrical Insulation For The Next European Dipole.CEC- ICMC 2007