Energy Facility Siting Options for Idaho Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Energy Facility Siting Boise,

Slides:



Advertisements
Similar presentations
Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
Advertisements

Federal Energy and Environmental Regulation Agencies and Laws
Developing an Idaho Energy Plan Dr. Ren Orans, Managing Partner Arne Olson, Senior Consultant Energy & Environmental Economics, Inc. (E3) Presented To:
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
1000 El Camino Real Menlo Park, CA Phone Fax An Economic Evaluation of the 2005 IEPR Michael C. Keeley,
RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
Steve Irwin Public Outreach Coordinator. What is the Board’s role? Before any company can build a major utility facility, OPSB assures that it benefits.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Objectives Overview of the Inter Tribal Emergency Response Commission (ITERC) and its programs Overview of grant opportunities and the grant process.
George Godding Director DMC Office of Market Oversight and Investigations Federal Energy Regulatory Commission USEA/USAID Energy Partnership Program Brasilia,
Western States Energy & Environment Symposium October 27, 2009.
Oregon Climate Change Regulatory Activities and Policy Initiatives Bill Drumheller -- Oregon Department of Energy University of Oregon School of Law Climate.
Alabama GIS Executive Council November 17, Alabama GIS Executive Council Governor Bob Riley signs Executive Order No. 38 on November 27 th, 2007.
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
Federal Energy and Environmental Regulation Agencies and Laws
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
Planning for a Vibrant Community. Introduction Planning is a process that involves: –Assessing current conditions; envisioning a desired future; charting.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Generation Options for Idaho’s Energy Plan Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise,
Electricity Reforms in Bangladesh
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Oregon’s Statewide Land Use Planning Program A Framework for Community Decisions Richard Whitman – Director Oregon Department of Land Conservation and.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
[Legislative] [American policy] Passing of the Public Utility Regulatory Policies Act (PURPA) in Introduced competition within the supply sector.
Washington’s Electric Cooperatives Our Energy, Our Future: A Dialogue with America Mobilizing co-op consumers to ask their elected representatives tough.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
The Future of Electric Power In Utah January 12, 2010.
Context, Principles, and Key Questions for Allowance Allocation in the Electricity Sector Joint Workshop of the Public Utilities Commission and Energy.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Regulating Carbon Dioxide Emissions Sam Sadler Taking the Lead: State Innovations to Reduce Greenhouse Gases National Governors Association Washington,
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Integrated Planning & Environmental Affairs Energy Agencies in California.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
3.00 Understand employment, agency, environmental, energy, and intellectual property law environmental and energy law.
Oregon Strategy for Greenhouse Gas Reductions Western Regional Air Partnership Santa Fe, New Mexico David Van’t Hof Governor’s Sustainability Advisor August.
Role of the Commission and Recent Policy Actions Interconnection Workshop Carol Revelt Utah Public Service Commission December 4, 2007.
CALIFORNIA ENERGY COMMISSION California Bioenergy Action Plan Southern California Emerging Waste Technologies Forum Los Angeles, California July 27, 2006.
What do we mean by “Energy?
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
State Perspectives on Coastal and Ocean Management A Review of A Review of Coastal States Organization’s Recommendations to the US Commission on Ocean.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Federal Energy Regulatory Commission Participation In Interstate Legal Processes Federal vs. State Authority August 10, 2005 Brazilia, Brazil.
Generation Subcommittee, Day Two Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise, Idaho.
SAFIR WORKSHOP: MARKET DEVELOPMENT AND REGULATORY PROCESSES Craig Glazer Vice President—Governmental Policy PJM Interconnection, L.L.C. Washington, D.C.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Pipeline Safety in Michigan Jennifer McKay Policy Director Tip of the Mitt Watershed Council City of Boyne City Commission Meeting April 25, 2016.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Commission Chairperson Phil Montgomery Presentation to Alaska Delegation September 5, 2014 Integrating Wisconsin’s Grid: an Energy Policy Perspective Public.
Creating a Market for New Investment in Biomass Renewable Energy Generation Capacity Presented by Steven Jay Mueller President – DG Energy llc
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Department of Energy Energy Agency Reorganization Plan Little Hoover Commission Hearing on Governor Schwarzenegger’s Plan to Establish a Department of.
ABOUT PUBLIC POWER PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public.
Federal Energy and Environmental Regulation Agencies and Laws
SEQRA as a Tool to Review Energy Projects
SUSTAINABLE ENERGY CONFERENCE April 14 – 15, 2009
Presentation transcript:

Energy Facility Siting Options for Idaho Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Energy Facility Siting Boise, Idaho August 21, Sacramento Street, Suite 1700 San Francisco, CA Telephone: (415)

August 10, Goals for Today’s Session Understand the substantive issues that an energy facility siting process must address Understand the substantive issues that an energy facility siting process must address Understand the current process for siting large energy facilities in Idaho and the gaps in that process Understand the current process for siting large energy facilities in Idaho and the gaps in that process Get a good idea of how other states handle energy facility siting Get a good idea of how other states handle energy facility siting See where there is common ground on an appropriate siting process for Idaho See where there is common ground on an appropriate siting process for Idaho

August 10, Roadmap for Developing the Energy Plan Understand where we are today Decide where we want to go tomorrow Figure out the best ways to get there Implement the approved measures Negotiate through legislative process Repeat You are here

August 10, Task of Siting Subcommittee Role of siting subcommittee is to talk about process Role of siting subcommittee is to talk about process What type of process is appropriate for siting large energy facilities in Idaho? What type of process is appropriate for siting large energy facilities in Idaho? Generation facilities (gas, coal, nuclear, renewable) Generation facilities (gas, coal, nuclear, renewable) High-voltage transmission facilities High-voltage transmission facilities Pipelines (crude oil, petroleum products, natural gas) Pipelines (crude oil, petroleum products, natural gas) Role of subcommittee is not to get into specifics of substantive issues Role of subcommittee is not to get into specifics of substantive issues

Draft Policy Objectives

August 10, Policy Objectives 1.Reliability, Stability 2.Low-Cost, Affordability 3.Environment, Conservation 4.Jobs, Economy 5.Flexibility Action Item Policy Statement Action Item Proposed Structure of Plan Findings

August 10, Draft Policy Objectives 1. Ensure a secure, reliable and stable energy system for the citizens and businesses of Idaho 2. Maintain Idaho’s low-cost energy supply and ensure access to affordable energy for all Idahoans 3. Protect Idaho’s public health, safety and natural environment and conserve Idaho’s natural resources 4. Promote sustainable economic growth, job creation and rural economic development through investments in Idaho’s energy infrastructure 5. Provide the means for Idaho’s energy policy to adapt to changing circumstances

Energy Facility Siting Issues

August 10, Substantive Issues in Energy Facility Siting Air emissions permitting Air emissions permitting Water discharge permitting Water discharge permitting Water rights & use of potable water Water rights & use of potable water Health and safety issues Health and safety issues Consistency with zoning/land-use plans Consistency with zoning/land-use plans Site remediation/restoration Site remediation/restoration Need for reliable energy supply Need for reliable energy supply

August 10, What is Unique About Energy Facilities? Energy facilities have a large “footprint”; impacts go beyond single community Energy facilities have a large “footprint”; impacts go beyond single community Energy networks are regional in scope Energy networks are regional in scope Reliable energy supply is seen as indispensable to the functioning of a modern society Reliable energy supply is seen as indispensable to the functioning of a modern society Electricity and natural gas utilities typically have power of eminent domain after obtaining Certificate of Public Convenience and Necessity (CPCN) Electricity and natural gas utilities typically have power of eminent domain after obtaining Certificate of Public Convenience and Necessity (CPCN)

August 10, Why do Most States have State- Level Energy Facility Siting? Energy facilities have environmental impacts that go beyond local areas Energy facilities have environmental impacts that go beyond local areas Air emissions impacts Air emissions impacts Water discharge impacts Water discharge impacts Water Consumption Water Consumption Energy facilities have economic impacts that go beyond local areas Energy facilities have economic impacts that go beyond local areas Energy is a basic necessity Energy is a basic necessity Must come from somewhere Must come from somewhere Energy networks are regional in scope Energy networks are regional in scope

August 10, Why do Most States have State- Level Energy Facility Siting? (2) Single state-level siting process can offer “one-stop shopping” for permits Single state-level siting process can offer “one-stop shopping” for permits State-level process may be more consistent and predictable State-level process may be more consistent and predictable Linear facilities such as transmission lines and pipelines cross multiple jurisdictions Linear facilities such as transmission lines and pipelines cross multiple jurisdictions EPACT 2005 grants siting authority to FERC for “National Interest Electric Transmission Corridors” for states without state-level transmission siting authority EPACT 2005 grants siting authority to FERC for “National Interest Electric Transmission Corridors” for states without state-level transmission siting authority

August 10, Preliminary Map of “ National Interest Electric Transmission Corridors ”

August 10, How Does Energy Facility Siting Work in Idaho Today? No comprehensive state-wide process No comprehensive state-wide process Air emissions & water discharge permits issued by DEQ Air emissions & water discharge permits issued by DEQ Water rights acquired from DEQ -- no process for evaluating alternative economic uses of water Water rights acquired from DEQ -- no process for evaluating alternative economic uses of water IPUC issues Certificate of Public Convenience and Necessity (CPCN) for utility-owned generation & transmission IPUC issues Certificate of Public Convenience and Necessity (CPCN) for utility-owned generation & transmission Local jurisdictions hear issues related to consistency with land-use plans Local jurisdictions hear issues related to consistency with land-use plans

August 10, Gaps in Current Idaho Process Merchant generation facilities Merchant generation facilities No requirement to show need for power No requirement to show need for power Possible mismatch between constituency of decision-makers and people who bear the impacts (both positive and negative) Possible mismatch between constituency of decision-makers and people who bear the impacts (both positive and negative) Generation and transmission facilities developed by municipal utilities and rural cooperatives Generation and transmission facilities developed by municipal utilities and rural cooperatives High-voltage transmission facilities not owned by investor-owned utility High-voltage transmission facilities not owned by investor-owned utility

August 10, Independent or “Merchant” Power Producers Independent power producers (IPPs) first gained a foothold with passage of Public Utility Regulatory Policy Act (PURPA) in 1978 Independent power producers (IPPs) first gained a foothold with passage of Public Utility Regulatory Policy Act (PURPA) in 1978 Momentum accelerated with federal policy favoring wholesale deregulation during the ‘90s Momentum accelerated with federal policy favoring wholesale deregulation during the ‘90s Today, IPPs generate around 35% of U.S. power Today, IPPs generate around 35% of U.S. power IPP can locate in any state on the Western grid and sell power to any other state on the grid IPP can locate in any state on the Western grid and sell power to any other state on the grid

August 10, Utility vs. Merchant Facilities Utility Facilities Developed under state regulation in conjunction with obligation to serve Developed under state regulation in conjunction with obligation to serve PUC reviews prudency and sets returns PUC reviews prudency and sets returns Risks and returns shared among utility shareholders and ratepayers Risks and returns shared among utility shareholders and ratepayers PUC issues CPCN PUC issues CPCN Merchant Facilities No obligations other than those spelled out in contract Physical output is consumed locally, but economic benefits accrue to contractual owner Risks and returns borne by merchant shareholders No CPCN required

August 10, “Nightmare” Energy Facility Siting Scenarios Large, merchant coal facility in rural area Large, merchant coal facility in rural area New, large nuclear power plant New, large nuclear power plant High-voltage transmission facility from Montana coalbeds to Southwest through eastern Idaho High-voltage transmission facility from Montana coalbeds to Southwest through eastern Idaho New petroleum product pipeline proposed to bring gasoline, diesel & jet fuel from refineries in Rockies to markets in the Northwest New petroleum product pipeline proposed to bring gasoline, diesel & jet fuel from refineries in Rockies to markets in the Northwest Question is whether Idaho needs to act now to prepare for these possibilities Question is whether Idaho needs to act now to prepare for these possibilities

Survey of Siting Processes in Other States

August 10, Survey of State Energy Facility Siting Processes States surveyed: States surveyed: Washington Washington Oregon Oregon California California Arizona Arizona Montana Montana Arkansas Arkansas Maine Maine Questions asked: Composition of Siting Body Decision-making authority Facilities over which Siting Body has jurisdiction Decision-making role of local officials Whether the jurisdiction requires a need standard or economic test to protect ratepayers

August 10, Washington Body: Washington Energy Facility Site Evaluation Council (EFSEC) Composition: Chair appointed by governor, five state agency members, one member from each local jurisdiction Decision: Issues permits & site certificate, governor must sign Facilities: Thermal generation greater than 350 MW, smaller wind (voluntary), oil & gas pipelines, transmission Role of locals: Formal decision-making role on Council Need Standard?: Must demonstrate need

August 10, Oregon Body: Oregon Energy Facility Siting Council (EFSC) Composition: Seven citizen members appointed by the governor and confirmed by the Oregon senate Decision: Issues site certificate, directs agencies to issue permits Facilities: Thermal plants greater than 25 MW, non- thermal plants greater than 35 MW, 230+ kV lines more than 10 miles in length Role of locals: Must approve proposed land use Need Standard?: No need standard or economic test

August 10, California Body: California Energy Commission (CEC) Composition: Five citizen members appointed by governor, four must have specific knowledge (economics, environmental, engineering, legal) Decision: Issues permit to construct & operate Facilities: Thermal plants greater than 50 MW and related transmission lines, fuel supply lines, and related facilities Role of locals: No formal decision-making role Need Standard?: No need standard or economic test

August 10, Arizona Body: Arizona Corporation Commission (ACC), Arizona Power Plant and Transmission Line Siting Committee Composition: Five elected members to ACC, two local members of Siting Committee Decision: Recommendation to full Commission to issue Certificate of Environmental Compatibility Facilities: Power plants greater than 100 MW and transmission projects greater than 115 kV Role of locals: Formal membership on Siting Committee Need Standard?: Economic test to protect ratepayers

August 10, Montana Body: Department of Environmental Quality, Board of Environmental Review Composition: Seven members: three public, two government, two professional Decision: DEQ director issues permits, Board of Environmental Review hears appeals Facilities: Transmission > 69 kV or 10 miles, pipelines of certain diameters and lengths, hydro > 50 MW, nuclear and geothermal plans, gas/coal can “opt in” Role of locals: No formal decision-making role Need Standard?: No need standard or economic test

August 10, Arkansas Body: Arkansas Public Service Commission Composition: Three members appointed by Governor Decision: Commission issues CPCN Facilities: Utility-owned facilities only Role of locals: No formal decision-making role Need Standard?: Economic test to protect ratepayers

August 10, Maine Body: Board of Environmental Protection Composition: Eleven volunteer members appointed by Governor and confirmed by Legislature Decision: DEQ director issues permits, Board of Environmental Review hears appeals Facilities: Facilities emitting greater than 50 tons/yr. VOC, 10 tons/yr. of a single Hazardous Air Pollutant, 25 tons/yr. of all Hazardous Air Pollutants combined, 100 tons per year of any other regulated pollutant Role of locals: Does not preempt local role Need Standard?: No need standard or economic test

August 10, Senate Bill 1292 (2006 Session) Body: DEQ Site Review Panel Composition: Three DEQ, one governor-appointed, one member appointed by each city and county within 50 mile radius Decision: make recommendation to DEQ Director within 90 days whether project is consistent with Energy Facility Siting Management Plan, Director makes decision Facilities: Not specified in bill Role of locals: Formal role on Site Review Panel Need Standard?: Not specified in bill