Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
Resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration EUDET Meeting, Oct. 6 th 2008.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Silicon microstrip sensor R&D for the ILC Experiments
Trigger A front end chip for SLHC CMS strip tracker IN2P3 microelectronic Summer School Frejus, June 2011  Concept of Silicon strip Pt-module.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
1 UA9 September 2010 test beam Si telescope hardware status Mark Raymond – 3/9/10.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
11 Wish list for July May testbeam Keep It (Stupidly) Simple..
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
News on GEM Readout with the SRS, DATE & AMORE
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
Florida Institute of Technology, Melbourne, FL
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Kevin Nash MaPSA-Light test system 1. The System 2.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
7. Feb 2012 Thomas Bergauer (HEPHY Vienna) WP9.4 Status AIDA WP9.4 meeting.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
SVD FADC SVD-PXD Göttingen, 25 September 2012
EUTelescope Testbeam Analysis: Summer 2014
Markus Friedl (HEPHY Vienna)
JEDI polarimetry – Developments at SMART|EDM_Lab
First Testbeam results
Bonn Test Station data analysis with PandaRoot
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Integration and alignment of ATLAS SCT
CMS Preshower: Startup procedures: Reconstruction & calibration
Roberto Chierici - CERN
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
AIDA Alignment Package
Large CMS GEM with APV & SRS electronics
Test Beam Measurements october – november, 2016
BESIII EMC electronics
Electronics and DAQ for the GEM Detector
Setup for testing LHCb Inner Tracker Modules
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May 2008

Aim of the effort The goal of this testbeam: Evaluate the best strip geometry of silicon strip sensors with 50 micron pitch to achieve the highest possible spatial resolution For this purpose we are using a dedicated mini sensor with different zones, each with a different strip geometry: –Different strip widths –0, 1 or 2 intermediate strips We are using the fine resolution of the EUDET pixel telescope to get high precision tracks to determine the residuals for our DUTs [Devices under Test]

3 DUT Sensors Last sensor order at HPK from SiLC collaboration contains a multi-geometry mini sensor: 256 strips with 50um pitch 16 zones with 16 strips each Layout constant within each zone Strip width and number of intermediate strips vary between the zones TESTAC:

DUT Sensors DUT sensors have been intensively tested in Vienna, e.g.: IV curves on all sensors CV curves to determine full depletion voltages –approx. 60V Measurement of the interstrip capacitance reveal different values for each zone: –Capacitance scales linearly with strip width –Different offset for region with one or two intermediate strips

DUT Module Front side: Back side: 9 modules have been built in Vienna:

8 Modules screwed together beam

Arrangement on Telescope Stack of 8 DUT modules are mounted onto XYZ-stage of telescope by the help of a small adapter table: DUTs Since motorized stage allows also rotations of the DUT we will rotate one of the modules within the beam

Front End Hybrid with APV25

DAQ for the APV25 chip Frontend (FE) Hybrids are connected to Repeater Boards (REBO) HV is coming from Keithley Source-meter via small board directly to FE (not shown) Two 9U VME Boards with FADCs are reading data and digitalize them NECO Board is the controller and distributes clock and trigger (via SVD3_Buffer board) PC running CVI (LabWindows) is used for online monitoring and to store data NECO board has LVDS I/O to directly read trigger and timestamp data from TLU box (Thanks to David Cussins for providing a TLU box for testing this feature already weeks ago)

DAQ Hardware and Software DAQ Hard- and Software (including predecessors) has already been used for more than 10 testbeams in the past. Thus, everything is pretty stable.

Timing Trigger is distributed from TLU box to telescope and our setup Clock (40MHz) is generated locally by NECO Latency can be adjusted by both NECO and APV chips APV25 chip has 50ns shaping time and analog pipeline of 192 cells (corresponds to approx. 4us delay) Additional delays introduced by cables DAQ online monitoring allows easy live adjustment of timing

Data Analysis Offline data analysis of DUT data: –Pedestal subtraction –Common mode correction –Hit finding, Clustering –Peak time reconstruction –Track Reconstruction (non existing) We have three possibilities for tracking: –Use EUDET software as proposed by Ingrid Need to transfer our data into LCIO format –Use SiLC (Prague group) analysis software written in ROOT Transfer data from telescope and DUT to ROOT files –Include tracking algorithms in Vienna Analysis code Transfer data from telescope into proprietary ROOT files } Existing software

Summary We will test the spatial resolution of a mini sensor with different geometric zones using the EUDET telescope as reference The testbeam starts next week (May 30 th ) We feel well prepared for Data Taking –Everything is ready and source tests have been performed on the lab test bench in Vienna (successfully) –Will be transferred to CERN beginning of next week –TLU integration has already been successfully tested Offline Analysis: Vienna Analysis code works up to cluster finding and zero suppression Different options for Track Reconstruction –We have a diploma student in Vienna who will perform this analysis