7-12-2007LHC-MAC1 LHC Controls Infrastructure and the timing system Hermann Schmickler on behalf of the CERN Accelerator and Beams Controls Group.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Selected Subjects on Controls System - Quality Assurance P.Charrue On behalf of the AB Controls Group LHC Machine Advisory Committee 16 June 2006.
Control Status Readiness Report
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Pierre Charrue – BE/CO.  Preamble  The LHC Controls Infrastructure  External Dependencies  Redundancies  Control Room Power Loss  Conclusion 6 March.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Stephane Deghaye (AB/CO) ATC/ABOC days.
FAIR Accelerator Controls Strategy
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Logging Mike Lamont Georges Henry Hemlesoet AB/OP Discussions with M. Pace & C. Roderick.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
15 Sep 2007 ICALEPCS'07 - P.Charrue - CERN1 The Status of the LHC Controls System Shortly Before Injection of Beam Pierre Charrue on behalf of CERN Accelerator.
The Status of the LHC Controls System Shortly Before Injection of Beam
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Industrial Control Engineering ADE Rapid Application Development Environment.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Introduction to RBAC Wojciech Sliwinski BE/CO for the CMW/RBAC team
R. Denz, A. Gomez Alonso, AT-MEL-PM
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
Review of hardware commissioning
Presentation transcript:

LHC-MAC1 LHC Controls Infrastructure and the timing system Hermann Schmickler on behalf of the CERN Accelerator and Beams Controls Group

LHC-MAC2 Outline LHC controls infrastructure – overviewLHC controls infrastructure – overview Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations, front end computersReadiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations, front end computers Controls SecurityControls Security The timing systemThe timing system Outlook, injector renovation, summaryOutlook, injector renovation, summary

LHC-MAC3 The 3-tier LHC Controls Infrastructure

LHC-MAC4 The Resource Tier VME crates dealing with high performance acquisitions and real-time processingVME crates dealing with high performance acquisitions and real-time processing –e.g. the LHC beam instrumentation and the LHC beam interlock systems use VME front-ends –PC based gateways interfacing systems where a large quantity of identical equipment is controlled through field buses (LHC power converters and LHC Quench Protection System) (LHC power converters and LHC Quench Protection System) –Programmable Logic Controllers (PLCs) driving various sorts of industrials actuators and sensors for systems ( LHC Cryogenics systems or the LHC vacuum system) –Supported FieldBuses for local connections ( Mil1553, WorldFIP, Profibus) ( Mil1553, WorldFIP, Profibus)

LHC-MAC5 The Middle Tier ApplicationApplication servers hosting the software required to operate the LHC beams and running the Supervisory Control and Data Acquisition (SCADA) systems Data servers containing the LHC layout and the controls configuration as well as all the machine settings needed to operate the machine or to diagnose machine behaviors. File servers containing the operational applications Central timing which provides the cycling information of the whole complex of machines involved in the production of the LHC beam and the timestamp reference

LHC-MAC6 The Presentation Tier At the control room level, consoles running the Graphical User Interfaces (GUI) will allow machine operators to control and optimize the LHC beams and to supervise the state of key industrial systems.At the control room level, consoles running the Graphical User Interfaces (GUI) will allow machine operators to control and optimize the LHC beams and to supervise the state of key industrial systems. Software for operations (LSA, generic services, SCADA systems…)Software for operations (LSA, generic services, SCADA systems…) Dedicated fixed displays will also provide real-time summaries of key machine parametersDedicated fixed displays will also provide real-time summaries of key machine parameters Operational consoles specifications : - PCs with 2 Gbyte RAM running either LINUX or WINDOWS - One PC, one keyboard, one mouse, and up to 3 screens - Console capable of running any type of GUI software for LHC (and PS and SPS) such as JAVA, WEB, SCADA or X-MOTIF.Operational consoles specifications : - PCs with 2 Gbyte RAM running either LINUX or WINDOWS - One PC, one keyboard, one mouse, and up to 3 screens - Console capable of running any type of GUI software for LHC (and PS and SPS) such as JAVA, WEB, SCADA or X-MOTIF.

LHC-MAC7 Outline LHC controls infrastructure – overviewLHC controls infrastructure – overview Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC)Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC) Controls SecurityControls Security The timing systemThe timing system Outlook, injector renovation, summaryOutlook, injector renovation, summary

LHC-MAC8 Applications- The LSA core framework

LHC-MAC9 Applications Readiness The core controls software is in place The technology is well established and tested The core controls have been tested and deployed successfully: LEIR SPS transfer lines: TT40, CNGS, TI8, TI2 Hardware Commissioning LHC power converter tests SM18 Generic Services –Systems for Alarms, Software Interlocks, Fixed Displays, SDDS, Logging are already deployed and attained operational state in other machines Operational Applications –Generic Equipment State and Equipment Monitoring in place –Core control applications for Settings Generation and Management, Trims, Machine Sequencer, Beam Steering are operational

LHC-MAC10 Generic utilities example: logging Conclusion : MSE current appears to be ~2.5% low at extraction Reconstruction of beam incident from logged data Reconstruction of beam incident from logged data SPS at 450 GeV (some 10^13 protons) SPS at 450 GeV (some 10^13 protons)

LHC-MAC11 LHC Hardware Commissioning

LHC-MAC12 Industrial Controls have reached a high level of maturity and the systems deployed for HWC in 2007 are presently consolidated. The SCADA applications will be ported to Linux and also front-end software will be ported from LynxOS to Linux. Framework UNICOS: - used by several CERN groups under the guidance of AB-CO - used by AB-CO for –Machine protection (PIC, WIC, QPS, Circuits) –Collimator environment Package A first application using PLC and PVSS has been deployed and qualified during the collimator test. This solution is now deployed in the LHC –Cryogenic controls (next page)

LHC-MAC13 UNICOS Framework

LHC-MAC14 Cryogenic controls –Cryogenic process Plants and Sector The first cool down of sector 7-8 has shown a large dependence of the cryogenics controls on the availability of the technical network. This situation is considered too high in risk, so new hardware is presently installed for running the essential cryogenics control loops locally. The Control system deployed using Siemens PLC and holding the complete control for the sector has also been successfully tested. –Cryogenic instrument expert system The FESA development to interface all the WorldFip sensors and actuators and an expert tool for cryogenics instrumentation engineers (CIET) has been completed and homogenized with the QPS model to ease the maintenance. The new version was deployed successfully in the LHC sector 78. All the software production chain is also handled by automated production tools using data from the LHC instrument DB

LHC-MAC15 LHC sector 7-8 : Successful cooldown The Cryogenics controls system has been fully operational to achieve this first cooldown. The Cryogenics controls system has been fully operational to achieve this first cooldown.

LHC-MAC16

LHC-MAC17

LHC-MAC18 Machine Interlocks Powering Interlock System (PLC based) Beam Interlock System (VME based) Warm Magnet Interlock System (PLC based) for Protecting Supra-Conducting Magnets and Normal Conducting Magnets Fast Magnet Current change Monitor (FMCM) for Protecting the Equipments for Beam Operation + Safe Machine Parameters system (VME based)

LHC-MAC19 Powering Interlock System & Warm Magnets Interlock System In accordance with the LHC co-ordination schedule, the installation and the individual system tests of both systems have been nearly completed: 36 out of 36 are installed and are regularly participating to the different phases of HWC Powering tests 6 out of 8 units are installed and operational for the HWC (the 2 last ones will be installed in Jan.08)   Powering Interlock Controllers: 36 units of PLC based system protecting ~800 LHC electrical circuits Warm magnet Interlock Controllers: 8 units of PLC based system protecting ~150 LHC normal conducting magnets

LHC-MAC20 Beam Interlock System During 2007, the system has been fully validated for operation in the SPS ring and its extraction lines. Ready to be installed in the LHC machine: 19 units are going to deployed in beginning of 2008 ~200 connections with most of the LHC systems With 10 Beam Interlock Controllers managing in total ~120 connections with: BLM, VAC, BPM, Power Converters,… Several weeks for performing the BIS Commissioning (performed in // with HWC)  

LHC-MAC21 FMCM: Fast Magnet Change Current Monitors First units successfully used during the SPS Extraction tests in 2007 ( 10 units already installed on septum magnet and dipole magnets) Fruitful collaboration with DESY (DESY development + CERN adaptation) FMCM trigger  0.1% drop ! time (ms) I (A) 10 ms FMCM <10 3 PC current time (ms) I (A) 500 ms In total, 12 monitors are going to be deployed in the LHC (+ 14 in Transfer Lines), including ALL septa families 1st version of FESA class and Java supervision available since June 2007 Consolidation in progress. 

LHC-MAC22 Post Mortem system overview PM.RH Request handlerHWC sequencer Seq PM.CB PM.PNO PM Event Analyser PM.PIC In place for Hardware Commissioning Crowbar analysis Powering to nominal analysis Powering interlock analysis PM.EB PM Data storage (SDDS) PM Event Builder PM.QPS Quench Protection analysis PM.EA PM converterPM collector LHC equipment Trigger MTF Data collection and pre-processing Data viewing and analysis Result of test Logging DB

LHC-MAC23 Post Mortem readiness Primary data saving reviewed and implemented (data volume, parallel servers, physical location of servers) Minimal set of tools ready for Hardware Commissioning. Sector 4-5 is being commissioned now. Improvements needed in: - Event recognition (Provoked Quench, Training Quench, …). - Well defined GUI for each test step (now some GUI’s are re-used: can confuse). - Test results electronically signed by role (QPS expert, MPP expert, EIC, …), not fully functional yet. Additional Functionality (Eventbuilder) requested Present system only covers the systems relevant for HWC. For beam related PM the following strategy is proposed: - Assure data saving - have generic browsing tool - wait 6 months of beam operation to define specs for analysis programs

LHC-MAC24 Tracking between the three main circuits of sector 78 Courtesy F.Bordry 2ppm post mortem view of PC tracking

LHC-MAC25 Databases Layout databases: - scope extended from ring to injection and dump lines - Racks & electronics largely incorporated - Layout data is now used as foundation for the controls system - Tools and policy for data maintenance still to be effectively put in place, to keep it up-to-date - More data to be captured i.e. layout + assets (e.g. PLCs in AB, AT, TS) Operational Settings: - Data model stabilized; foreseen to cover all accelerators Logging: - Sustained increasing logging requirements for HWC (>10x volume increase per year) - Improved data retrieval tool (TIMBER) in line with end-used needs - Common logging infrastructure for the complete accelerator chain - New database hosting purchased (in place March 2008)

LHC-MAC26 Hardware Installation, front-end computers Basically all controls equipment installed following the LHC installation schedule. Major problems with quality assurance in particular with cabling. 15 man-months! of effort still missing to fix all non-conformities of world-Fip (fieldbus) cabling. OS of PC gateways moved to Linux (from LynxOS) VME still on LynxOS; transition to Linux unclear. Front End Software framework still under development; version 2.10 release in January Front-End Software developed by AB equipment groups. AB-CO supports 3 last FESA releases.

LHC-MAC27 Outline LHC controls infrastructure – overviewLHC controls infrastructure – overview Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC)Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC) Controls SecurityControls Security The timing systemThe timing system Outlook, injector renovation, summaryOutlook, injector renovation, summary

LHC-MAC28 Communications Technical Network (TN) For operational equipment –Formal connection and access restrictions –Limited services available (e.g. no mail server, no external web browsing) –Authorization based on MAC addresses –Network monitored by CERN IT Department General Purpose Network (GPN) –For office, mail, www, development –No formal connection restrictions

LHC-MAC29 Security : Computing and Network Infrastructure for Controls (CNIC) CERN-wide Working group setup in 2004 for the definition of : –CERN wide security policy –CERN wide networking aspects –Operating systems configuration (Windows and Linux) –Services and support Main outcome are :Main outcome are : –Network Security Policy document –Best possible isolation between General Purpose Network (GPN) and Technical Network (TN) –Connection to the TN requires formal authorization –MAC address authentication –Windows and LINUX OS and patches deployment and management centrally managed

LHC-MAC30 In addition to CNIC : RBAC … for accelerator equipment access: Implement a ‘role-based’ access to equipment in the communication infrastructure Depending on WHICH action is made, on WHO is making the action, from WHERE the action-call is issued and WHEN it is executed, the access will be granted or deniedDepending on WHICH action is made, on WHO is making the action, from WHERE the action-call is issued and WHEN it is executed, the access will be granted or denied This will allow for filtering, for control and for traceability on the settings modifications to the equipmentThis will allow for filtering, for control and for traceability on the settings modifications to the equipment Implementation state of RBAC: - A1 = authentication process and A2 = Authorization process developed (based on passing encrypted digital keys) - Database for access roles prepared. - System not deployed, Motivation campaign driven by AB-CO will start in January 2008.Implementation state of RBAC: - A1 = authentication process and A2 = Authorization process developed (based on passing encrypted digital keys) - Database for access roles prepared. - System not deployed, Motivation campaign driven by AB-CO will start in January Still significant loop holes from parallel access to equipment with expert tools. RBAC will NOT protect against sabotage or malicious access!Still significant loop holes from parallel access to equipment with expert tools. RBAC will NOT protect against sabotage or malicious access!

LHC-MAC31 Outline LHC controls infrastructure – overviewLHC controls infrastructure – overview Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC)Readiness report on - generic services (logging, alarms, software interlocks, sequencer…) + LSA core applications - LHC applications (LSA)  talk of Mike Lamont - industrial controls, mainly cryogenics controls - machine protection systems - databases - post mortem system - hardware installations - front end computers (FEC) Controls SecurityControls Security The timing systemThe timing system Outlook, injector renovation, summaryOutlook, injector renovation, summary

LHC-MAC32 Timing System major components LHC central timing generation LHC injector chain central timing Timing distribution networks Timing reception in distributed front ends Transmission of LHC safe machine parameters (SMP)

LHC-MAC33 SMP: Safe Machine Parameters Generation and distribution of critical parameters over the Timing network: - Beam Energy, - Safe Beam Flags, - Stable Beam Flag, - etc… Interfaces with: - kicker systems (BEM) - BCT system - BLM system - Experiments - Beam Interlock Syst. - Only one controller is needed (VME crate with several dedicated boards) - Two SMP variants: one for SPS and one LHC  - First version (with necessary features) will be both ready in May08 - Final version available in 2009

LHC-MAC34 LHC central timing generation The initial requirements are specified in – –This specifies the basic functionality of the LHC central timing and its presentation to the LSA layer. Status: Implemented and functioning OK All safe beam behavior, beam energy and intensities are simulated and waiting for the SMP hardware. –Delivery and final cabling will be completed before the end of January Postmortem and XPOC behavior is implemented but final cabling depends on the SMP module. Triggering LHC injection from SPS extraction is implemented. Timing distribution hardware: OK Timing receivers in FECs: OK

LHC-MAC35 LHC injector chain central timing The behavior of the LHC injector chain during LHC filling is defined in –FILL THE LHC” A USE CASE FOR THE LHC INJECTOR CHAIN. EDMS LHC – –This has been fully integrated into the CBCM, but the complete chain from LSA across the LHC central timing to the CBCM has not been operationally tested. This will not be possible in the dry runs scheduled for December 2007 dry due to missing interlocks conditions in the injectors. –There is still some cabling that will be completed when the SMP hardware arrives.

LHC-MAC36 One page on Resources/Outlook Present level of effort of controls enormous in terms of human resources: - AB-CO is about 80 staff and about 60 temporary collaborators - 60% on LHC, i.e 70 FTE Expect this high level to stay for first year of LHC running Expect significant problems of continuity when temporary resources will leave A major problem of legacy controls in the LHC injection chain persists: - Only few staff in AB-CO left knowledgeable about the injector controls - Continuing demands for modifications from OP or driven by hardware modifications by the equipment groups  Creation of new project in 2007 driven by AB-CO: Renovation of injector chain controls by using LHC technology - SPS mostly done “on the fly” in 2006 and INCA (= Injector Controls Architecture) project for the injectors expected duration: Scope: all 3 tiers Need for high level of Resources will persist until end of INCA project

25/10/ StD AB/CO Technical Committee PSCCSR Results & proposal Deployment View

LHC-MAC38 Technical Summary No major issues with LHC controls Security tools developed, but not deployed. Major parts of the controls system enter the phase of consolidation, performance tuning and upgrades. This is not true for the applications; development is still needed. “By doing it” many specifications are revisited and existing solutions have to be re-engineered We expect another boost of modification requests during LHC beam commissioning For the past 2 years AB-CO has mainly concentrated on providing functionality in due-time. Documentation “is what it is” and the basis for training a first line intervention team (piquet) is not given. Hence the first year of LHC exploitation will be supported by experts on a best effort basis. During 2007 AB-CO has launched a group wide effort to produce a diagnostics and monitoring tool (DIAMON), which will allow operations and CO experts to monitor (1 st priority) and repair (2 nd priority) controls problems from an integrated tool. The first version of this tool is scheduled to be ready in March 2008.