Class 8 Systems Development Asper School of Business - MBA 6150 Management of Information Systems & Technology April-June 2009 Instructor: Bob Travica.

Slides:



Advertisements
Similar presentations
9.613 Using Information Technology Class 5 Systems Development Asper School of Business Using Information Technology Part-Time MBA, December 2001.
Advertisements

BIS310: Week 4 BIS310: Structured Analysis and Design Feasibility Study and Business Requirements Statement -Selecting the Best Alternative Design Strategies.
MIS 2000 Class 20 System Development Process Updated 2014.
Managing Information System Development Projects IS 460 Notes by Thomas Hilton.
Chapter 2 The Analyst as a Project Manager
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
Systems maintenance Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica Updated: November 2009.
Project Estimation Describe project scope, alternatives, feasibility.
Systems Analysis and Design Kendall & Kendall Sixth Edition
Systems maintenance & adoption Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica Updated: November 2013.
Systems Analysis and Design Kendall and Kendall Fifth Edition
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
Making business case for IS Asper School of Business University of Manitoba Systems Analysis & Design Instructor: Bob Travica Updated: September 2014.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Chapter 4 Determining Feasibility and Managing Analysis and Design Activities Systems Analysis and Design Kendall & Kendall Sixth Edition.
Jump to first page 30/06/ Chapter 1 System Development Environment.
Enterprise Resource Planning (ERP) Systems
Information Systems Development : Overview. Information systems development practice Concept and role of a systems development methodology Approaches.
Acquiring Information Systems and Applications
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
Chapter 5 Initiating and Planning Systems Development Projects
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
©2008 Pearson Prentice Hall Project Management Systems Analysis and Design, 7e Kendall & Kendall CH#3.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Managing the development and purchase of information systems (Part 1)
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
Chapter 5 : Initiating and Planning Systems Development Projects.
1 Determining Feasibility and Managing Analysis and Design Activities.
© 2005 by Prentice Hall Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer.
Introduction to Systems Analysis & Design Chapter #1.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution Structured programming Product SW.
4-1 © Prentice Hall, 2007 Chapter 4: Selecting and Planning Projects Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Project Management Methodology Development Stage.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
4-1 © Prentice Hall, 2004 Chapter 4: Project Management and Planning Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S.
9.351 Systems Analysis & DesignPlanning1 Chapter 4: Business and Systems Planning.
Acquiring Information Systems and Applications
Chapter 4: Project Management and Planning Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S. Valacich, Jeffrey A. Hoffer.
Selecting Projects IT Project Management. Project Initiation: Strategic Planning First step in initiating projects: look at the big picture, organization’s.
HO CHI MINH CITY NATIONAL UNIVERSITY HO CHI MINH CITY UNIVERSITY OF TECHNOLOGY SYSTEM ANALYSIS AND DESIGN LECTURER: Nguyen Thanh Tung.
MIS 2000 Class 20 System Development Process Updated 2016.
The Information Systems Development Processes Chapter 9.
Information Systems Development. Outline  Information System  Systems Development Project  Systems Development Life Cycle.
Chapter 11 Project Management.
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
INT211-Information Technology II
Economic Aspects of Information Systems
Enterprise Resource Planning
Systems Analysis and Design Kendall and Kendall Fifth Edition
Project Management Chapter 11.
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Systems Analysis and Design Kendall and Kendall Fifth Edition
Enterprise Resource Planning (ERP) Systems
Systems Analysis and Design Kendall and Kendall Fifth Edition
Chapter 3 Determining Feasibility and Managing Analysis and Design Activities 1.
Presentation transcript:

Class 8 Systems Development Asper School of Business - MBA 6150 Management of Information Systems & Technology April-June 2009 Instructor: Bob Travica Updated May 2009

2 of Management of Information Systems & Technology Outline System development methodologies Feasibility of IS development project Risks of IS development project Management of IS development project Systems’ business value - planning and monitoring Messages for change leader

System Development Methodologies Structured approach (“waterfall model”), system life cycle (SLC) a as a sequence of stages: or Installation or Construction Systems Planning Get system requirements Create system “on paper” Code, assemble software Mount software on test hardware and study performance Install software on production hardware; Train users Business use of system, and upgrading Decide which system to build. Assess expected value, feasibility, risks. (see slide 12) 3 of 12 Note: Arrows mean relationships between SLC and organization.

4 of Management of Information Systems & Technology Rapid Application Development Analysis & Design (a function, a part of user interface) ConstructionInstallation User’s Testing Build system’s functions & user interface quickly, piece by piece Keep revising design (iterate) based on user’s feedback IT changes (components, Object-Oriented tech.), business too  need of speed in SLC

5 of Management of Information Systems & Technology Markus & Tanis: Four-Phase Enterprise Systems Experience Cycle Phases 1.Chartering (Planning) 2. Project (Development, Implementation – configuring of-the- shelf software rather than coding) 3. Shakedown (“Go live” to achieve system’s routine use – process change challenge) ERP Systems Development Cases on Provincial Power Corporation and Dow Corning

6 of Management of Information Systems & Technology IS Project Feasibility (Making Business Case for IS) Economic feasibility (C/B, ROI, Break-Even, Net Present Value… Scoring method often used in selecting alternative projects. mini case on Trucking company) Technical feasibility (capability of building or maintaining system) Organizational feasibility (capability of adopting system) Operational feasibility (capability of maintaining normal operations) Schedule feasibility (meeting deadline for system’s roll out) Political feasibility (capability of implementing system given political setup) Systems are developed via team projects (mini case “A day in life…”)

(Also see Fig. 10-1, p. 368: Leadership, Employees, Project Scope & Urgency)     7 of Management of Information Systems & Technology

8 of Management of Information Systems & Technology IS Project Management Managing expectations (dreams, best of possible alternatives) of users and technologists Managing nuts & bolts of IS development project (the daily grind) – mini case “A day in life….”) : - Project tasks - Time - People (IS staff, others) - Money

9 of Management of Information Systems & Technology Managing Project Tasks

10 of Management of Information Systems & Technology Managing Project Time Critical path method for assessing tasks time and risks: which tasks can/cannot be delayed.

11 of Management of Information Systems & Technology Managing People – IS Project Team Project manager manages/influences: - IS staff (systems analyst, programmer, business analyst, database, network, and content experts) - Others: Burnout problem (e.g.: Netscape - 24/7 work vs. SAS Corp. gate closes at 5 pm) Management of motivation (e.g.: Microsoft – work space, status, money) More Development Project Team Vendor Executive Department Manager End-User Supervisory Management Expert User

12 of Management of Information Systems & Technology Systems’ Business Value - Planning and Monitoring Formal financial and combined methods used for Planning which systems to build Monitoring returns (value) from system Tangible costs easier to estimate than tangible benefits; Cost savings main tangible benefit (Trucking co.) Financial methods: Cost-Benefit Analysis (CBA, basis to other methods) ROI, Break-Even Analysis… Importance of intangible benefits

6150 Management of Information Systems & Technology Messages for Change Leader Reason for change must be in org. problem - not mere technological change Plan system well, assess feasibility thoroughly, and consider alternative development methodologies (if possible) If technical expertise is missing, hire a consultant Have a dedicated system project team For ERP systems, consider alternatives based on the type of organization you are/want to be, and engage in vendor management For ERP systems, be aware of organizational change and the need to teach it Provide resources for appropriate IT training