Product Data Technology Europe 2002 - 11 th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner.

Slides:



Advertisements
Similar presentations
CENTRO RICERCHE FIAT Centro Ricerche Fiat is the sole owner of this document.It cannot be copied or given to third parties without permission. LOGISTICA.
Advertisements

Modern Systems Analyst and as a Project Manager
A BPM Framework for KPI-Driven Performance Management
Program Management Office (PMO) Design
Request Management Mirror-. A random three day sample of Incidents revealed that about 86% of the registered Incidents were legitimate Requests Many other.
PROJECT RISK MANAGEMENT
Welcome to the World of Web-Based ERP Solution
Ensure Vendor/Engineer of Choice Product Quality
HP Quality Center Overview.
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
ITIL: Service Transition
Project Kick-off 14-Jan-09.
0 General information Rate of acceptance 37% Papers from 15 Countries and 5 Geographical Areas –North America 5 –South America 2 –Europe 20 –Asia 2 –Australia.
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
MEM 612 Project Management Chapter 3 Planning the Project.
CSE Information Systems 1 IMS Information Systems 1 Revision.
Introduction to SAP R/3.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Organizational Transformation Strategy Business Products and Services Systems and Applications Technology and Infrastructure Updated Strategic Initiatives.
Managing Projects
Professor Colin Pattinson Head of School Computing, Creative Technologies and Engineering The JISC Heat & Light by Timetable project From Heat & Light.
Click to add text © 2010 IBM Corporation OpenPages Solution Overview Mark Dinning Principal Solutions Consultant.
Human capital management
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Siebel CRM On Demand – MHC Network Express Integrated Solution.
Process-oriented System Automation Executable Process Modeling & Process Automation.
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Fundamentals Project Organization and Integration
Project Human Resource Management
What is Business Analysis Planning & Monitoring?
Enterprise Asset Management
Chapter 8 Architecture Analysis. 8 – Architecture Analysis 8.1 Analysis Techniques 8.2 Quantitative Analysis  Performance Views  Performance.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Industrial Engineering Roles In Industry
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Module 4: Systems Development Chapter 12: (IS) Project Management.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
How to Sell Manufacturing Foundation Presenter. Agenda What is Microsoft Navision Manufacturing Foundation? Naming Positioning Why We Enhanced Our Manufacturing.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Approvals Management with TCA Hierarchy Ajoy A. Devadawson Oracle Corporation - Consulting.
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux.
LECTURE IV. o Project HRM include the processes that organize, manage and lead the project team. o The project team is comprised of the people with assigned.
Know More. Do More. Spend Less. Gloria Hejna Solution Architect Oracle Project Resource Management.
Going beyond business as usual the pci group Integrated Project & Portfolio Management Microsoft Project Server 2003 – ProSight Portfolios Interface Presented.
“DIP Integrated Project Proposal Meeting” Frankfurt, 17th January 2003 Alessandra Bagnato International R&D Area TXT e-Solutions SpA, Milano (Italy)
P r o j e c t : from INITIATING to CLOSING ( 1 ).
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Engineering Economics Lecture 18 Project Management 6 January 2010.
InLoox PM Product Presentation Slide 1 InLoox PM Product Presentation © InLoox, Inc. InLoox PM 8 for Outlook Product Presentation The Project.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Objective ICT : Internet of Services, Software & Virtualisation FLOSSEvo some preliminary ideas.
RIS NÖ Irma Priedl Zilina, Niederösterreich – some geographical & structural data Largest province of Austria 1.55 mill. Inhabitants Area of.
Impacts of implementation of 4PM Vesna Kobal, Arctur d.o.o. Rijeka, april 2014.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
De Rigueur - Adding Process to Your Business Analytics Environment Diane Hatcher, SAS Institute Inc, Cary, NC Falko Schulz, SAS Institute Australia., Brisbane,
Systems Analysis and Design in a Changing World, 4th Edition
TechStambha PMP Certification Training
Planning Phase: Project Control and Deliverables
Software Project Management
Phase 2 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Project Management Chapter 11.
CAD DESK PRIMAVERA PRESENTATION.
Metrics That Work for You
Presentation transcript:

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. COMPETE Common Platform for Extended Enterprise WEB-SITE: BAE SYSTEMS

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. The evolution of Product development Process Organisation Product + Quality - Time - Costs NEW METHODS OF WORK NEW METHODS OF WORK NEW WAY OF COMMUNICATING NEW WAY OF COMMUNICATING

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. CRF Approach to Project Management 3 STEPS Strategic Planning Project Management and Resource scheduling Control and Progress Review Modeling & Simulation of business processes Planning & Scheduling Actuation Control & Progress Review

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. The Objectives: Find an integrated solution to support ”Enterprise Project Management” From Process planning to Integrated Project Management From SKILL planning to Resource Management Towards a total integration among company functions and departments based on a common data model For distributed project management in an extended enterprise environment Modeling & Simulation of business processes Planning & Scheduling Actuation Control & Progress Review CRF Approach to Project Management

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. COMPETE - (COMmon Platform for the Extended enTErprise) An integrated platform for: Human resources Managing Process Managing Product Planning Know-how Integration Modelling, simulation and planning of business processes Acquisition and management of organizational and individual competencies Planning according to available competencies Project management Managing workflow and progress control

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Knowledge Management Process / Project Management Modelling Workflow Simulation Competencies P C o s t Concurrent Engineering Product Data Management Document Management CSCW Enterprise knowledge Management Schema

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Modeling & Simulation Simulation of business of business processes Planning & Scheduling Actuation Control & Progress Review COMPETE PRODUCTS A solution towards Enterprise Project Management From Process to Integrated Project Management From Resource Management to SKILL planning Towards a total integration among company functions and departments based on a common data model For distributed project management in an extended enterprise environment SKILL PLANP-CON HRM - HUMAN RESOURCES MANAGEMENT

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN Modelling  Activity Modelling  Acivities and links description  Attributes (duration, note, description, learning factor, etc.)  Flows (relationships between activities)  Alternatives Modelling: OR nodes and recycles  Skills  Professional Figures description  Competencies profile  Category (role or position)  Activities required effort  quantity  Assignment period

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN: Modelling Environment

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN Simulation: analisys of project alternatives Alternative 1 Alternative 2 Alternative N Time analysis Generation of project GANTT chart Workload profile for resources Infinte capacity scheduling (profile by profile) Costs and Effort calculation Total effort for each generated project alternative Total cost for each activity Resource Cost details (by position and by profile)

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN: Simulation Results

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Project alternative 1 Project alternative 2 Project alternative N SKILLPLAN: Turning the process into a project

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN HR Planning & Scheduling: Resource Assignment  MULTI-PROJECT Environment  Assignment & scheduling of the modelled projects  Optimization in the case of conflicts, overload:  “Best-fit” assignment, based on requested competencies (minimization of the gap between requested profiles and available candidates)  According to the resources availability (knowing that there could be projects already in progress involving the same persons) Resources Assignment (phisical persons) and support for confilcts resolution

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. SKILLPLAN: HR Assignment

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Project scheduling Resource scheduling Time limited Resource Limited The project is ready for the actuation XML interface (WfMC compliant for Work-Flow systems) In the same way (XML interface), it is possible to import Progress data SKILLPLAN HR Planning & Scheduling

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. P-CON: Actuation & Progress Review Control  Interactive environment to involve all process actors  Project Manager  Start\end project  Generates a progress report to visualise the gap between ACTUAL and PLANNED  Can stop activities in progress in case of problems (overspent, output not compiant to what planned, etc.)  Activity Managers  To insert progress data about activities (then approved by the PM). They can send messages to the PM in case of problems (e.g. To suggest to undertake another route, etc.)  Completion percentage  Estimated remaining duration  Team Mambers  They insert the effort spent on activities (then approved by AM & PM)

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. P-CON: Progress Generation

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. P-CON: Progress Control (Actual VS Planned)

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. HRM:l’Albero delle competenze aziendali

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. HRM: La vista organizzativa

COMPETE ARCHITECTURE Modelling Simulation HR Plan/ScheduleProject Mgmt Workflow Mgmt Model & Simulate Plan & Schedule Actuation Control I/F Process Instances Templates Repository Competencies Tree Competencies DB Human Resources Progress Control Workload XML ReportsPD WfMC XML Product Concept

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Key-points of the proposed solution  Not only a project management tool  Innovative approach “Project&People”  Integrated Platform for  Multiproject Planning & Scheduling  Competencies Management  Progress Monitoring & Control  Support for the whole project life-cycle  Cost Optimisation  Quality of decision  Optimised allocation for resources  Modular & flexible system  Features  Technology (e.g. XML imp\exp to ERP)  Product Suite integration  Evolution (e.g. Extended Enterprise)  Maintenance  Investiments in R&D  Consolidated Know-how in competitive scenarios (AUTOMOTIVE) FEATURESBENEFITS

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. The added value  Evaluate the economical and organisational impact of new projects to be undertaken, identifying effort and competency needs, generating alternative scenarios, and highlighting costs and controls levers  Optimise the resource utilisation by means of a competencies based approach, with a workload control to avoid possible bottlenecks  Tuning of the planning process and control thanks to a standard planning tool and knowledge sharing among the different company functions  Fast react to possible unespected problems thanks to the desision support for what-if-analysis and alternatives planning

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. Open Issues  Risk management in the planning phase  Key performance indicators in the control phase  More strict interaction with the design phase  More attention to feedbacks and costs

Product Data Technology Europe th Symposium - Centro Ricerche Fiat, Turin, Italy - 7th - 9th May 2002 Centro Ricerche Fiat is the sole owner of this document. It cannot be copied or given to third parties without permission. References  Automotive  One active project (Fiat)  Dashboard design ( Magneti Marelli)  Aerospace & Defence  One pilot on Wing Design (BAE Systems - Manchester Headquarter)