1Copyright © 2008, Printer Working Group. All rights reserved. PWG Imaging Device Security (IDS) Working Group Lexington, KY – P2600 Meeting October 24,

Slides:



Advertisements
Similar presentations
Printer Working Group Face-to-Face Meeting December 8, 2010
Advertisements

1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Irvine, CA - PWG F2F Meeting April 29,
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Seattle area, WA IDS-Microsoft F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary December 2010 Irvine, CA – PWG Meeting Ira McDonald (High.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
Copyright © 2009, Printer Working Group. All rights reserved. 1 ISTO Printer Working Group Standards in Imaging and Manageability Lee Farrell Chairman.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group October 20, 2010 Lexington, KY PWG F2F.
Copyright © 2010, Printer Working Group. All rights reserved. 1 ISTO Printer Working Group Standards in Imaging and Manageability Lee Farrell Chairman.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December 12, 2007 Austin, TX PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 6, 2012 Redmond, WA PWG F2F Meeting Joe.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2008 Lexington, KY PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 28 April 2009 Mt Laurel, NJ - PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Bagsværd, Denmark- PWG F2F Meeting August.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 4, 2010 Bagsværd, Denmark- PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
1 Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group April 6, 2011 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 19 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Webster, NY- PWG F2F Meeting June 11, 2010.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary and IDS WG TCG Activity Summary August 2010 Bagsvaerd, Denmark – PWG Meeting.
PWG-IDS Differences of the attributes between NEA and NAP protocols By Ron Nevo Sharp June 2008.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group February 3, 2011 Wailea-Makena, HI PWG.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group February 2, 2011 Wailea-Makena, HI PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary 10 June 2010 Rochester, NY – PWG F2F Meeting Ira McDonald.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary May 2011 Webster, NY – PWG Meeting Ira McDonald (High North.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
IETF NEA WG (NEA = Network Endpoint Assessment) Chairs:Steve Hanna, Susan Thomson,
P HDSS 6/2/20151 P2600 Hardcopy Device and System Security October 2008 Working Group Meeting Don Wright Director of Standards Lexmark International.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2011 Austin, TX PWG F2F.
Imaging Status Shivaun Albright Imaging Committee Chair HP.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group Decemberr, 2010 Irvine, CA PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group February, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Copyright © 2009 Trusted Computing Group An Introduction to Federated TNC Josh Howlett, JANET(UK) 11 June, 2009.
PWG Plenary Status Report Semantic Model Working Group
PWG Plenary Status Report MFD Working Group
OpenID Enhanced Authentication Profile (EAP) Working Group
Don Wright Director, Alliances & Standards Lexmark International
OpenID Enhanced Authentication Profile (EAP) Working Group
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Plenary – February 10, 2010 Scottsdale, AZ (Hosted by MWAi)
PWG Plenary Status Imaging Device Security (IDS) Working Group
Don Wright Director of Standards Lexmark International
Don Wright Director of Standards Lexmark International
Printer Working Group Plenary Session
PWG Plenary Status Report MFD Working Group
Don Wright Director of Standards Lexmark International
Proposed Alert Table Extension For Multi-Function Printers
PWG Plenary Status Report Workgroup for Imaging Management Solutions
PWG Plenary Status IPPv2 Working Group
Semantic Model Workgroup Status
PWG Plenary Status Report MFD Working Group
Semantic Model Workgroup
OpenID Enhanced Authentication Profile (EAP) Working Group
OpenID Enhanced Authentication Profile (EAP) Working Group
Semantic Model Workgroup Session
OpenID Enhanced Authentication Profile (EAP) Working Group
Presentation transcript:

1Copyright © 2008, Printer Working Group. All rights reserved. PWG Imaging Device Security (IDS) Working Group Lexington, KY – P2600 Meeting October 24, 2008

2Copyright © 2008, Printer Working Group. All rights reserved. Purpose of the effort The industry is moving beyond basic authentication for access to corporate networks to a fairly detailed assessment of the device that is connecting before being allowed to access the network. Examples of what’s being measured for PC Clients: OS Type, Version, Patch Level Anti-virus Type, Version, Definition Level, Is Active Hardcopy Devices attach to networks, but there’s no standard set of metrics that is used to assess an HCD. Our Goal is to provide these metrics!!!

3Copyright © 2008, Printer Working Group. All rights reserved. Work Items for the WG What We’re Doing Defining a standard set of metrics that might be measured or assessed in Hardcopy Devices to gauge if they should be given access to a network Defining example “bindings” for how these metrics are used in the individual network assessment protocols. What We’re NOT Doing We are NOT defining any new assessment protocols or assessment extensions to existing authentication protocols. We are NOT endorsing any of the competing network assessment protocols (NEA/TNC, NAC, NAP), but plan to enable Hardcopy Devices to participate in any/all of them.

4Copyright © 2008, Printer Working Group. All rights reserved. Working Group Officers IDS WG Chairs: Peter Cybuck (Sharp), Ron Bergman (Ricoh) IDS WG Secretary: Lee Farrell (Canon) IDS WG Document Editors: Jerry Thrasher (Lexmark), Ron Nevo (Sharp) Brian Smithson

5Copyright © 2008, Printer Working Group. All rights reserved. Status Reviewed Network Assessment Protocols Cisco NAC (Network Access Control) TCG TNC (Trusted Network Connect) Microsoft NAP (Network Access Protection) IETF NEA (Network Endpoint Assessment) NAP has been targeted to be the first candidate Well documented (public documents) Supported in MS O/S versions Current effort is to Complete Assessment Attribute Specification. Complete the binding to NAP for HCD Attributes. Define the required NAP protocol stack support. Next Step Start an HCD to NEA binding document

6Copyright © 2008, Printer Working Group. All rights reserved. Schedule Q1 2008: Initial education and Study Specify Network Assessment Protocols COMPLETE Develop (Use Cases) and Requirements COMPLETE Q2 2008: Draft Proposals Required Minimal Attribute Set COMPLETE Extended Attribute Set COMPLETE Q3 2008: HCD Health Assessment Attributes Spec IN REVIEW NAP Binding Spec Proposal IN REVIEW Q4 2008: Complete HCD Attributes Spec Finalize NAP Binding Spec Start NEA Binding Spec

7Copyright © 2008, Printer Working Group. All rights reserved. Current Documentation HCD Health Assessment Attributes Spec ftp://ftp.pwg.org/pub/pwg/ids/wd/wd-idsattributes pdf (.doc)ftp://ftp.pwg.org/pub/pwg/ids/wd/wd-idsattributes pdf HCD Health Assessment NAP Binding Spec ftp://ftp.pwg.org/pub/pwg/ids/wd/wd-ids-napsoh pdf (.doc)ftp://ftp.pwg.org/pub/pwg/ids/wd/wd-ids-napsoh pdf Microsoft NP Protocols ftp://ftp.pwg.org/pub/pwg/ids/white/Microsoft%20NAP%20Protocols.pdf (.ppt)ftp://ftp.pwg.org/pub/pwg/ids/white/Microsoft%20NAP%20Protocols.pdf

8Copyright © 2008, Printer Working Group. All rights reserved. General Teleconferences are held bi-weekly at 1 pm EDT The teleconference schedule: November 6 November 20 December 3-5 (Face to Face meeting) Contact Information distribution list To subscribe to the IDS mail list see: