Fixed press-container, where to the fixed installed press join interchangeable container with volume 30 cubic meters Forcing compaction 1:5/7 (for dry waste)
Waste transportation using press-compactors
Waste transportation using bulk-refuse containers, volume 8-35 cubic meters For gathering and transportation oversized, building and industrial wastes large-sized containers in volume 8, 12, 15, 20, 25, 30, 35 m cubic which are established in territory of the client are used. It allows to use more rationally territory and to optimise transport costs at export of a waste.
Special motor transport and containers park for separate collection and waste transportation For introduction of separate gathering of a waste special containers in volume from 1, 1 to 3,5 m cubic, established on container platforms with a coloring by kinds of a waste are used
Mobile waste sorting and crushed complexes The collected waste is sorted on mobile sorting complexes where are selected paper for recycling, polymers, metals, glass, and also combustible fractions which can be used as alternative fuel. The rests of the sorted waste (not utilised) dumps on landfill
. The scheme of technological equipment producing electric and heat energy from biomass and sorted waste (alternative fuel), developed by “Ukrspetstechnologii” Corporation
Ash content, formed in the process of burning of alternative fuel Rest in ash Actually EPA Barium 100 mg/l 0.37 mg/l Cadmium 1 mg/l 0.10 mg/l Plumbum 5 mg/l 0.58 mg/l Arsenic 5 mg/l 0.05 mg/l Selenium 1 mg/l 0.05 mg/l Chrome 5 mg/l 0.01 mg/l 4-methyl penthanol 7 mg/l 2.0 mg/l Benzol 0.5 mg/l 0.1 mg/l Benzol. N/A 170.0 mg/l Octan Phitalat N/A 4 mg/l
Levels of emissions in smoke gases at burning of alternative fuel Emission Norm Actually Macron 0.080 g 0.051g CO (carbon monoxide) 50 ‰ 1 ‰ SO2 (sulfur dioxide) 150 ‰ 24 ‰ HCI (hydrogen chloride) 50 ‰ 6 ‰ NOX (nitrogen oxides) 200 ‰ 68 ‰
Necessary infrastructure for perfection of system of the waste management, building and operation of the power generating enterprise The ground area (25 hectares) for placing of the transport-industrial complex of power generating enterprises and landfill for dumping of solid domestic waste. Transport and engineering communications: presence of roads with a firm covering, systems of water supply and a drainage system, electric mains
. We are ready to any kind of mutually advantageous cooperation – as in the field of technological decisions and questions of financing and operation of the given project