WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.

Slides:



Advertisements
Similar presentations
School Management Tracking Solutions
Advertisements

SeaDataNet Services monitoring Angelos Lykiardopoulos SeaDataNet-2 Training Course July 2012, Oostende, Belgium.
Mobile Application Architectures
D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
ORG. ENTITY GSM WIFI VIRTUAL SERVICE NETWORK. Support for wired and wireless networked workstations Wireless PDAs Integrated GPS VoIP Integrated Video.
Location Based Service Aloizio P. Silva Researcher at Federal University Of Minas Gerais, Brazil Copyright © 2003 Aloizio Silva, All rights reserved. School.
Introduction of FUTÁR System. Basic data of FUTÁR System Devices to be installed The investment cost of project: EUR Vehicle consolidated with.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
1 © Aberdeen Group 2013 – Not For Distribution ™ Meeting the Rising Challenge of Modern Networks.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
WP5 - Estimated Time of Arrival: verification of the F-Man approach and identification of effects on fleet management Athens -Greece Sept 2004 National.
 To publish information for global distribution, one needs a universally understood language, a kind of publishing mother tongue that all computers may.
Sampling distributions. Example Take random sample of 1 hour periods in an ER. Ask “how many patients arrived in that one hour period ?” Calculate statistic,
8.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
National Technical University of Athens An approach to Optimization and Business rules context Contents 1.Optimization: Fundamental principles (maritime.
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
WP5 - Estimated Time of Arrival: verification of the F-Man approach and identification of effects on fleet management Athens -Greece Sept 2004 National.
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
Introduction to Management Information Systems Chapter 5 Data Communications and Internet Technology HTM 304 Fall 07.
PERTEMUAN 7 Copyright © 2002 Pearson Education, Inc.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Copyright © 2002 Pearson Education, Inc.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
WP4- Integration Kranjka Gora - Slovenia April 2004 National Technical University of Athens.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Make your messaging reliable use it Messaging. A single and global solution Send, receive and process any type of message through the appropriate channel.
Evolved from ARPANET (Advanced Research Projects Agency of the U.S. Department of Defense) Was the first operational packet-switching network Began.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
1 On Board Terminal  Technical characteristics  Functions  Messages  SIM requirements  Sensors for OBT  Installation.
Lesson 2 — The Internet and the World Wide Web
Technology and Society The DynamIT project Dynamic information services and anonymous travel time registration VIKING Workshop København Per J.
WP 6.3 Integration of Adriatic port with hinterland and improved services WP test of new ICT solutions and pilot interventions in ports by adopting.
TRANSFORMING IT.  The cloud is a group of servers.  A user interacts with the cloud without worrying about how it is implemented. Cloud computing describes.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
BY  INTRODUCTION  NEED FOR MOBILE TRACKING  EXISTING TECHNOLOGIES & CONSTRAINTS  LOCATION TRACKING CURVE METHOD  CONCLUSION.
Summary - Part 1 - Objectives The purpose of this basic IP technology training is to explain video over an IP network. This training describes how video.
2005 Manufacturers’ Survey For Pinellas County Business Profile Business Location Because of rounding, details may not add up to 100% (#) Percent Change.
Introduction and Overview Chapter 1. Why Study TCP/IP? Forms global Internet base technology Has accommodated explosive growth well Protocols work over.
UIC ERTMS World Conference
Estimating Bandwidth of Mobile Users Sept 2003 Rohit Kapoor CSD, UCLA.
(EE429) First day Course Materials Assistant Prof. Dr. Anwar Hassan Selected Topics Communications.
Gasoline stations benefit from the gasngo™ network Gasngo™ gives excellent business opportunity for gasoline stations in Mexico.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
1TAP Masterplanning kick-off25 September 2012 TAP TSI Masterplanning Overview of RU/IM obligations Masterplanning Kick-off Brussels, 25 September 2012.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Advanced Network Architecture Research Group 2001/11/74 th Asia-Pacific Symposium on Information and Telecommunication Technologies Design and Implementation.
CoRiNav Coastal River and Port Navigation A Research Proposal to meet DG Transport Task 2.3.1/12.
Here we are 3rd review meeting Cartif-Brussels 17/12/2014.
Computer networks Internet, Intranet, Extranet, Lan, Wan, characteristics and differences.
KAIS T On the problem of placing Mobility Anchor Points in Wireless Mesh Networks Lei Wu & Bjorn Lanfeldt, Wireless Mesh Community Networks Workshop, 2006.
Topic 5 Initiating a project
1 Computer Engineering Department Islamic University of Gaza ECOM 6303: Advanced Computer Networks (Graduate Course) Spr Prof. Mohammad A. Mikki.
Internet Essentials. The History of the Internet The Internet started when the Advanced Research Projects Agency (ARPA) of the United States Defense Department.
MiddleMan: A Video Caching Proxy Server NOSSDAV 2000 Brian Smith Department of Computer Science Cornell University Ithaca, NY Soam Acharya Inktomi Corporation.
 Understand the concept and scope of IT Infrastructure  Understand with various components and technologies that make up IT Infrastructure  Learn the.
F-MAN Kranjska Gora, 19th - 20th April RIV CHANGES Most probably that with 1st of January 2005 the “old” RIV expires.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
A significant Term to ensure flawless performance Mobile App Maintenance.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
Urban Mobility Management and Emissions Measurement System Boile Maria 1,2 Afroditi Anagnostopoulou 1 Evangelia Papargyri 1 1 Centre for Research and Technology.
Parcel Tracking Solution Parcel Tracking What to look for Architecture
EA C451 Vishal Gupta.
Sampling Distribution of the Sample Mean
Application Layer Mobility Management Scheme for Wireless Internet
IEEE 802 Scope of OmniRAN Abstract
Presentation transcript:

WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens

WP3- Development: Milestone M3 FACT: The global architecture of F-MAN has been very well described in the Technical Annex of the project where the three modules of the system where described. The Tracking System module The Data Processing module The Asset Management module National Technical University of Athens

WP3- Development: Credits This is due to the effective work of Eckhard Kuhla and Valerio Recagno, who both put a significant effort for the preparation of the Technical Annex of the of this project. National Technical University of Athens

= WP3- Development: Overall view National Technical University of Athens The research work that followed, investigated several aspects, problems and dilemmas of the architecture. It has made a big round and ended-up at the start-up point. This presentation gives a brief description of the above research work.

= WP3- Development: Research trends National Technical University of Athens Investigate advanced decision support management solutions Follow the functional requirements Finito palabra Track-and-trace is OK Riv 2000 Don’t do ….

= WP3- Development: Interim work (1) National Technical University of Athens ……………………………

= WP3- Development: Interim work (2) National Technical University of Athens …………………………… RESULT: Partly success !!!!!!!!!!!

= WP3- Development: Achievements National Technical University of Athens The completeness of the initial approach was confirmed Certain elements were developed functional requirements User management part of DPM ETA Transport order structure of AMM Several major aspects are still not finalised (Optimisation, Business Rules)

Dilemma #1: Clever OBT or dummy OBT ? National Technical University of Athens

Dilemma #1 Solution: Select an OBT “from the shelf” antenna

Dilemma #2: One central Ground Station VS spatial distributed locations National Technical University of Athens One central ground applications config. Self reliant local ground applications config. Master-slave ground applications config

Dilemma #2 Solution : One central Ground Station National Technical University of Athens One central ground applications config. Country A Country B Country C International provider OBT National provider International provider Roaming Users’ premisesUsers’ premises Users’ premises Internet connection Internet connection Internet connection Roaming Central Ground Applications OBT Self reliant local ground applications config. Country A Country B Country C OBT Fleet Manager Internet connection Leased lines Local Ground Applications OBT Local Ground Applications Leased lines Central Ground Applications National provider National provider Fleet Manager Fleet Manager National Provider Master-slave ground applications config

Dilemma #3: System architecture F-MAN version VS Pinto’s/ RIV 2000 oriented version

Dilemma #3 Solution : Only F-MAN Version exists !!!! F-MAN Version Pinto/ RIV 2000 oriented version timeWorking meeting in Bled

Problem : High SMS communication traffic National Technical University of Athens OBT to OBT communication SMS management through timetable information (timetable- mode) Linking of track and trace information coming from many OBTs from the same train

F-MAN: Developed elements Operational Managers and other authorised actors Tracking system module Estimated Time of Arrival (ETA) calculations wagon offers & wagon requirements wagon track and trace information Operational Managers, Infrastructure managers & Station managers Asset Management module Decision Support System Technical and operational availability per wagon type Internet link Wagon Maintenance Managers Fleet Managers asking for wagons Wagon Leasing Companies Fleet Managers offering wagons to the pool Data processing module

ETA Functionality / ETA Indicators Most common value = average value R Probability e1e1 Arrival time 1.The average value2.The most frequent value Arrival time R Probability e2e2 R/2 Most common value Average value e2e2 e1e1 Probability Arrival time E3E3 3.The 100%, 99%, 90% indicators 100% e8e8 e 10 90% 10% e9e9 99% 95% e 11 F 11 F 10 3 hours H= 4 hours ETA provided based on 90% indicator= = 3 hours with 10% non-shown probability Probability required by Mr. Bean 1% 9% Order 1 (delayed) Time margin between consecutive orders using the same wagon Order 2 H=4 hours Tim

Cumulative distribution method (Proposed ETA Method) Probability of Non-shown= 100-P Cumulative probability (%) 0% 100% P Hours H Time Order 1 (delayed) Time margin between consecutive orders using the same wagon Order 2 H=4 hours 22/5/2003 Actual position at +8:00 H 2 =3.6 h H 1 =2.2 h Cumulative probability that the wagon will arrive at the destination terminal at the required time 83% 17% Probability of non-shown for Fleet Manager B 42 % Probability of non-shown for Fleet Manager A 58% A C D +2:00 +8:00 +16:00 +36:00 E +22:00 (Xa, Ya) (Xb, Yb) (Xc, Yc) (Xd, Yd) (Xe, Ye) (Xact,Yact) 450km B Cumulative probability for station B Time Fleet Manager A requires his wagon within 2,2 hours. Order 1 (delayed) H 1 = 2,2 hours Order 2 Fleet Manager B requires his wagon within 3,6 hours Order 1 (delayed) H 2 = 3,6 hours Time Order 2

F-MAN Architecture: Current Scheme SERVER EDC HUB (SMPT) DPM AMM DB TCP Mobile operation SMS OBT www Internet http IVU web site ; NTUA web site

F-MAN Architecture: Three tier architecture AMM DPM WEB Tier (Presentation Logic) Business Tier (Business Logic) Data Tier

F-MAN Architecture -DPM

F-MAN Architecture- AMM

Management aspects need enhancement So far, so good………….. Many ideas 2% patents 5% products Conclusions and future work ETA methodology should be proved