September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.

Slides:



Advertisements
Similar presentations
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
January 8-10, 2003/ARR 1 IFE Structural Materials: ARIES Assessment M. C. Billone, A. R. Raffray, D. K. Sze, L. El-Guebaly and the ARIES team December.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
June 14-15, 2005/ARR 1 Status of ARIES-CS Power Core Engineering A. René Raffray University of California, San Diego ARIES Meeting UW June 14-15, 2005.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
June 14-15, 2006/ARR 1 ARIES-CS Power Core Engineering: Updating Power Flow, Blanket and Divertor Parameters for New Reference Case (R = 7.75 m, P fusion.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
Physics and Technology Trade-Offs in Optimizing Compact Stellarators as Power Plants Farrokh Najmabadi and the ARIES Team UC San Diego 21 st IEEE Symposium.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
January 11-13, 2005/ARR 1 Ceramic Breeder Blanket Coupled with Brayton Cycle Presented by: A. R. Raffray (University of California, San Diego) With contributions.
August 17, 2000 ARIES: Fusion Power Core and Power Cycle Engineering/ARR 1 ARIES: Fusion Power Core and Power Cycle Engineering The ARIES Team Presented.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
June 16, 2004/ARR 1 Thermal-Hydraulic Study of ARIES-CS Ceramic Breeder Blanket Coupled with a Brayton Cycle Presented by A. R. Raffray With contributions.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
November 4-5, 2004/ARR 1 ARIES-CS Power Core Options for Phase II and Focus of Engineering Effort A. René Raffray University of California, San Diego ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Overview of ARIES Compact Stellarator Study Farrokh Najmabadi and the ARIES Team UC San Diego US/Japan Workshop on Power Plant Studies & Related Advanced.
December 3-4, 2003/ARR,1 1 ARIES-CS Engineering Approach Presented by A. R. Raffray University of California, San Diego L. El-Guebaly S. Malang D. K.
February 24-25, 2005/ARR 1 ARIES-CS Power Core Engineering: Status and Next Steps A. René Raffray University of California, San Diego ARIES Meeting GA.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
Ceramic Breeder Blanket Conceptual Design for ARIES-CS Contributors: S. Malang, A.R. Raffray, and L. El-Guebaly ARIES Meeting University of Wisconsin,
March 8-9, 2004/ARR 1 Some of the Major Considerations in Designing a Ceramic Breeder Blanket for ARIES-CS Presented by A. R. Raffray With contribution.
January 23, 2006/ARR 1 Status of Engineering Effort on ARIES-CS Power Core Presented by A. René Raffray University of California, San Diego With contributions.
December 3-4, 2003/ARR 1 Maintenance Studies for 3-Field Period and 2-Field Period Configurations Presented by A. R. Raffray Major Contributors: X. Wang.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
December 12-13, 2007/ARR 1 Power Core Engineering: Design Updates and Trade-Off Studies A. René Raffray University of California, San Diego ARIES Meeting.
Aug. 8-9, 2006 HAPL meeting, GA 1 Advanced Chamber Concept with Magnetic Intervention: - Ion Dump Issues - Status of Blanket Study A. René Raffray UCSD.
May 6-7, 2003/ARR 1 ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach Presented by A. R. Raffray University of California, San Diego.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
April 3-4, 2007/ARR 1 Engineering Input to System Code and Trade-Off Studies to Assess Sensitivities of Major Functions to Engineering Parameters Presented.
Neutronics Parameters for Preferred Chamber Configuration with Magnetic Intervention Mohamed Sawan Ed Marriott, Carol Aplin UW Fusion Technology Inst.
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
Fusion: Bringing star power to earth Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego NES Grand Challenges.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Engineering Overview of ARIES-ACT1 M. S. Tillack, X. R. Wang and the ARIES Team Japan/US Workshop on Power Plant Studies and Advanced Technologies
February 5-6, 2004 HAPL meeting, G.Tech. 1 HAPL Blanket Strategy A. René Raffray UCSD With contributions from M. Sawan and I. Sviatoslavsky UW HAPL Meeting.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
Helium-Cooled Divertor Options and Analysis
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Required Dimensions of HAPL Core System with Magnetic Intervention Mohamed Sawan Carol Aplin UW Fusion Technology Inst. Rene Raffray UCSD HAPL Project.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
March 3-4, 2005 HAPL meeting, NRL 1 Assessment of Blanket Options for Magnetic Diversion Concept A. René Raffray UCSD With contributions from M. Sawan.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
MELCOR model development for ARIES Safety Analysis
Updates of the ARIES-CS Power Core Configuration and Maintenance
DCLL TBM Reference Design
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
University of California, San Diego
CERAMIC BREEDER BLANKET FOR ARIES-CS
Trade-Off Studies and Engineering Input to System Code
CERAMIC BREEDER BLANKET FOR ARIES-CS
Presented by A. R. Raffray University of Wisconsin, Madison
Status of ARIES-CS Power Core Engineering
CERAMIC BREEDER BLANKET FOR ARIES-CS
ARIES-CS Maintenance Scheme and Blanket Design for Modular Approach
ARIES-CS Power Core Engineering: Status and Next Steps
University of California, San Diego
Presentation transcript:

September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego ARIES Meeting PPPL September 15-16, 2005

September 15-16, 2005/ARR 2 Major Focus of Engineering Effort During Phase II (from before) 1.Divertor design and analysis 2.Detailed design and analysis of dual coolant concept with a self-cooled Pb-17Li zone and He-cooled RAFS structure: Modular concept first for port-based maintenance Field-period based maintenance concept next (can use modular concept also) 3.Coil design and analysis (including structural support) 4.Design integration with credible details for both maintenance schemes. -power core components, -maintenance -ancillary equipment

September 15-16, 2005/ARR 3 Action Items for Phase II (from before) 1.Run LOCA/LOFA case with low contact resistance between blanket and hot shield (UW) Done 2.Check effect of local radial conductance in blanket and between shield and vacuum vessel (UW) Done 3.Do we need to consider any other accident scenario? (INEL/UW) LOVA ?? 4.Structural analysis of coil support to have a better definition of required thickness of coil structure (MIT/UCSD/UW) In progress 5.Details of module attachment and replacement (choice between “single” module maintenance or “series” module maintenance) (FNTC/UCSD) Done 6.Port maintenance including all pipes and lines (realistic 3-D layout including accommodation of all penetrations) (UCSD) Phase III Details of module design and thermal-hydraulic analysis for dual coolant design coupled to Brayton power cycle(FNTC/UCSD) Done 7.Coolant lines coupling to the heat exchanger (choice of HX material, e.g. W-coated FS vs. refractory alloy such as niobium alloy) (FNTC/UCSD/INEL) In progress 8.Tritium extraction system for Pb-17Li + tritium inventories (FNTC/UCSD/INEL) In progress 9.How high can we push the Pb-17Li/FS interface temperature based on corrosion limits? (FNTC/UCSD) Done 10.External vacuum vessel design (thickness and configuration)(FNTC/UCSD) Phase III 11.Divertor design and analysis (T. Ihli/UCSD/GTech) Done, integration in progress 12.Divertor physics (RPI/UCSD) In progress

September 15-16, 2005/ARR 4 Divertor Study Good progress (but further progress needed on physics study) Design introduced at ISFNT-7, to be described in more detail at SOFE (physics + design presentations) and in journal publication. W alloy outer tube W alloy inner cartridge W armor

September 15-16, 2005/ARR 5 Coil Structural Design and Analysis Good progress from UCSD/UW/PPPL For given current in coils, maximum magnetic field quite high (~18 T) Forces calculated and stress analysis of bucking cylinder performed: structural mass of bucking cylinder can be significantly reduced Structural analysis of coil structure to be performed next Converge on design of SC (MIT): Nb 3 Sn ok for given bend radii?

September 15-16, 2005/ARR 6 Ancillary Equipment Tritium extraction and recovery method through permeation prior to HX Heat exchanger design and material choice -Connection to blanket structural material -Compatibility with Pb-17Li at a temperature of up to ~ °C -Niobium? Can benefit from effort on ITER test module, which can be updated and applied to our blanket configuration (B. Merrill)

September 15-16, 2005/ARR 7 Dual Coolant Module Design Design and cooling configuration for dual-coolant blanket modular concept applicable to field-period based maintenance Maintenance of DC concept requires pipe cutting behind module. -Outside access for pipe cutting and rewelding -Neutron streaming a concern, but insertion of shield disk is a possible solution -Neutronics calculations to confirm thickness of blanket/shield required for reweldability of piping Motion study for removing power core replacement unit for field based maintenance schem indicates possible interference -Solutions include local shaving of blanket, local increase of cold shield and/or local displacement of coil Latest progress on maintenance to be presented at SOFE.

September 15-16, 2005/ARR 8 Optimization of DC Blanket Coupled to Brayton Cycle Assuming a Higher FS/Pb-17Li Compatibility Limit of 550°C and ODS FS for FW Are optimized parameter values reasonable? Some advantage at reducing wall load: higher cycle eff., higher Pb-17Li temp. Cycle eff. dependency on wall load should be considered in system study (update values previously provided to Jim)

September 15-16, 2005/ARR 9 Selection of Blanket Concept and Maintenance Scheme for Phase III Detailed Design Study Blanket 1.Dual Coolant concept with a self-cooled Pb-17Li zone and He-cooled RAFS structure with SiC-composite as electrical (and thermal) insulator between flowing LM and steel structure. 2.Self-cooled Pb-17Li blanket with SiC/SiC f composite as structural material. Maintenance Scheme 1.Field-period-based maintenance scheme 2.Port-based maintenance scheme Suggested procedure Summary write-up of advantages and issues for each option Individual and group discussion before next meeting Decision on selection at next ARIES meeting (December 2005) based on combination of quantitative parameters and engineering judgement