Chandra Calibration Status ACIS 1.Gain corrections for epochs 28 and 29 (Nov. 2006 – April 2007) were released in CALDB 3.4 on May 16, 2007. 2.Gain corrections.

Slides:



Advertisements
Similar presentations
RHESSI Investigations of the Neupert Effect in Solar Flares Brian R. Dennis AAS/SPD Meeting 6 June 2002.
Advertisements

Suzaku XRT Update Kai-Wing Chan, Yoshi Maeda & the XRT Team 3-MAY-2007.
Imaging Analysis Aneta Siemiginowska Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Chandra Calibration Status ACIS 1.Gain correction files for epochs 30, 31 and 32 were released in CALDB (Sept 2007), (Dec. 2007) and
Progress Report Ian Evans (CXCDS) On behalf of the Chandra Source Catalog Project Team Chandra Users’ Committee Meeting April 9, 2008.
Progress Report Ian Evans (CXCDS) and Jonathan McDowell (SDS) Chandra Users ’ Committee Meeting September 19, 2007.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 08 – March 09 Roger Brissenden CXC Manager 06 April 2008.
CUC Oct 2005 Science Data Systems Jonathan McDowell.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Chandra X-Ray Observatory CXC Aspect team April 25, Default Aimpoint Offset Revision for ACIS-S and ACIS-I  Since 2005 the Aspect Camera alignment.
Chandra Calibration Status ACIS 1.Gain correction files for epochs 33 and 34 were released in CALDB (June 2008) and (Sep. 2008). HETG 1. An.
XMM EPIC MOS Steve Sembay ESAC 04/10/05 Implementation of the MOS spatial/temporal DRM: Does it work ? Zeta Puppis: Checking the line.
Chandra Calibration Status Calibration Updates Since Last CUC Meeting ACIS 1. New tgain files were released for epochs 23 and 24 (May 2005 – Nov 2005)
Chandra Calibration Status  Gain correction files for epochs 35 (Aug. – Oct. 2008) and 36 (Nov Jan.2009) were released in CALDB versions
CXC Manager’s Status Report For the period April 06 – September 06 Chandra Users’ Committee Meeting Roger Brissenden 17 October 2006.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Saclay 24/09/03 Epoch dependant MOS QE and RMF and Cross-calibration with the PN.
Some Chandra Basics. Chandra X-Ray Observatory.
Evaluation of the EPIC flux cross-calibration from 2XMM sources R. Saxton, S. Mateos, A. Read, S. Sembay Mateos et al., 2009, A&A, arXiv
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
Vadim Burwitz EPIC Calibration Meeting, October 27, 2006 RX J1856 HZ 43Sirius B Further work on cross-calibration results obtained from observations of.
Chandra Calibration Status Summary 1.The gratings and mirrors are very well calibrated at this time and there are no time-dependent effects as far as we.
Chandra Calibration Status  Recent releases  Current Calibration projects  Cross-Calibration between Chandra and other X-ray telescopes  Revisions.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 19 October 2005.
Chandra Calibration Status Calibration Updates Since Last CUC Meeting ACIS 1. A full set of calibration products for S0, S4 and S5 at T=-120 C, including.
Chandra X-Ray Observatory CXC SOT, FOT, ACIS & MSFC PS October 19, Update on a Proposed Bakeout CXC SOT & FOT, ACIS Instrument Team and CXC SOT.
Chandra Calibration Status Calibration Updates Since Last CUC Meeting ACIS 2. New products were released in CALDB on Dec. 15, 2006 to properly handle.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
Chandra Calibration Status  Highlights of the IACHEC Meeting  Updates to the LETG/HRC-S calibration  Continuous Clocking (CC) mode calibration.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Nov ACIS Calibration: Planned Updates & Future Issues 2.ACIS Operations: Controlling the.
GLAST LAT ProjectDC1 Closeout Workshop, Feb , Post-DC1 Work Seth Digel (HEPL/Stanford Univ.) Post-DC1 Work.
Chandra Calibration Status CUC Meeting Oct. 13, 2011.
Chandra Calibration Status  Highlights from the Chandra Calibration Review  New results on the HRMA effective area  Updates to the ACIS contamination.
Chandra X-ray Center Martin Elvis Smithsonian Astrophysical Observatory Welcome to the 4 th Chandra – CIAO Workshop 20 – 22 May 2002.
Chandra X-Ray Observatory CXC Paul Plucinsky February A Comparison of Spectral Fit Results of E0102 from the Chandra and XMM CCDs Paul Plucinsky.
T. Burnett: IRF status 5-feb-061 DC2 IRF Status Meeting agenda, references at:
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal October Comparison of RGS Model for 1E to the HETG data 2.BI CCD CTI Correction.
CXC CUC September SDS Page 1 CUC Sep 2007 Science Data Systems – Jonathan McDowell.
Chandra X-Ray Observatory CXC ACIS Ops team October 17, ACIS Changes Starting in Cycle 8 1) Selection of Optional CCDs 2) Revised Energy-to-PH conversion.
Vadim Burwitz EPIC Cal., Nov 6, 2007 Update on the Low Energy Isolated Neutron Star and White Dwarf Cross-Calibration Standards Vadim Burwitz EPIC Calibration.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
X-ray Astronomy School 2007 Databases, software, etc. for X-ray astronomy Keith Arnaud NASA Goddard University of Maryland.
Not Your Advisor's CIAO... - an update on Chandra's CIAO analysis system Jonathan McDowell Doug Burke, Antonella Fruscione, Aneta Sieimiginowska and the.
CXC CUC April SDS Page 1 Science Data Systems – Jonathan McDowell CUC April 2007 SCIENCE DATA SYSTEMS.
CUC Oct 2014 CXC Jonathan McDowell. I will report on CIAO (user software) and the standard processing pipeline software, which come into being thanks.
SDS – Jonathan McDowell Chandra Users' Committee, Apr 2006 Chandra Source Catalog Repro 3 CIAO status Testing Data analysis issues.
Chandra Users’ Committee CXC Manager’s Status Report For the period October 2009 – April 2010 Roger Brissenden CXC Manager 27 April 2009.
Herman L. Marshall (MIT), Allyn Tennant (MSFC), Catherine E. Grant (MIT), Adam P. Hitchcock (Dept. Chemistry, McMaster U.), Steve O’Dell (MSFC), Paul P.
WFPC2 UPDATE TIPS : August 15, 2002 L.M. Lubin New WFPC2 Documentation 1.Cycle 12 Instrument Handbook (V7.0, Biretta et al.)  Updated information on the.
X-rays from Mars K. Dennerl, C. Lisse, A. Bhardwaj, V. Burwitz, J. Englhauser, H. Gunell, M. Holstrom, F. Jansen, V. Kharchenko, and P. Rodriguez-Pascual.
Serving Data to the GLAST Users Community Thomas E. Stephens (GSFC/RSIS) for the GLAST Science Support Center Abstract.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
3/16/04mwb, sek, MIT/CSR MIT XIS Status 16 March 2004 Overview: TCE board rebuild status Back-illuminated CCD performance & status (Slightly) improved.
CUC Apr 2010 CXC-SDS CIAO Jonathan McDowell. CUC Apr 2010 CXC-SDS CIAO Update – Jonathan McDowell Community support CIAO 4.2 released late 2009; CIAO.
1 John Nousek & David Burrows (Penn State University) Alberto Moretti (Osservatorio Astronomico di Brera) X-Ray Telescope (XRT): Performance after Five.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
X-ray Astronomy School 2005 Databases, software, etc. for X-ray astronomy Keith Arnaud NASA Goddard University of Maryland.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
The onboard calibration for the spaced-row charge injection of the Suzaku XIS Hideki Uchiyama, Yoshiaki Hyodo, Hiroya Yamaguchi, Hideyuki Mori, Takeshi.
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
Instrumental limits to our knowledge in X-ray Astronomy Matteo Guainazzi (ASTRO-H ESA Science Operations Centre) Calibration (as any truly scientific endeavors)
M.D. Nov 27th 2002M0' workshop1 M0’ linearity study  Contents : Electronic injection Laser injection Beam injection Conclusion.
GLAST Science Support Center November 8, 2005 GUC Action Item #15 AI#15: Pre-Launch GI Proposal Tools David Band (GSSC/JCA-UMBC)
Single Object Slitless Spectroscopy Simulations
PACS Calibration Status Report
Chandra Calibration Status
Presentation transcript:

Chandra Calibration Status ACIS 1.Gain corrections for epochs 28 and 29 (Nov – April 2007) were released in CALDB 3.4 on May 16, Gain corrections for epoch 30 (May 2007 – July 2007) were released in CALDB on Sep. 14, The blank sky background data sets for ACIS-I and ACIS-S2 were reprocessed with the latest calibration products and released in CALDB CTI-corrected blank sky background data sets for the BI chips and updated background data sets for the remaining FI chips were released in CALDB

HRC 1.Time-dependent gain correction tables (one for each year) for the HRC-I were released in CALDB An updated HRC-I de-gap corrections table derived from the AO8 Capella raster scan was released in CALDB This improves image reconstruction for off-axis sources.

LETG 1.An updated HRC-S QE table was released in CALDB 3.4 with revisions near the O-K edge. HETG 1. Revised ACIS-S/MEG 1 st order LSF parameters were released in CALDB 3.4. HRMA 1. A verified Linux version of SAOsac was delivered to SDS for packaging into a downloadable version of the ray trace program.

ACIS Flight Grades ACIS Calibration Projects Improve calibration of graded mode data

CTI-Corrected graded mode data

CTI-corrected graded mode data

Grade distribution for CC mode data

CTI-corrected CC mode data

Revise ACIS contamination model

ACIS Contaminant

HRC Calibration Projects HRC-I gain corrections

HRC-I QE Uniformity

HRC-I vs. HRC-S count rate for HZ43

HRC-I Calibration Projects 1.Monitor the HRC-I and HRC-S QE, gain, and filter transmission. 2.HRC-I QE map – there is evidence for decrease in the off-axis low energy QE of the HRC-I. 3.Absolute HRC-I QE – resolve the discrepancy between the observed and expected count rate of RXJ Calibrate the small scale gain variations in the HRC-I gain. 5.Update the HRC-I rmf using the time-dependent gain corrections.

LETG/HRC-S Calibration Projects Time-dependent gain corrections

LETG/HRC-S Calibration Projects 1.Generate high spatial resolution time-dependent gain corrections for the HRC-S 2.Revise the HRC-S QE below the C-K edge. 3.Incorporate the non-linearity in the LETG/HRC-S dispersion relation into the line response function. 4.Improve the LETG/HRC-S dispersion relation corrections using a larger database of emission line sources. 5.Investigate the cause of the 5% drop in count rate in the LETG/HRC-S observations of HZ43.

HRMA Calibration Projects HRMA Calibration Projects 1.Continue development of a “user friendly” portable Linux version of the SAOsac software package. 2.Post an engineering version of SAOsac on the contributed CXC software page. 3.Continue work on calibrating the ACIS PSF of piled-up images. 4.Refine the measurements on the drift of the optical axis. 5.Continue XMM-Newton/Chandra cross-calibration efforts. HETG Calibration Projects 1. Improve CC mode HETG/ACIS-S data.