Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
IEKP - Universität Karlsruhe (TH) 1 Preliminary Pinhole Studies (not final) F. Hartmann IEKP - Universität Karlsruhe (TH) Creation of defined.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
The Order of Operations Also known as the hierarchy of math operations.
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Dahee Kim (Ewha womans university) for MPC-EX collaboration TEST OF MINI-PAD SILICON SENSOR FOR PHENIX MPC-EX.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Strasbourg status Ring 7 pilot run François Didierjean.
Central European Consortium R&D of Central European Consortium (CEC) Status & Plans (Sensor Technology) Georg Steinbrück, Hamburg University Aachen DESY.
Beginners Rounding. A Poem to help you remember how to round… Find your place number. Look right next door. 4 or less just ignore. 5 or more, add 1 more.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Results of short module and qualification strategy
TK Upgrade report.
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Design and fabrication of Endcap prototype sensors (petalet)
Status Brussels GANTRY
Beginners Rounding.
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Recent TOB Developments
Vienna Module Production
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Module Production in Brussels
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Noise in TOB modules and sensor quality
Is Increased Bias Current and CMN Correlated?
TEC module quality overview
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
IEKP - Universität Karlsruhe (TH)
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision agreement (Aa-Ka): 30-50µm Problems with the zero-positioning! (circle-ellipse-hole!?! in the graphite) One example:

Frank Hartmann IEKP TEC Meeting July 03 Circle hole in graphite & bush Round holebush

Frank Hartmann IEKP TEC Meeting July 03 Ellipse hole Another focus!

Frank Hartmann IEKP TEC Meeting July 03 Ring 4 mechanical qualification 8 R4 modules from Lyon  KA Already measured!  Aachen for crosscheck (Braunschweig yesterday) To mention : 4 sensors are within 10µm vs. rot. 2 sensors are +60µm off vs. rot. 2 sensors are -60µm off vs. rot. –?? 4 sensors/plate 4 in the “middle”, 2 “left”, 2 “right” ??

Frank Hartmann IEKP TEC Meeting July 035 pt100 Module Ring 5 (front-back) normal stereo

Frank Hartmann IEKP TEC Meeting July 03 Dummy petal assembly KA-dummy-petal-cooling TASK-FORCE

Frank Hartmann IEKP TEC Meeting July 03 Ready Detail: bridge IR Leds to inject current to simulate irrad. To investigate cooling at final power consumption! ( =950 & 1050nm) IR Leds

Frank Hartmann IEKP TEC Meeting July 03 Cooling tests in Stra

Frank Hartmann IEKP TEC Meeting July 03 R7 2 assembled (1 for KA, 1 for Stra) Mechanics: good, stiff, tolerance Si-graphite ~500µm 1st run: no problems All QTC defects found. leakage 3.6µA (250V) 2nd run: 1 NEW PINHOLE leakage (250V) 3rd run: 1 ADD. PINHOLE Leakage 400µA (250V)

Frank Hartmann IEKP TEC Meeting July 03 R7 prototype 1 in KA – 1 in Stra Known shorts Known pinhole 3rd run: Shorts, pinholes: bonds removed 1st run 3d run Add. Pinhole (see Tonys talk) 350µA (one strip) 70µA (one strip) 1st run

Frank Hartmann IEKP TEC Meeting July 03 Strip defects Strip 19, pinhole run 3 Strip Strip 105 new pinhole In 2nd run QTC pinhole! QTC short

Frank Hartmann IEKP TEC Meeting July 03

Frank Hartmann IEKP TEC Meeting July 03 R5 irrad hooked to hybrid all -12°C Cosmic run Some hot channels flagged