COSOSIMO Workshop Outbrief October 28, 2005 Jo Ann Lane University of Southern California Center for Software Engineering COCOMO Forum –

Slides:



Advertisements
Similar presentations
ISPA 4/5/04 1 Systems Engineering Sizing Via Requirements Ricardo Valerdi, USC Center for Software Engineering Viterbi School of Engineering ISPA Southern.
Advertisements

Full Day Workshop: Thursday, November 3, 2005, 8:00am – 5:00pm SAIC, Science Drive, Orlando, Florida Registration/Sign-In Begins at 7:30am Building.
Cost, Schedule, and Process Modeling Workshop USC CSSE Annual Research Review Facilitated by Jo Ann Lane.
University of Southern California Center for Systems and Software Engineering 2012 COCOMO Forum 1 October 18, 2012 Mauricio E. Peña Ricardo Valerdi Quantifying.
University of Southern California Center for Systems and Software Engineering SoS Engineering and the ICM Workshop Overview Jo Ann Lane USC CSSE
COCOMO Suite Model Unification Tool Ray Madachy 23rd International Forum on COCOMO and Systems/Software Cost Modeling October 27, 2008.
CS-1 6/1/ /1/2015 Towards a Work Breakdown Structure for Net Centric System of Systems Engineering and Management 20 th International Forum on COCOCMO.
COSYSMO 2.0 Workshop Summary (held Monday, March 17 th 2008) USC CSSE Annual Research Review March 18, 2008 Jared Fortune.
NDIA Software Industry Experts Panel Paul R. Croll, Chair NDIA Systems Engineering Division Meeting 24 June 2008.
Working Group Meeting (Outbrief) Ricardo Valerdi, Indrajeet Dixit, Garry Roedler Tuesday.
USC 21 st International Forum on Systems, Software, and COCOMO Cost Modeling Nov 2006 University of Southern California Center for Software Engineering.
University of Southern California Center for Software Engineering CSE USC System Dynamics Modeling of a Spiral Hybrid Process Ray Madachy, Barry Boehm,
March 2002 COSYSMO: COnstructive SYStems Engineering Cost MOdel Ricardo Valerdi USC Annual Research Review March 11, 2002.
University of Southern California Center for Systems and Software Engineering USC CSSE Research Overview Barry Boehm Sue Koolmanojwong Jo Ann Lane Nupul.
COSYSMO Adoption Process 21 st International Forum on COCOMO and Software Cost Modeling November 9, 2006 Chris MillerRicardo Valerdi.
11/08/06Copyright 2006, RCI1 CONIPMO Workshop Out-brief 21 st International Forum on COCOMO and Software Cost Modeling Donald J. Reifer Reifer Consultants,
COSYSMO: Constructive Systems Engineering Cost Model Ricardo Valerdi USC CSE Workshop October 25, 2001.
COSOSIMO October 2005 Workshop Jo Ann Lane University of Southern California Center for Software Engineering COCOMO Forum – October 2005.
COSOSIMO* Workshop 13 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE Annual.
University of Southern California Center for Systems and Software Engineering Integrating Systems and Software Engineering (IS&SE) with the Incremental.
1 COSYSMO 3.0: Future Research Directions Jared Fortune University of Southern California 2009 COCOMO Forum Massachusetts Institute of Technology.
University of Southern California Center for Systems and Software Engineering Next Generation Estimation Methods and Management Metrics: Working Group.
University of Southern California Center for Software Engineering CSE USC ©USC-CSE 10/23/01 1 COSYSMO Portion The COCOMO II Suite of Software Cost Estimation.
Extensions of COSYSMO to Represent Reuse 21 st International Forum on COCOMO and Software Cost Modeling November 9, 2006 Ricardo ValerdiJohn Gaffney Garry.
COSYSMO Reuse Extension 22 nd International Forum on COCOMO and Systems/Software Cost Modeling November 2, 2007 Ricardo ValerdiGan Wang Garry RoedlerJohn.
University of Southern California Center for Systems and Software Engineering System of Systems Engineering Cost Modeling: Strategies for Different Types.
26 October 2001DRAFT1 COSYSMO: Constructive Systems Engineering Cost Model USC CSC Workshop October 2001.
1 Systems Engineering Reuse Principles Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2010 Los Angeles, CA.
Welcome and Overview: Annual Research Review 2006 Barry Boehm, USC-CSE March 15, 2006.
1 Results of Reuse Survey Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Welcome and Overview: COCOMO / SCM #20 Forum and Workshops Barry Boehm, USC-CSE October 25, 2005.
Constructive System of Systems Integration Cost Model (COSOSIMO) Workshop November 7, 2006 ****************** Outbrief Jo Ann Lane
Process Synchronization Workshop Summary Report Jo Ann Lane University of Southern California Center for Software Engineering.
COSYSMO Workshop Summary Ricardo Valerdi Tuesday March 14, 2006 Los Angeles, CA USC Center for Software Engineering Annual Research Review.
COSYSMO Reuse Extension 22 nd International Forum on COCOMO and Systems/Software Cost Modeling November 2, 2007 Ricardo ValerdiGan Wang Garry RoedlerJohn.
USC 21 st International Forum on Systems, Software, and COCOMO Cost Modeling Nov 2006 University of Southern California Center for Software Engineering.
System-of-Systems Cost Modeling: COSOSIMO July 2005 Workshop Results Jo Ann Lane University of Southern California Center for Software Engineering.
University of Southern California Center for Systems and Software Engineering 1 November 2010 Mauricio Peña Dr. Ricardo Valerdi CHARACTERIZING THE IMPACT.
1 Discussion on Reuse Framework Jared Fortune, USC Ricardo Valerdi, MIT COSYSMO COCOMO Forum 2008 Los Angeles, CA.
Estimating System of Systems Engineering (SoSE) Effort Jo Ann Lane, USC Symposium on Complex Systems Engineering January 11-12, 2007.
Systems Engineering Reuse: A Report on the State of the Practice Jared Fortune, USC Ricardo Valerdi, MIT Gan Wang, BAE Systems COCOMO Forum 2008 Los Angeles,
11/1/07(c) USC-CSSE1 Welcome; CSSE Status and Plans Barry Boehm USC Center for System and Software Engineering COCOMO/SysE-SwE Estimation Forum #22 November.
SRDR Data Analysis Workshop Summary Brad Clark Ray Madachy Thomas Tan 25th International Forum on COCOMO and Systems/Software Cost Modeling November 5,
1 COSYSMO 2.0: A Cost Model and Framework for Systems Engineering Reuse Jared Fortune University of Southern California Ricardo Valerdi Massachusetts Institute.
COSOSIMO* Workshop Outbrief 14 March 2006 Jo Ann Lane University of Southern California Center for Software Engineering CSE.
Welcome and Overview: USC Center for Systems and Software Engineering Convocation and Executive Workshop Barry Boehm, USC Center for Systems.
University of Southern California Center for Software Engineering CSE USC 110/26/2004©USC-CSE Welcome and Overview: COCOMO / SCM #19 Forum and Workshops.
COSYSMO Reuse Extension COSYSMO Workshop – USC CSSE Annual Research Review March 17, 2008 Ricardo ValerdiGan Wang Garry RoedlerJohn Rieff Jared Fortune.
©2006 BAE Systems. Practical Implementation of COSYSMO Reuse Extension Gan Wang, Aaron Ankrum, Cort Millar, Alex Shernoff, Ricardo Valerdi.
Towards COSYSMO 2.0: Update on Reuse Jared Fortune, USC Ricardo Valerdi, MIT USC ARR 2009 Los Angeles, CA.
COSYSMO Workshop Outbrief CSSE Annual Research Review Los Angeles, CA Mon March 16 & Tues March 17, 2009 Ricardo Valerdi.
Copyright © 2001, Software Productivity Consortium NFP, Inc. SOFTWARE PRODUCTIVITY CONSORTIUM SOFTWARE PRODUCTIVITY CONSORTIUM COSYSMO Overview INCOSE.
University of Southern California Center for Software Engineering CSE USC 10/8/00©USC-CSE1 Expediting Technology Transfer via Affiliate Programs and Focused.
Using SysML to Estimate SoS Engineering and Development Effort Jo Ann Lane Tim Bohn COCOMO.
Gan Wang BAE Systems Ricardo Valerdi University of Arizona Garry J. Roedler Lockheed Martin Mauricio Pena Boeing Systems Engineering Reuse Delphi – Workshop.
University of Southern California Center for Systems and Software Engineering COSATMO/COSYSMO Workshop Jim Alstad, USC-CSSE Gan Wang, BAE Systems Garry.
February 2002Copyright 2002, USC1 COSYSMO: Constructive Systems Engineering Cost Model Status Briefing: GSAW 2002 February 2002.
University of Southern California Center for Systems and Software Engineering COCOMO Suite Toolset Ray Madachy, NPS Winsor Brown, USC.
1 Reggie Cole Lockheed Martin Senior Fellow Garry Roedler Lockheed Martin Fellow
PSM 1July/ August 2012 P RACTICAL S OFTWARE AND S YSTEMS M EASUREMENT What Does Technical Debt Mean at a System Level 2 August 2012 Bob Epps, Lockheed.
Overview of Addressing Risk with COSYSMO Garry Roedler & John Gaffney Lockheed Martin March 17, 2008.
Status Report Jim VanGaasbeek Ricardo Valerdi
PSM 2008 Workshop: Toward Integrating Systems Engineering and Software Engineering Estimation: Harmonizing COSYSMO and COCOMO John Gaffney
COSYSMO: Constructive Systems Engineering Cost Model
Towards COSYSMO 2.0: Update on Reuse
Working Group Meeting Report
University of Southern California Center for Software Engineering
COSYSMO: Constructive Systems Engineering Cost Model
October 18, 2012 Mauricio E. Peña Ricardo Valerdi
Generalized Reuse Model for COSYSMO Workshop Outbrief
Presentation transcript:

COSOSIMO Workshop Outbrief October 28, 2005 Jo Ann Lane University of Southern California Center for Software Engineering COCOMO Forum – October 2005 © USC CSE 2005

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Agenda SoS/FoS WBS ideas—Gan Wang, BAE Systems COSOSIMO Workshop July 2005 Survey Results –Overview of results –How to interpret –Call for additional responses SoS LSI management model ideas –Candidate ideas—Gary Constantine, Raytheon –Discussion Using COSYSMO to estimate SoS LSI technical effort

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Attendees Chris Angermeier, Raytheon Jack Arabian, CMA Beth O’Donnell, Boeing Sandy Stoller, Boeing Gary Thomas, Raytheon Brad Clark, SMI Anthony Peterson, Raytheon Gary Hafen, Lockheed Martin Dick Stutzke, SAIC Chris Miller, SSCI Vicki Love, Raytheon A Winsor Brown, USC CSE John Rieff, Raytheon Scott Rigby, Raytheon Kristen, Terry, BAE Systems Vu Nguyen, USC CSE Thomas Tan, USC CSE Barry Boehm, USC CSE Ali Nikolai, SAIC Mike Ross, Galorath Gary Constantine, Raytheon Dan Ligett, Softstar Joanne Boutte, Lockheed Martin Lecersia Clark, Lockheed Martin Mauricio Aguiar, TI Metricas Carol Dekkers, Qaulity Plus Tech Ricardo Valerdi, MIT Paul Stelling, Aerospace Gan Wang, BAE Systems Jo Ann Lane, USC CSE 30 attendees, representing 15 organizations….

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum October 2005 Workshop Objectives Clarify the Lead System Integrator (LSI) activities to be estimated by the COSOSIMO model Investigate candidate approach(es) for estimating the LSI program/business management effort Determine whether an SoS calibration of COSYSMO warrants further investigation as a viable approach for estimating LSI technical effort Begin converging on a relevant and complete set of parameters for the COSOSIMO model that are easily discerned in the early stages of SoS development

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum SoS Program WBS Discussion (Lead by Gan Wang, BAE Systems) Provided much deeper understanding of LSI role and associated activities Provided good framework for continuing discussions on “A day in the life of an LSI” The SoS Program The SoS in Operation Spiral AlphaSpiral BravoSpiral CharlieProgram Office Plan- Driven Team IV&V Team Agile Team Level 0 Level 1 Development

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum LSI Activity Discussions LSI Activities –Recommendation: LSI activities should be broken out into the following categories Program/business management activities (as opposed to technical management activities) Technical activities (which include technical management activities identified in EIA 632) –Results: Generated another list of LSI activities to compare with July 2005 list No significant new activities identified LSI Effort Program/Business Management Effort Technical Effort Proposed scope for COSOSIMO if technical can be estimated using COSYSMO SoS calibration Investigate possibility of COSYSMO SoS calibration to estimate this part

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Day in the Life of an LSI Plan, execution, monitoring and update (IMP/IMS) TIM/Reviews- planning and conduct Vendor mgmt Teammate management Crisis management (continual) Briefing Congress Prioritization Rebaseline Build SoI architecture Interface mgmt Change mgmt –Requirement –Architecture Risk management Travel planning Meeting coordination Resource allocation Source selection Types of TIMs –Interfaces –Functionality allocation –Workshare reallocation SoI Integration, V&V –Planning –Setup –Execution SOI: System of Interest

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Day in the Life of an LSI (continued) SOI financial analysis Organizational overhead activities (impact on schedule) Process management Audits (quality/organizational) Training –User –Team –Mentoring Personnel resource development ECP development Measurement collection and analysis Feasibility analyses/trade studies Engineering review boards CM

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Review of Candidate Program Management Cost Estimation Model Provided by Gary Constantine, Raytheon….

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Discussion Results Sample cost model helped clarify “management activities” to be estimated –Should focus on program/business management effort –Technical management should be part of technical effort Sample cost model (in Excel) will be provided as part of minutes to COSOSIMO Working Group End of workshop question: After all of the discussions on LSI technical and management activities, is a COSOSIMO with two primary parts (management module and an SoS-calibrated COSYSMO) is a viable way to proceed? ANSWER: (Almost?) unanimous yes

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Second Question: Viability of COSOSIMO Data Collection Affiliates queried about the availability of SoS LSI data in their organizations –Whether LSI-only data can be obtained –Whether data can be broken out into management and technical buckets General consensus: Data is available, just not as many programs as they had for COSYSMO at the system level Discussed options for collecting data from US government LSI organizations—several attendees took the action to identify potential points of contact

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Using COSYSMO to estimate SoS LSI technical effort Case Study exercise deferred due to lack of time…

COSOSIMO Workshop Results © USC CSE 2005 COCOMO Forum Action Items J. Lane Action Items –Update LSI activity descriptions with respect to the SoS WBS terms –Make a first cut at identifying WBS boxes for each of the LSI categories: management and technical –Update CSE COSOSIMO web page COSOSIMO Working Group Attendees –Provide LSI points of contact for data to J. Lane