DOE Review Caltech LXe DAQ. DOE Review Caltech Temperature and Pressure Monitoring RTD pressure sensor LXe N2 gas LN2 0.001-1500 Torr MKS.

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

MPPC readout electoronics
3442 Industrial Instruments 2 Chapter 11 Digital Controllers Dr. Bassam Kahhaleh Princess Sumaya Univ. Electronic Engineering Dept.
ME 322: Instrumentation Lecture 18 March 2, 2015 Professor Miles Greiner TC signal conditioner, Computer data acquisition introduction, Lab 7, myDAQ, LabVIEW.
PPT 206 Instrumentation, Measurement and Control SEM 2 (2012/2013) Dr. Hayder Kh. Q. Ali 1.
8A to 3.65V (100%), 5A to 2.57V (20%) 3.65V (100%) 2.57V (20%) 2.94V (47%) 3.04V (55%) 3.65V (100%) 2.57V (20%) 3.33V (76%) 2.91V.
Applying Wireless I/O Controller To NeSSI May 7, 2001 Mike Horton President & CEO Crossbow Technology, Inc.
Pre-shipping PMT screening at Chiba Chiba University Shigeru Yoshida for Kazuhiro “ Jee ” Fujimoto.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
Data Acquisition Purpose: Support rocket testing, provide a meaningful method to collect and store data Acquired from P7110 Measure sensor outputs  Load.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
July 16/17, 2002 MUEGAMMA review PSI1 Slow Control.
Embedded Sales Meeting COM Express Carrier. COM Express Carrier Card What is it? –Two PMC slot or two XMC slot on the top side of the board and one COM.
1 Design Review Feb 02 H.MATHEZ P.PANGAUD IPNL CNRS SUMMARY OF STATISTICAL RESULTS OVER CHIPS TESTED (FPPA 2000)
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Advanced Research Systems, Inc.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
List of realized laboratory exercises Radiation detection Alpha spectroscopy Gamma spectroscopy with scitillation detectors (NaI, CsI) Gamma spectroscopy.
DATA ACQUISITION SYSTEM FOR THE AESD Team : SEADAQ Members: Jarred Coulter Zane Sapp Vishu Gupta DETAILED DESIGN REVIEW SEPTEMBER 30, 2008 ARD, Carderock.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
Disc Thickness Measurement System. NI Based Measurement System NI Channel, 100 kS/s, 16-bit, ±10 V Simultaneous Sampling Analog Input Module.
Part 2…. R efreshment R eplenishing R obot Acquiring and Delivering.
15 March 2001Absorber Review Meeting at NIU1 DAQ for Pressure Test, and later... Michael J. Haney University of Illinois
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Met Values Monitoring at Graz Eastbourne, October 2005 Monitoring Met Values at SLR Graz.
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
Reading Atto group Hydrogen/Deuterium dissociation Time of flight hardware integration and data acquisition The University of Reading Leszek Frasinski,
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PXI Systems - Discussions Gueorgui ANTCHEV / EP-ESSEPTAB Meeting February 2003Slide 1 of 3 PXI = Compact PCI + eXtensions for Instrumentation PXI is an.
Digital Electronics and Computer Interfacing Tim Mewes 5. Computer Interfacing – DAQ cards.
ASIC Activities for the PANDA GSI Peter Wieczorek.
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
S3 INNOVATION ELECTRONICS. LESSON TITLE: ELECTRONICS Learning Intention: To understand when to use different types of logic gates Activity: Building own.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
MPPC mass check Jan9/2007 Hidetoshi OTONO. Our plan for mass check with relays MPPC relayOn MPPC relayOFF MPPC relayOFF DC board AMPADC relayOFF 測定対象.
ILC-CAL Test status of HPK photon sensors Kobe-U Y.Tamura / K.Kawagoe Confidential: do not distribute outside.
A Presentation on Mr. SAJID NAEEM M.SC – Electronics (UOP) PG-DEP (C-DAC)
教育卡(电子卡) 身份信息认证指导 (学生). 身份信息认证渠道 教育卡管理中心为学生提供了 “ 教育卡官方网站 ” 和 “ 教育人人通客户端 ” 两种认证渠道。 1 教育人人通客户端 2 ●● 您可以在教育卡网站的 “ 人人通客户端 ” 版块下载江苏教育人人通客户端。
Hall B Gas System Controls Physics Detector Support Group.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Hall B Drift Chamber Gas System Proposal. Using New Equipment Ethernet EPICS Analog In Analog Out MKS GE50 Ethernet Switch Ethernet cRIO.
Arduino Week 3 Lab ECE 1020 Prof. Ahmadi. Objective Data acquisition (DAQ) is the process of measuring an electrical or physical phenomenon such as voltage,
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
@ Professor Doug Harper Department of Physics and Astronomy
ProtoDUNE SP – Slow control temperature readout setup test
Magnet Slowcontrol Overview Mu3e DAQ system
Disc Thickness Measurement System
SIO-RTD RTD MODULE.
TORQUE MEASURMENT.
Data acquisition and data processing software for magnetic measurements for NICA magnets Alexander Bychkov LHEP, JINR 2017.
Lesson 2: Introduction to Control programming using Labview
P08453: Turbomachinery Flow Visualization
Five Key Computer Components
Data Acquisition (DAQ)
Control Systems Kyle J. Hadcock.
News from Technical Coordination
University of Illinois (UIUC)
University of Illinois (UIUC)
Presentation transcript:

DOE Review Caltech LXe DAQ

DOE Review Caltech Temperature and Pressure Monitoring RTD pressure sensor LXe N2 gas LN Torr MKS 0-30 psi Omega 0-60 psi Omega MUX PC 2-channel cryogenic temp monitor queries all DAQ channels and stores data on disk once every 5 secs MUX switch

DOE Review Caltech Light Measurement APD 2249W Lecroy ADC CAMAC crate with Jorway 73A controller PC common gate 12 input channels charge integration

DOE Review Caltech PC setup LabView COM1 to cryogenic monitor 1 to MKS pressure sensor COM2 Canberra MCA to APD NI 6024E analog/digital I/O cardto MUX and Omega sensors GPIB card to cryogenic monitor 2 (temporary) LSI Logic SCSI adapter to Jorway 73A controller ? 5 PCI slots

DOE Review Caltech Ar cooldown