1 Freight Performance Measurement Presented to Texas Border Partnership Group 14 June 2006.

Slides:



Advertisements
Similar presentations
Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Transportation Border Working Group
Idaho/Canada Border Issues Transportation Border Working Group Meeting Coeur d’Alene, ID April 22-23, 2008.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
Developing Freight Performance Measures At U.S. Canadian Border Crossings Bruce Lambert.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
URBAN FREIGHT Getting kicked to the curb?. How will we live?
Freight Data - A Transportation Perspective September 2010 Michael Sprung – FHWA, Office of Freight Management and Operations.
Washington State Truck Freight Performance Measure Research Interim Report Dale A Tabat Truck Freight Program and Policy Manager Freight Systems Division.
DETERMINATION OF FREIGHT CORRIDORS FOR THE STATE OF CALIFORNIA Texas A&M University Civil Engineering Department CVEN April 28, 2003 ADHARA CASTELBLANCO.
TxDOT Project Developing Freight Highway Corridor Performance Measure Strategies in Texas.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
1 SAFETEA: Transportation System Management, Operations and ITS Jeffrey F. Paniati Associate Administrator, Office of Operations Federal Highway Administration.
Freight Performance Measures Crystal Jones FHWA Office of Freight Management and Operations.
Jeffrey F. Paniati Executive Director Federal Highway Administration US Department of Transportation Washington, DC Reducing Congestion Tools of.
Talking Freight April 15, General Themes Seen in Reauthorization Proposals/Positions Defining a federal role in freight and goods movement given.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
SAFETEA-LU Highlights Roger Petzold Office of Interstate and Border Planning Federal Highway Administration Transportation Border Working Group Nov. 9,
Moving Ahead for Progress in the 21 st Century Act of 2011 Potential Freight Implications FHWA Talking Freight December 2011 Tony Furst, Director FHWA.
FY 2012 President’s Budget Released February 14, 2011.
Transportation leadership you can trust. presented to Talking Freight Seminar presented by Richard Margiotta Cambridge Systematics, Inc. September 21,
Ohio Transportation Planning Conference July 16, 2014.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
A M O T I A A N N U A L M E E T I N G 2 3 S E P T E M B E R N A S H V I L L E, T N 1 A View from the State DOTs Joung H. Lee Associate Director.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
1 Freight Performance Measurement Presented to Transportation Border Working Group on 7 June 2006.
National Multimodal Freight Trends/Issues/Forecasts/ Policy Implications.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
Freight Performance Measures Unit 4: Performance Measures.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
Promoting security, travel, and trade Transportation Border Working Group – April 2008.
Border Efficiency Research Initiatives American Transportation Research Institute August 16, 2006.
5 th Bi-Annual Border to Border Conference Performance Measures at Commercial Ports of Entry Juan Carlos Villa.
Beyond the Border Canada – United States Transportation Border Working Group Buffalo, New York April 8-9, 2014.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
Module Funding Sources, Requirements, and Opportunities Identify, access, and share funding to support road safety initiatives.
Developing Real-Time Freight Performance Measures Crystal Jones FHWA Office of Freight Management October 20, 2004.
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
Projects of National and Regional Significance Program.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
Greening the Trade Corridors in North America: Why Corridors and Why Green? Benjamin Teitelbaum CEC, April 22 nd.
Freight Data for System Performance Measurement Jeff Short American Transportation Research Institute (ATRI) Talking Freight August 18, 2010.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Michele Mueller Senior Project Manager Applying Intelligent Transportation Systems to Cross Border Issues TC / FHWA Regional Roundtable Mike Barnet Senior.
Freight-21: A National Strategic Freight Mobility Program & Trust Fund Coalition for America’s Gateways and Trade Corridors.
Abstract Background Methodology Methods While the project is in the data-collection and background research phase, there are several studies that utilize.
Tiffany Julien Office of Freight Management and Operations Implementation of the National Freight Network 1.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration US Department of Transportation Congestion Initiative Update I-95.
National Modeling TRB Transportation Planning Applications Conference May 5, 2013.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
Freight Partnerships = Economic Development and Freight Performance Pete Rahn Missouri Department of Transportation AASHTO 2009 Annual Meeting Palm Desert,
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
SAFETEA-LU System Management and Operations Provisions Jeff Lindley Director of the Office of Transportation Management Office of Operations Federal Highway.
1 USDOT Congestion Initiative Baltimore – Washington Regional Traffic Signal Forum Maritime Institute Linthicum, MD March 14, 2007 Regina McElroy Director,
FHWA Operations Core Business Unit National Associations Working Group April 8, 1999 Christine Johnson Program Manager and Director, ITS Joint Program.
Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and the Congestion Mitigation and Air Quality Improvement.
Office of Freight Management and Operations 1200 New Jersey Avenue SE Washington, D.C FHWA Freight Intermodal.
Gateways & Trade Corridors FLUIDITY INDICATOR June 2014.
Mobility Goal--Continually improve the public’s access to activities, goods, and services through preservation, improvement, and expansion of the highway.
Presentation transcript:

1 Freight Performance Measurement Presented to Texas Border Partnership Group 14 June 2006

2 Global Connectivity Desired Outcome: Sustain the economic efficiency of goods movement on the surface transportation system. Measure(s): Travel time in significant freight corridors (baseline to be determined in FY 2006). Average Speed Buffer Time Index (a measure of travel time reliability) Delay time at NHS border crossings (baseline to be determined in FY 2006). (Measures TBD) Examples: Total Crossing Time Average Wait Time

3 Goals of the FPM Initiative Short Term Support Monitoring Progress in Global Connectivity Continuous and Accurate Data Mid Term Develop a rich data source that can be used by stakeholders in the transportation community and by academia Output that is flexible and useful for a variety of audiences Long Term Use (sound FPM) data to target investment in National Highway System based where the greatest needs exist Better truck travel data that could increase the strength and ranking of freight projects against general transportation projects

4 Data Collection Method  What?  Methodology use Trucks as Probes  Automatic Vehicle Location(AVL)/Satellite Technology  GPS Coordinates (Date and Time Stamped)  Unique Carrier ID  How?  Contractual partnership with American Transportation Research Institute, a Satellite Technology Vendor and Carriers  Initial data based on voluntary participation by selected carriers subscribers  Data Cleansing techniques allowed research team to collect data from all/most of the vendor’s carrier subscribers (~250,000 vehicles)

5 Accomplishments  Collecting, Analyzing and Processing data for Five Freight Significant Corridors  (I5, I10, I45, I65, I70)  1 Year of Data as of Jan 06  Collecting data for five US/Cda land border crossing areas  1 Year of Data as of Aug 06  As of 1 April 2006 we expanded data collection and analysis to 20 additional corridors (a more robust data set, greater “National Picture”)  Case studies scheduled with 8 States along the corridors  Weather and Work Zone Case Studies  New contract with technology vendor to include access to data for up to 10, 000 miles of arterials  Short Term and Long Term Data Sharing Strategies developed

6

7

8 CY 2005 Results Monthly Buffer Index for Five Corridors (CY05) JANFEBMARAPRMAYJUNJULAUGSEPTOCTNOVDEC Month Buffer Index Interstate 5 Interstate 10 Interstate 45 Interstate 65 Interstate 70

9 Average Speeds Five Corridors (CY 2005) JANFEBMARAPRMAYJUNJULAUGSEPTOCTNOVDEC Month Speed (MPH) Interstate 5 Interstate 10 Interstate 45 Interstate 65 Interstate 70 CY 2005 Results

10

11

12 Key Border Challenges – Some key border crossing points are seriously congested and transit times and the associated transportation costs are high. Physical infrastructure (transportation and other) at some border crossings require upgrading Clearance and Inspection procedures change and vary Localized data collection systems differ dramatically

13 FPM Border Component Data Collection Began 7/01/05 for 5 Crossings –Blaine (Pacific Highway): Blaine, WA –Pembina: Pembina, ND –Ambassador Bridge: Detroit, MI –Peace Bridge: Buffalo, NY Effort looks at crossings as well as transportation network that supports the crossings

14 Pacific Highway/Blaine U.S. Roadways PRIMARY HIGHWAY 1)Washington State Highway 543 1) Interstate 5 Canadian Roadways PRIMARY HIGHWAYS 1) Blaine Border Area (Route ID ‘BC’): 2) British Columbia Provincial 99 3) BC Provincial 15

15 U.S. Roadways PRIMARY HIGHWAYS 1)Michigan Route 3 2)Interstate 75 3)Interstate 94 4)Interstate 96 5)The Ambassador Bridge (AB): Canadian Roadways PRIMARY HIGHWAYS 1)ON Provincial 401 2)ON Provincial 3)E.C. Row EXPY FEEDER ROADS 4) ON Provincial 403 AMBASSADOR

16 PEMBINA U.S. Roadways PRIMARY HIGHWAY 1)Interstate 29 Canadian Roadways PRIMARY HIGHWAY 1)Manitoba Provincial 75 FEEDER ROADS 1)Trans Canada 100 (Winnipeg) 2) Trans Canada 1 3) Trans Canada 17 (Ontario)

17 PEACE BRIDGE U.S. Roadways PRIMARY HIGHWAYS 1)Peace Bridge Connector (US) 2) Interstate 190 FEEDER ROADS 1) Interstate 90 2) Interstate 79 Canadian Roadways PRIMARY HIGHWAY 1)Queen Elizabeth Way FEEDER ROADS 4) ON Provincial 403 5) ON Provincial 407

18 CHAMPLAIN U.S. Roadways PRIMARY HIGHWAY 1)Interstate 87 (I-87 Canadian Roadways PRIMARY HIGHWAY 1)Provincial 15 2)Provincial 30 3)Provincial 20

19 What Will be the Measures? Average delay per Truck Trip (in Minutes or Hours) Average Travel Time Total Delay Average annual cost of delay Buffer Time Buffer Index

20 Frequently Asked Questions Q: What is the primary focus of the initiative A: Historical data for monitoring performance. Not probable this will evolve to a “real-time” product Q: What is the sample size A: Technology vendor, has approximately 250,000 in USA, Canadian subsidiary adds additional vehicles Q: How did you select the five crossings? A: Five Border Crossings account for over 55% of inbound CV to US. Q: Who Owns the data? A: The carriers who subscribe to the vendor’s service Q: Can we share the data A: Aggregated/summarized data can be shared with little limitations, currently able to share raw data with public transportation agencies (primarily for assessment of utility) Q: What are the next steps

21 Key Next Steps Analyzing the US/Cda border data and developing appropriate measures of delay and wait time –Initiate effort to collect US/MX border data Small Grants in 2005 and 2006 for exploratory research US/MX Crossings / Corridors likely to be aligned with corridor work done by US/MX JWC Assessing utility beyond FHWA PM needs – Case Studies under way State Case Studies ( (includes Washington) Weather Case Study Work Zone Case Study Transitioning data to a performance measurement framework –Targets –Strategies and tactics to produce positive change

22 Future Research Arterial Data Collection and Analysis Incidents (Network Effects) Congestion Pricing at the Border Linked Journeys Directional Data Analysis Data to support Planning –Demand Modeling –Forecasting Models –Economic Analysis –Project Analysis (Before, After, During)

23 More Information Crystal Jones FHWA, Office of Freight Management and Operations

24 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) Section 1302, National Corridor Infrastructure Improvement Program Secretary to establish a program for receiving grant applications and establish criteria for selection. For States only. For projects in corridors of national significance to promote economic growth and international or interregional trade. –connect existing highway system segments, facilitate regional mobility, serve increasing freight volume, serve international freight volume, reduce congestion and travel time, serve high-value cargo, and use innovative financing $1.948 billion over 5 years ( ) for 33 designated projects

25 National Corridor Infrastructure Improvement Program Under SAFTEA-LU (TX) Texas, Arkansas, Mississippi, Tennessee, Kentucky, Indiana, [Louisiana] –Total Projects: 1 –Total Funding*: $50M –Project List: Planning, Design and Construction of I-69 (TX, LA, AR, MS, TN, KY, IN) Annual Funding Levels –2005: $5.0M –2006: $10.0M –2007: $12.5M –2008: $12.5M –2009: $10.0M *The funding levels in this column equal the totals authorized in SAFETEA-LU section 1302, however, the funding is subject to obligation limitation set in annual Appropriations Acts.

26 National Corridor Infrastructure Improvement Program Under SAFTEA-LU (Neighboring States) Louisiana –Total Projects: 5 –Total Funding*: $230M –Project List: Improvements to LA Highway 1 between Caminada Bridge and the LA1-US90 interchange [20]; Construction of 36 mi. segment of I-49 between AR state line and I-220 in Shreveport [150]; LA1 Replacement [5]; Construction of I-49 North from I-220 in Shreveport to AR state line [27.5]; Transportation improvements to I-49 South [27.5] Oklahoma –Total Projects: 2 –Total Funding*: $145M –Project List: Ports-to-Plains Corridor [35]; OK I-44 from Riverside to Yale Ave. in Tulsa [110]

27 For More Information FHWA Staff Contacts Ed Strocko Rolf Schmitt