A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.

Slides:



Advertisements
Similar presentations
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Advertisements

June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy ILC Controls Requirements Claude Saunders.
7-1 INTRODUCTION: SoA Introduced SoA in Chapter 6 Service-oriented architecture (SoA) - perspective that focuses on the development, use, and reuse of.
Accelerator control at iThemba LABS. Some background No formal reliability procedures Cost considerations SSC operational 24/7 Shutdown total of 2 months/year.
Business Continuity and DR, A Practical Implementation Mich Talebzadeh, Consultant, Deutsche Bank
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
–Streamline / organize Improve readability of code Decrease code volume/line count Simplify mechanisms Improve maintainability & clarity Decrease development.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
Introduction to EPICS (Ned Arnold, John Maclean).
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Chapter 4 Realtime Widely Distributed Instrumention System.
Henri Kujala Integration of programmable logic into a network front-end of a telecontrol system Supervisor: Professor Patric Östergård Instructor: Jouni.
Topics of presentation
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
FAIR Accelerator Controls Strategy
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
OS Services And Networking Support Juan Wang Qi Pan Department of Computer Science Southeastern University August 1999.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1. LabVIEW and EPICS Workshop EPICS Collaboration Meeting Fall 2011.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
The recent history and current state of the linac control system Tom Himel Dec 1,
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
Connecting LabVIEW to EPICS network
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Lecture 11. Switch Hardware Nowadays switches are very high performance computers with high hardware specifications Switches usually consist of a chassis.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
RF acceleration and transverse damper systems
Accelerator control at iThemba LABS
Presented by Li Gang Accelerator Control Group
IOT Critical Impact on DC Design
SNS Status Report Karen S. White 10/15/08.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
The ILC Control Work Packages
How SCADA Systems Work?.
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
COntrol, Data Access and Communication System for ITER
ILC Integrated Control System (Functional View)
EPICS: Experimental Physics and Industrial Control System
Presentation transcript:

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department of Energy ILC Control System Topics John Carwardine and Frank Lenkszus Contributions from: N. Arnold, B. Chase, D. Gurd, S. Simrock

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 2 Some control system topics Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 3 Aspects of an integrated control system Provide a common toolkit for implementing applications in a consistent way across the entire facility. Meet the needs of different types of user, including operators, system engineers, physicists, … Operator interface for facility control & monitoring Automation, sequencing, “slow” feedback Data acquisition for physics Archiving, retrieval, and analysis of machine data Physics modeling and simulation Save/restore of machine state Alarm management Mode control

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 4 Control System “Standard Model” IOC CAS Commercial Instruments Custom Chassis/Panels Technical Equipment EPICS Channel Access Input-Output Controllers (I/O to equipment, real-time applications) (CA Servers) Workstation-based Applications & Tools (CA Clients) Machine Interlocks via PLCs, relays, logic PLCs

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 5 Scalability of existing control systems The ILC will have 10x more technical systems and I/O points than any existing facility. Quantity of data that must be collected & archived -Network bandwidth issue. -Global data management issue. Network traffic and effect on clients & servers -Broadcast approach to client-server interactions does not scale well (name-servers or gateways needed instead) -Badly-behaved network attached devices.

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 6 Some control system trends Increasing use and availability of network attached devices -Embedding controls interfaces into individual devices, eg one controls interface per bpm. -Almost everything now comes with an Ethernet port and either custom software or an embedded web server. -Increasing expectation of Plug & Play convenience. -Streaming video distribution. Increasing use of commercial software packages, eg Matlab, IDL, LabView, etc -Control system toolkit should provide seemless integration.

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 7 A network management strategy At the control system level, maintain single layer network to minimize latencies (“Standard Model”). At the network level, manage geographically using smart switches with global backbone. Utilize separate, parallel (and redundant) networks -“Clean” network for the main control system. -“Dirty” network for plug/play network attached devices. -Streaming video network. -Dedicated network(s) for synchronous data (eg feedback apps). -Gateways to isolate general users from critical networks. I&C group needs to establish allowable network protocols, and determine what can be hooked up to each network.

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 8 Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 9 Remote access It is clear that experimenter tele-presence and remote collaboration will be an integral part of the ILC. To what extent should we include remote access and remote operation in the baseline design for the ILC accelerator?

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 10 Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 11 Timing & Synchronization RF Master Oscillator distribution Timing fiducials, triggers, event generation Real-time data link Must be considered as an integrated system -Responsibilities & interfaces with other ILC working groups? What signals are required, and with what precision/resolution? Reliability and availability -Single point of failure: redundant system? -Built-in diagnostics

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 12 Distributed RF references Required precision and the scale of ILC are major challenges. Globally distributed references -RF Master Oscillator: 1300MHz - Active phase stabilization -Sync pulses: 5Hz - Must be phased to account for propagation delays. -Star distributed to local timing reference generators Locally derived references -Damping ring RF (eg 650MHz) -PC gun laser (54MHz?) -Bunch clock (3MHz)

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 13 Grades of timing system precision All timing triggers derived from RF references. Pico-second precision is not required for all signals. Take graded approach to reduce cost. Grades of hardware trigger -High precision (pico-second): gun, kickers, bpms, detectors, etc -Medium precision (nano-second): septum, modulators, etc -Low precision / event system (micro-second) Software synchronization -Trigger software events, eg data collection

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 14 Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 15 Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 16 Relational databases Relational databases need to be established as an integral part of the project from an early stage -Initially will provide common source of parameters and component data for modeling and simulation. -Later will become a comprehensive database of technical information for the entire facility. Relational database contents -Accelerator parameters & components -Technical equipment and system interconnects -Control process points

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 17 All entities are inter-related … Modeling & simulation Physics & machine parameters

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 18 Integrated control system Remote access Timing & synchronization Machine protection Beam feedback systems Relational databases Control system reliability Standards

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 19 What do we mean by highly reliable? Mitigation should depend on the consequence of failure -Control system failure resulting in loss of beam. -Control system failure resulting in something bad happening. Field experience shows that most controls failures are due to power supplies and cooling failures or power cycling. Only have to be highly reliable during scheduled beam time -Take advantage of scheduled down time for preventative maintenance and pre-run testing. -Equipment diagnostics can help detect and prevent impending failures. Diagnostics need to be built in.

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 20 What do we mean by redundant systems? Hot spares that can be remotely swapped in when something fails to reduce beam downtime. Automatic fail-over to prevent downtime or equipment failure -How fast? Bump-less? At the I/O point level? -Implies the failure can be detected in a suitable timeframe. Hot spares could be maintained in an active state (but not attached) to ensure they are functional when needed.

ILC Control System Topics – Carwardine, Lenkszus Pioneering Science and Technology Office of Science U.S. Department of Energy 21 Closing remarks We are in a new era of building large-scale facilities through international collaborations of many institutions. The control system must work with (and for) everyone. It is important that we have agreement on responsibilities and interfaces between working groups. The project will benefit tremendously from early setup of relational databases for accelerator and technical data. Establishing and enforcing facility-wide controls & network protocols for all equipment will be essential.