© Geodata Australia CADASTRAL UPGRADE PROJECTS for LOCAL GOVERNMENT A Possible Upgrade Path.

Slides:



Advertisements
Similar presentations
REQUIRING A SPATIAL REFERENCE THE: NEED FOR RECTIFICATION.
Advertisements

The future of navigation in Cambodia Provided by Smarter Solutions © 2010 Smarter Solutions Co., Ltd. All rights reserved. All information contained herein.
Shaping the Cadastral Infrastructure for a Digital Future Craig Sandy Esri Australia.
System Development Life Cycle (SDLC)
LiberRATE Estimating It thinks like you do! Edition 3 Instructions Click on buttons to advance or to repeat the previous slide PreviousNext.
IIT Kanpur Web Based Land Records Management System Prof. P.K.Kalra Developed by Department of Electrical Engineering Indian Institute.
Geographic Base Maps; Map Projections; Using MapInfo Help I.Geographic Base Maps A.Definition B.Types 1. TIGER/ Line 2. Cadastral 3. Planimetric II. Map.
Annual World Bank Conference on Land and Poverty – 2014 Integrating Land Governance into the Post Agenda Managing Mapping and Survey Records in a.
Taking Core Products a Step Further USG Software and Customized Applications.
Managing a Cadastral SDI Framework Built from Boundary Data Michael Elfick Michael Elfick Tim Hodson Tim Hodson Curt Wilkinson Curt Wilkinson.
Unit One: GIS Concepts In this unit… ► What is GIS? ► Types of GIS data ► What can you do with GIS? ► ArcGIS 9 license levels ► Basics of the ArcGIS 9.
System Design and Analysis
Technical Support: (989) GIS and Mapping Procedures in ArcMap 9.x Creating an ArcMap Project Editing an ArcMap Project Printing an ArcMap Project.
Spatial solutions for utilities and government m u n s y s®m u n s y s® right tools – proven results “Bridging the gap between CAD and GIS for Cadastral.
Mobile Technology for Real Property Assessment Tax Assessor’s Office Davie County, North Carolina.
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
Data Input How do I transfer the paper map data and attribute data to a format that is usable by the GIS software? Data input involves both locational.
1 Alternate Title Slide: Presentation Name Goes Here Presenter’s Name Infrastructure Solutions Division Date GIS Perfct Ltd. Autodesk Value Added Reseller.
P. Joseph Lehman, Inc., Consulting Engineers incorporates Geographic Information Systems (GIS) software services with new and existing clients. Presentation.
Data Acquisition Lecture 8. Data Sources  Data Transfer  Getting data from the internet and importing  Data Collection  One of the most expensive.
GIS for Asset Management at United Arab Emirates University
ArcGIS Extensions Expanding the Use of ArcGIS
Rebecca Boger Earth and Environmental Sciences Brooklyn College.
Estonian e-Cadastre, cadastral workbench overview for electronic proceedings Priit Kuus Estonian Land Board / Department of Land Cadastre May 13, 2015.
Esri UC 2014 | Technical Workshop | Parcel Editing: Advanced Tim Hodson Jason Camerano.
TalentValue Veriproved Screening, LLC - Confidential Veriproved Screening, LLC offers a "wholesale" information retrieval network that enables distributors.
SPATIAL FRAMEWORK FOR A TITLE REGISTRATION SYSTEM: UNIQUE PARCEL IDENTIFIERS AND CADASTRAL MAPS.
Esri UC 2014 | Technical Workshop | Data Alignment and Management in ArcMap Lisa Stanners, Sean Jones.
Business systems are computer-based information systems that provide organizations with valuable information in a timely and effective manner to allow.
Rimantas Ramanauskas Kazys Maksvytis Alvydas Janulevičius State Enterprise Centre of Registers INTEGRATED PROCESSING OF DIGITAL CADASTRAL DATA IN LITHUANIA.
Project 3: Finding, Retrieving, and Viewing National Data Map Rick Hartlieb Ben Miller Alexis Phillips Jessica Plummer.
Developing Health Geographic Information Systems (HGIS) for Khorasan Province in Iran (Technical Report) S.H. Sanaei-Nejad, (MSc, PhD) Ferdowsi University.
GIS Maintenance & Tips Jennifer Kuchar. Maintenance is often the bottleneck of the entire GIS Enterprise Parcel Data AssessorRecorderAuditorSurveyor Planning.
This presentation will guide you though the initial stages of installation, through to producing your first report Click your mouse to advance the presentation.
Introduction to Systems Analysis and Design Trisha Cummings.
System Testing There are several steps in testing the system: –Function testing –Performance testing –Acceptance testing –Installation testing.
WV Tax Parcel Mapping Best Practices May 14 th 2013.
Copyright © 2005 Trimble Navigation Ltd. All rights reserved GPS Processing within the Geodatabase.
Pennsylvania State University – GEOG 596A Linda M. Foster, MGIS Candidate Justine Blanford, Advisor July 2011.
How does a community maintain a storm
Introduction to ArcGIS for Environmental Scientists Module 1 – Data Visualization Chapter 1 – GIS Basics.
material assembled from the web pages at
Using ArcView GIS: Part 3 Learning more of the basics for ArcMap Using ArcMap Part 3.
How do we represent the world in a GIS database?
Introduction of Geoprocessing Topic 7a 4/10/2007.
Intelligent Flood Maps forAutomatic Flood Determinations.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
© Geodata Australia Data Entry in GeoCadastre  A brief introduction to the data entry process in GeoCadastre illustrating the benefits and efficiencies.
Introduction of Geoprocessing Lecture 9. Geoprocessing  Geoprocessing is any GIS operation used to manipulate data. A typical geoprocessing operation.
Migrating Data into the Parcel Fabric in ArcMap
When you begin a project, a reference data layer is placed on the map first. This initial layer(s) is called the base map. There are different types of.
Working with CAD Data In ArcGIS Travis Wagner. New Features Adds CAD datasets as group layers –Still have the ability to access all feature types properties.
Queensland Digital Cadastral Dataset DCDB National Workshop Bill Gilder - Steve Tarbit.
NSW DCDB July 2010 BOB DAVIS, Team Leader DCDB Update BILL MILLER, Team Leader DCDB Upgrade.
The SCDB Landgate Western Australia Lou Teeuwissen Manager SCDB DCDB National Workshop Sydney
Section Corner Identification in Madison County Presented by: Erin Dyer.
Data Alignment and Management in ArcMap
Introduction of Geoprocessing Lecture 9 3/24/2008.
CONVERSION OF CAD DATA TO GIS LAYERS Challenges and Techniques Compiled by: Tope Bello Summer 2005 Instructor POEC 6387 GIS Workshop Professor Ronald Briggs.
Using ArcView GIS: Part 3 Learning more of the basics for ArcView Using ArcMap Part 3.
Land Services Group The South Australia Story DCDB National Workshop Sydney 28 – 30 July 2010 Presented by Mauri Trinca.
Real property valuation processes Jānis Gredzens
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
TASMANIAN JURISDICTIONAL UPDATE DCDB National Workshop28-30 July 2010 Andrew Tomes Manager - Spatial Data & Julian Gill Program Leader - Cadastral & Transport.
Esri UC 2014 | Technical Workshop | Migrating Data To The Parcel Fabric Christine Leslie Amir Bar-Maor.
Using ArcView GIS: Part 3
Introduction to GIS GIS in Cadastral Management
ADE EDIS READ & Optimizer TRAINING Colorado Department of Education
Systems Analysis and Design
Using CAD Parcel data with the Local Government Solution
Presentation transcript:

© Geodata Australia CADASTRAL UPGRADE PROJECTS for LOCAL GOVERNMENT A Possible Upgrade Path

© Geodata Australia Geodata Process The Geodata process using software developed by Michael Elfick with Mike Fletcher and Mimaka Pty Ltd and now represented by Geodata allows the creation of a coordinated digital cadastral database from original survey data thus preserving the mathematical integrity of the original survey observations

© Geodata Australia It is Unique  The traditional method for surveying land is to measure a precise control network and then use this to fix the position of the land parcel.  Geodata has followed the Elfick approach and adopted the inverse of this concept in that the land parcels are captured, joined and assembled and then analyzed to determine the amount and location of the control required.

© Geodata Australia The Background  The process was developed as a result of investigations and a trial conducted by the NSW Lands Department together with the Association of Consulting Surveyors and University of Newcastle to determine whether a reasonable and cost effective alternative existed to creating a DCDB from digitised topographical maps.  The decision was taken following the investigations to implement proposals to digitise topographical maps.  Michael Elfick continued developing his cadastral software – CADP in the belief that it presented a better Cadastral Database

© Geodata Australia The Background  CADP as the program was then known has been used to create and manage the NCDB in the ACT and the NT (NCDB is used to differentiate between the spatially accurate Geodata cadastre from the DCDB derived from digitised topographical maps.  CADP has also been used in NZ, USA and The Philippines for cadastral management projects and has been successfully trialed and demonstrated in a number of Australian jurisdictions CADP has been licensed to Geodata and renamed GeoCadastre

© Geodata Australia The ESRI Connection  Geodata and ESRI have worked collaboratively to incorporate GeoCadastre into ArcMap as an extension to Survey Analyst which will be released to international markets circa Q1 2007, in ArcGIS 9.2  The Survey Analyst 9.2 will allow the storage of cadastral data in a geodatabase without any loss of mathematical integrity to the survey data.  SurveyXML™ has been jointly developed with ESRI as an interchange format to transport cadastral data to the geodatabase.

© Geodata Australia CAD data Text and Paper Documents - Data automation and maintenance - GIS analysis - Enterprise mapping requirements - Land records - Surveys Information System - Measurement-based Cadastre Maps, Plats Field Books Geodatabase Applications GIS data Imagery Survey Data (measurements) Field Measurements Other survey and engineering file formats Other survey and engineering file formats The ESRI Model for Application of GeoCadastre within Survey Analyst

© Geodata Australia Step by Step Geodata Approach to Cadastral Upgrade Step 1 – Collate source Deposited Plans and machine readable survey data Step 2 – Capture and convert source data – data entry from survey plans and or electronic files Step 3 – Identify irregularities and misclose Step 4 – Rectify errors Step 5 – Incorporate base cadastre with client GIS systems Step 6 – Move Asset Layers to the Accurate Cadastre Step 7 – Consult on maintenance of cadastral dataset

© Geodata Australia Data Entry Parcels Joined & Assembled Fabric Adjusted Data Delivery to Clients Built Environment GeoCadastre Process Survey Plans NCDBNCDB Survey Record Web Delivery Possible

© Geodata Australia Conversion Stage 1 - Parcel Data Entry  Keyboard operation  Screen will display the lines as they are entered  Enter bearings distances and areas – in the plan units of measurement : calculation of close and accuracy applied by the software  Supervisor would check errors on regular basis and rectify as needed

© Geodata Australia Conversion Stage 1 - Parcel Data Entry As parcel data is entered from the keyboard the drawing appears on screen

© Geodata Australia Conversion Stage 2 - Parcel Joining  Achieved by mouse operation  Parcels joined together by clicking on matching points  Operator checks rotation and scale precision and notes errors for supervisor rectification

© Geodata Australia Conversion Stage 2 - Parcel Joining Joining – Check scale, then type ‘y’. Common points on the parcel and the existing fabric are selected Parcel to be joined to the fabric is selected and common points of connection are selected

© Geodata Australia Common Points Selected & Parcel is Added into the Cadastral Fabric The joined parcel is added to the fabric and now appears in the parcel explorer window as joined

© Geodata Australia Conversion Stage 3 Adjustment & Assembly  Select known co-ordinate control points to adjust an area  Choose geodetic system, zone and acceptable tolerance for the adjustment based on precision of survey plans  Run the co-ordinate adjustment process

© Geodata Australia Conversion Stage 3 – Co-ordinate Adjustment Tolerances set Listing file location nominated Adjustment summary detailed

© Geodata Australia Cadastre – Display Parameters Easements Roads and Parcel Lines are shown in different colours and various display parameters can be turned on and off

© Geodata Australia Plan Shaded to Show Plan Accuracies

© Geodata Australia The Outcome  A complete parcel network;  A correct cadastral dataset;  Co-ordinate precision  The cadastral base layer for GIS

© Geodata Australia Zoom Window of DCDB (Blue) Overlaid on NCDB (Red)

© Geodata Australia Differences between NCDB and DCDB Gross error here of 101.6m but typically in this dataset the errors are circa 8 metres

© Geodata Australia Benefits of an NCDB 1.Complete, correct and precise position based cadastre 2.One common cadastre for all users 3.Elimination of duplication 4.Reduced delays for update 5.Provisional layer for planning purposes is possible 6.Unification of GIS with GPS 7.Interchangeable datasets between users 8.Reduction in labour intensive GIS conversions

© Geodata Australia Alternative – Gradual Upgrade  The cost of re-building a cadastre to NCDB standards from scratch is often greater than Councils are prepared and able to meet.  Geodata is able to assist in the alternative process of gradual upgrade to numeric standards

© Geodata Australia Progressive Upgrade  Using the existing DCDB as a base, accurate cadastral data can be prepared using GeoCadastre and inserted into the DCDB.  The DCDB for an area is first brought into GeoCadastre through GeoSurvey.  The following is the Gloucester DCDB on which Geodata is currently working

© Geodata Australia Area 5 within the DCDB

© Geodata Australia Progressive Upgrade  Area 5 comprises some parcels for which reasonable plans are available but the balance is an area comprising old system titles where reasonable survey data is not immediately available  Area 5 is exported from MapInfo (the format the DCDB was received in) but could as easily done from ArcMap for import to GeoSurvey

© Geodata Australia Area 5 Export from MapInfo (or ESRI ArcMap)

© Geodata Australia Converting Strings to Parcels in GeoSurvey Inversing the DCDB parcels

© Geodata Australia Area 5 in GeoCadastre The DCDB Converted to GeoCadastre format

© Geodata Australia Adjustment of Area 5 Control is applied and the cadastre adjusted without any attempt to improve accuracy

© Geodata Australia Accurate data to be appended Cadastral data recorded in GeoCadast re from survey plans

© Geodata Australia Unjoining parcels ready for appending Parcels comprising the accurate data are unjoined from the DCDB dataset

© Geodata Australia Appending accurate data The survey accurate GeoCadast re dataset is appended and joined to the DCDB

© Geodata Australia Accurate data joined with digitised DCDB

© Geodata Australia Whole Dataset Shaded to Show Relative Accuracy (Age of Plans) Weighting of data in the adjustment process is reflected in age of plans. Digitized DCDB is Orange

© Geodata Australia Progressive Upgrade  It can be seen from the last group of slides how a progressive update of cadastral data can be achieved using Geodata software and process  The process can be dictated and controlled by Council to it’s own timetable and requirements  Relatively unskilled (in Survey of GIS disciplines) personnel can be used for this process

© Geodata Australia Progressive Upgrade  To enable a Council to proceed immediately with a progressive update of it’s cadastre it would need to purchase at least one seat each of GeoCadastre and GeoSurvey  The cost of GeoCadastre and GeoSurvey is $3,750 each per seat plus annual maintenance (optional) of $500 each which carries with it free technical support and upgrades.  Discounts are available for multiple purchases.

© Geodata Australia Progressive Upgrade  Geodata is also able to offer consultancy services on cadastral upgrade and management  Consultancy services are available from Geodata at negotiated per diem rates

© Geodata Australia Inquiries:  Roger Lee Address: P.O. Box 574 East Maitland N.S.W   Tel:  Fax:  Mobile: