Fire and Explosion Hazard Management UK Offshore model

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

Accident and Incident Investigation
A Joint Code of Practice Objectives and Summary Presentation
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Health and Safety Chapter 10.
[Organisation’s Title] Environmental Management System
PROCESS SAFETY DAY OCTOBER 28th 2014
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
October In May 2000, Walkerton’s drinking water system became contaminated with deadly bacteria, primarily Escherichia coli O157:H7.1 Seven people.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Health and Safety - an update Ian Gillett Safety Director.
COBIT - II.
Human factors Training & Competence CaspianExplorer.com.
The Australian/New Zealand Standard on Risk Management
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Workplace Safety and Health Program
Developing a Chemical Risk Management Program
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Safety and Health Programs
WHS Management Plans.
SMS Implications for Education Jim Dow Chief, Flight Training & Examinations Transport Canada Presentation to National Training Aircraft Symposium
Process Safety Management
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
Control environment and control activities. Day II Session III and IV.
OH&S Management System
1 CHCOHS312A Follow safety procedures for direct care work.
Effectively applying ISO9001:2000 clauses 5 and 8
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Central Piedmont Community College Internal Audit.
Ship Recycling Facility Management System IMO Guideline A.962
Process Safety Management
Occupational Health and Safety
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Roles and Responsibilities
Barriers in Improving HSE Culture
Health and Safety Policy
Unit 6 Personnel Roles and Responsibilities & Safety Program Development and Management Chapter 9 and 10.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Hazards Identification and Risk Assessment
Bratislava april Preparation of an inspection plan: The Dutch approach Theo de Gelder Senior Inspector Regional Inspectorate South-West Dutch Ministry.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Safety Culture and Empowering Safety Robby Jones, Supervisor NC Department of Labor, OSHA.
A guide to... Safe Systems of Work.
Kathy Corbiere Service Delivery and Performance Commission
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
OHSAS Occupational health and safety management system.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.

Pipeline Safety Management Systems
Measuring and Reviewing Performance
The health and safety at work Act - a new way of thinking
Health and Safety Policy
Monitoring, Review and Audit of OHS&E
HSE Case: Risk Based Approach.
Asset Governance – Integrated Strategic Asset Management
Health and Safety! By jack Hughes.
Adding Value Across the Board
ISO management systems
Presentation transcript:

Fire and Explosion Hazard Management UK Offshore model Presentation to the Dutch Seveso Inspectorate by Graham Dalzell (TBS)3

Risk Management Model :ISO 18001 Policy Review Planning Leadership Understanding Communication Monitor Implement (TBS)3

Leadership = Attitude Careful, courageous or reckless Investing or cost cutting Short term profit or long term stability and security Keeping going or prepared to stop No room for error Managing rules and compliance or managing hazards. Appeasing the regulator or matching their requirements to your own aims Understanding or ignorance Owning hazards and risks – or employing consultants Reactive audit culture or proactive hazard management

Is it Safe? Society demands the answer: Yes Is this what the managers of your major hazard sites ask?

We do risk assessments and we make recommendations, and we implement them, so the risk has gone away, hasn’t it? Should we just deliver recommendations or Should we deliver risk and hazard knowledge

The Good News Culture LESSONS FROM LONGFORD The Esso Gas Plant Explosion Professor Andrew Hopkins Australian National University ISBN 1-86468-422-4

Hazard Understanding How can we manage if we don’t understand? We will all know what is dangerous, why it is dangerous and what each of us must do to keep us all safe. How can we manage if we don’t understand? (TBS)3

Most common comments during accident investigations No-one told me that could happen I didn’t know that was important I didn’t know it would be like that

So what’s this and what caused it?

Who are WE? Everyone who manages a company, operation, design department or contract. Everyone who operates, maintains, inspects or audits a plant Everyone who designs a facility, process, assembly or component Everyone who supports design and operation. (TBS)3

Director Manager Supervisor Individual Operations Maintenance Engineering Contracts Design SLIDE 7 STRUCTURED DIAGONAL SLICE: The earlier referenced work in the ISM gave clear responsibilities at each level of an organisation. This is crucial for this process. It argues that there are at least four distinct levels within an organisation, The role and responsibilities at each level are different. It is argued that they manage the following aspects of hazard and risk: Corporate, - setting the overall corporate risk levels and managing the total exposure - corporate risk management Divisional, - managing their business within the allocated fraction of the corporate risk target – business and facility risk management – ensuring that there is sufficient resource to support hazard management in the facility and setting the clear operational limits of intolerability. Plant/Facility –managing hazards; i.e. ensuring that sufficient critical elements are in place and effective to manage the hazards at the time Individual/Element or Task. – managing the individual elements; people, plant or processes so that they are available and effective. The diagonal slice would probe how the performance and effectiveness of specific attributes at each level, bearing in mind the different roles that they play in the hazards and risk management process. The diagonal slice would not only examine the parts of the organisation with direct responsibility but would look across other critical support functions such as engineering, contracts, procurement which have an indirect but important role.

Communication :We have a finite capacity for information in our memory in an aide memoir accessible as a detailed reference But do our risk analyses look like this?

Distilling the information: Who needs to know what Senior management Corporate risk levels; patterns of risk by business type and location; future risks; the underlying risk drivers Business and regional managers Facility risk levels; patterns of risk by facility hazard and personnel; demands on business processes and others Plant and project managers Facility hazards, their relative risks and characteristics; hazard strategy; critical measures; operating limits Operators, technicians and designers Hazard characteristics, why measures critical are critical, performance standards and limitations

Operators, technicians Assigning the responsibilities: Who carries the can – and who says stop? Senior management Setting the tolerable risk levels and deciding how close to operate; providing the resources to reduce risk Business and regional managers Operating within corporate risk levels; providing the supporting infrastructure; Deciding how risks should be managed Plant and project managers Operating the plant within its limits; managing the hazards and activities; ensuring critical measures are suitable Operators, technicians and designers Comply with procedures; maintain their competence and the plant to the performance standards

Developing the knowledge Corporate Risk Level Regional/business Risk profile Regional/business Risk profile Regional/business Risk profile Facilities Analysis Hazard Registers Hazard Registers Hazard Registers Facilities Analysis Facilities Analysis Critical Measures Critical Measures Performance stds Performance stds

Policies must be structured and integrated: Policy: - What do we want?: Policies must be structured and integrated: Level 1 – Leadership, accountability and tolerable risk levels Level 2 – Risk management, resourcing, and relationships Level 3 – Processes; design, operations, maintenance, contracts Level 4 – Competencies, procedures, operating limits and plant (TBS)3

Typical Corporate HSE management system Design and Construction Leadership and Accountability Community and Stakeholder Awareness Operations and Maintenance Risk Assessment And Management Crisis and Emergency Management Management Of Change People Behaviours and Competence Incident Analysis and Prevention Information and Documentation Working with Contractors and others Assessment Assurance and Improvement Customers and Products

HSEMS Default set of rules? Discrete and unrelated elements? Audit and compliance culture? Different owners? No coordination? Generic requirements rather than matching hazards No risk based investment and infrastructure? Importance based on perception not risk Cyclical emphasis on elements and hazards?

A SAFETY CASE IS NOT A HAZARD AND RISK MANAGEMENT SYSTEM But many companies think that it is

Typical Corporate HSE management system Leadership and Accountability People Behaviours and Competence Operations and Maintenance Design and Construction Information and Documentation Crisis and Emergency Management Risk Assessment And Management Community and Stakeholder Awareness Incident Analysis and Prevention Working with Contractors and others Assessment Assurance and Improvement Customers And Products Management of Change

Bringing all the parts of hazard management together Inputs WHAT WE CAN EXPECT FROM THE COMPANY Minimum default standards for people and plant Actual condition and provision History and knowledge Outputs WHAT THE RISK ASSESSMENT SHOULD DELIVER Hazard an risk knowledge Extra requirements above the default provision Critical plant, processes and procedures What have we got, what do we need, what can we provide, how do we live with it?

Planning:- What do we need to do? Understand the hazards Reduce risks at source Decide how, what and who we need to manage the hazards Set performance standards and operating limits Evaluate the risks Identify the improvements Determine the resources needed to implement hazard management (TBS)3

Cause Severity Consequence Escalation HAZID HAZARD UNDERSTANDING Cause Severity Consequence Escalation RISK ELIMINATE MINIMISE at SOURCE STRATEGY PREVENT CONTROL MITIGATE EVACUATE SYSTEM PASSIVE ACTIVE OPERATIONS EXTERNAL STANDARDS ROLE and SUCCESS RATE IS IT GOOD ENOUGH? NO: - IMPROVE or CHANGE YES: PROCEED COMMUNICATE

Design out people – the make mistakes and they die. ELIMINATE Inherently safer design and operation Designing out hazards – simpler plant Eliminating or minimising causes Reducing the severity pressure, inventory, hole size) Reducing consequence – fewer people, better layout, lower overpressures Design out people – the make mistakes and they die.

STRATEGY What is the “design case” Is it practical to contain the effects? Rigorous source, consequence and escalation analysis – effective control and mitigation Is it practical to make sure that extreme events do not occur Rigorous causation analysis and effective prevention

SYSTEMS Passive – no moving parts –highly reliable Active –breaks down and requires maintenance and intervention – predictable reliability Operational – needs competent people and judgement – subject to error External – relying on others outside your control – needs clear definition of expectations

Performance standards Active Functionality, Availability, Reliability, Survivability Passive Functionality, Inspection Frequency, Survivability Operational Numbers, Role, Competence , Availability External Duty, Availability, Resource

the judgement of adequacy? Risk Assessment: Is it good enough? How do we manage the judgement of adequacy?

UKOOA Risk based decision making framework Extreme consequence uncertain hazards Societal Values Company Values Well understood risk specific major accident hazards QRA Qualitative Risk Assessment Engineering Judgement Well understood lower risk hazards Good Practice Codes and Standards

“As Low as Reasonably Practical”

Implementation:- Making it work Share the hazard and risk knowledge Establish the business processes Assign the responsibilities Provide the resources Embed or confirm the requirements: - procedures, competencies, performance standards Implement the improvements (TBS)3

The Reality – Badly Maintained? SLIDE 15: THE REALITY – BADLY MAINTAINED (Poor Implementation) This shows the condition and effectiveness of pressure monitoring on a HP gas line and severe metal loss on the main piping.

The Reality – Badly Operated? SLIDE 16 THE REALITY – BADLY OPERATED: ( Poor implementation) This slide shows open sampling of a highly gaseous oil stream into a plastic bottle. It is indicative of long established bad practices.

Monitoring:- Is it working? Advanced safety auditing (ASA) - Confirm hazard understanding - Is the process complete and is it working? Competence assurance Adequacy and compliance with procedures Plant integrity verification Adequacy of resources (TBS)3

Review:- How and where do we improve? 4 levels of improvement (TBS)3 Strategic corporate risk reduction - business rationalisation/closure Infrastructure and resource enhancement, facility improvement Hazard management improvement; - strategy, system selection Performance improvement - people, plant, procedures (TBS)3

Proactive Hazard Management not Retrospective Risk Assessment (TBS)3