Overview of Key Rule Features

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

Elements of an Effective Safety and Health Program
Museum Presentation Intermuseum Conservation Association.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
PROJECT RISK MANAGEMENT
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Managing Safety and Health, Overview Ron Hopkins, CFPS, CFEI TRACE Fire Protection and Safety Consultants. Ltd. Richmond, Kentucky.
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
Safety and Health Programs
What is Program Management?
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
SAFETY AND HEALTH PROGRAMS 1. This presentation is adapted from the OSHA Safety and Health Programs presentation available on the OSHA website. CREDITS.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Integrity Management Inspection Process Don Moore, OPS Central Region.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Unit #4 Establishing Committee Expectations – Safety & Health Programs 1.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
Safety and Health Programs 1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale and productivity.
OSHAX.org - The Unofficial Guide To the OSHA1. Benefits of Effective Safety and Health Programs Reduce work related injuries and illnesses Improve morale.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Characterization, Inventory and Monitoring of trends in indigenous livestock Dr. E. D. Ilatsia D. N. Kamiti 23-Oct-15Animal Breeding and Genomics Group1.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Enbridge SCC Management Program SCC Workshop Houston - December 2, 2003 Walter Kresic Enbridge Pipelines Inc. SCC Workshop Houston - December 2, 2003 Walter.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Development of IM Inspection Process Workshop on the Integrity Management Rule for Large Liquid Pipelines Bruce Hansen August 7, 2001.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Regulatory Initiatives.
Distribution Integrity Management Program
Enforcement of Integrity Management Rule Workshop on the Integrity Management Rule for Large Liquid Pipelines Chris Hoidal, Director OPS Western Region.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
OHSAS Occupational health and safety management system.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Risks and Hazards to Consider Unit 3. Visual 3.1 Unit 3 Overview This unit describes:  The importance of identifying and analyzing possible hazards that.

Pipeline Safety Management Systems
People and Culture Office Safety, Health and Wellbeing
Utility Technologies International
People and Culture Office Safety, Health and Wellbeing
Distribution Integrity
Elements of an Effective Safety and Health Program
Elements of an Effective Safety and Health Program
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Overview of Key Rule Features Pipeline Integrity Management in High Consequence Areas for Hazardous Liquid Operators Overview of Key Rule Features Workshop on the Integrity Management Rule for Large Liquid Pipelines Skip Brown August 7, 2001

Integrity Management Rule Objectives Accelerate Assessments of Lines in High Consequence Areas (HCAs) Improve Company Integrity Management Systems Improve Government Role in Reviewing Integrity Plans and Programs Increase Public Assurance in Pipeline Safety

To Whom Does this Rule Apply? Hazardous Liquid Operators who Own or Operate 500 or More Miles of Pipeline Facilities that are Jurisdictional to Part 195

What are HCAs for Hazardous Liquid Pipelines? Unusually Sensitive Areas of Environment (see Part 195.6) High Population Areas and Other Populated Areas Commercially Navigable Waterways

What must an Integrity Management (IM) Program include? Identification of Segments that Could Affect HCAs (12/31/01) Baseline Assessment Plan (3/31/02) Framework for Implementing IM Program Elements (3/31/02)

What IM Program Elements are Required by the Rule? Identifying Segments that Could Impact HCAs Conducting Periodic Integrity Assessments Reviewing Assessment Results by Qualified Personnel Making Mitigation and Repair Decisions

What IM Program Elements Are Required by the Rule? Integrating and Analyzing Risk Information Identifying and Evaluating Additional Risk Controls Measuring Program Performance H M Consequences L L M H Likelihood of Occurrence Highest Risk Lowest

What Should be in an IM Framework? Address All IM Program Elements Defined in Rule Describe Current Processes Lay Out Plan for IM Program Element Improvements

Segment Identification Obtain HCA Maps Determine Segment Boundaries where Spill Could Affect HCA Consider Local Factors such as Topography Consider System Design and Operation Characteristics Utilize Field Knowledge of Local Conditions Document Analysis and Key Assumptions

What Should be in the Baseline Assessment Plan? For each segment: Assessment Method(s) In-line Inspection Tool(s) Corrosion Deformation Pressure Testing Other Technology – OPS Notification Required Assessment Provisions Apply Only to Line Pipe

What Should be in the Baseline Assessment Plan? For each segment: Schedule identifying when segments will be assessed Basis for assessment method and schedule Assessments after 1/1/96 can be used for baseline 50% of mileage completed by 9/30/04 All segments by 3/31/08 Highest risk segments assessed first

Keeping the Baseline Assessment Plan Up-to-Date Reflect Insights from: Integrity Assessments Risk Analysis Operating Experience Apply New Technology Address Newly Identified HCAs Document and Retain the Basis for Plan Changes

Prioritizing Segments for Assessment Scheduling Use Existing Assessment Results Consider Segment-specific Risk Factors that Affect Likelihood and Consequences Documentation: Approach and Key Assumptions Segment-specific Integrity Threats Relative Rankings of Segments

Implementing the Assessment Plan Perform Assessments Integrate Results with Other Information Prepare Excavation and Repair Schedule Take Appropriate Mitigation Measures

Implementing the Assessment Plan Integrate Information into Future Risk Analysis Determine Timing and Method for Next Assessment Interval  5 Years Update Assessment Plan

Integrating Data Integrity Assessment Results Evaluation Common reference system Comparisons and analysis Risk Assessment Includes integrity assessment results Comprehensive Investigative

Evaluate Need for Additional Protection Update Risk Analysis Identify Additional Risk Control Opportunities Controls Aimed at Segment’s Highest Risks Leak Detection System Enhancements Emergency Flow Restricting Devices Evaluate Risk Reduction Document Bases for Management Decisions

Evaluating Program Performance Critical Self-examination Integrity Assessment Tools and Practices Management Systems Root Cause Analysis of Near Misses and Failures Performance Measures Feedback and Continuous Improvement

Rule Requires Operators to Notify OPS if They: Use a Technology other than Pigging or Pressure Testing Are Unable to Meet Repair Schedule Requirements, and Cannot Reduce Pressure Establish an Assessment Interval Greater than 5 Years

Integrity Management Program Documentation Baseline Assessment Plan and Revisions IM Framework Documentation of Processes for Each Program Element IM Program Performance Evaluation Findings and Performance Measures

Integrity Management Program Documentation Integrity Assessment Results Excavation and Repair Schedules Repair and Mitigation Records Records of Additional Preventive and Mitigative Actions Taken to Protect HCAs

Integrity Management Program Documentation Risk Assessment Results Evaluation of: Leak Detection System Capability Need for Emergency Flow Restricting Devices Justification for: Use of Other Assessment Methods Extending Assessment Interval beyond 5 Years Inability to Meet Repair Schedule Requirements

Summary Comments Assessment Requirements will Improve Understanding of Pipe Condition in HCAs Improvement in IM Systems is Key to Compliance with New Rule Information Integration and Risk Analysis are Critical Program Elements Improved Performance Results from a Commitment to Continuous Improvement