1 ERCOT LRS Precision Analysis PWG Presentation June 28, 2006.

Slides:



Advertisements
Similar presentations
Feedback of Amplifier Circuits I
Advertisements

Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
ERCOT Analysis of 2005 Residential Annual Validation Using the Customer Survey Results ERCOT Load Profiling Presented to PWG - October 26, 2005.
Example 6.1 Capital Budgeting Models | 6.3 | 6.4 | 6.5 | 6.6 | Background Information n The Tatham Company is considering seven.
Engineering Economic Analysis Canadian Edition
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Oil & Gas Preliminary Sample Analysis March 30, 2006.
Importance Sampling. What is Importance Sampling ? A simulation technique Used when we are interested in rare events Examples: Bit Error Rate on a channel,
Understanding the Accuracy of Assembly Variation Analysis Methods ADCATS 2000 Robert Cvetko June 2000.
ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
MAE 552 Heuristic Optimization
Comparison of Average Daily Profiles for Primary vs Secondary Service Business Customers presented by ERCOT Load Profiling for the PWG Meeting of July.
Presented to the PWG Meeting of May 26, 2010
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
STAT 4060 Design and Analysis of Surveys Exam: 60% Mid Test: 20% Mini Project: 10% Continuous assessment: 10%
1 Marketing Research Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides.
Determining the Size of a Sample
Determining the Size of
Aim: How do we find confidence interval? HW#9: complete question on last slide on loose leaf (DO NOT ME THE HW IT WILL NOT BE ACCEPTED)
Analysis of Monte Carlo Integration Fall 2012 By Yaohang Li, Ph.D.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Data Mining Practical Machine Learning Tools and Techniques Slides for Chapter 5 of Data Mining by I. H. Witten, E. Frank and M. A. Hall 報告人:黃子齊
Minimal Test Collections for Retrieval Evaluation B. Carterette, J. Allan, R. Sitaraman University of Massachusetts Amherst SIGIR2006.
Three Decimals for Profile Resolution. 2 Pro Case for Three Decimals for Profile Resolution  Generation 15 minute pattern rarely has 2 adjacent equal.
Chap 9 Estimating Volatility : Consolidated Approach.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
Residential Survey. Survey Objectives Develop a more accurate algorithm to predict the presence and use of electric heat for residential customers. Algorithm.
1 Update from ERCOT Retail Market Services to RMS Additional Material February 12, 2004.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Module 1: Statistical Issues in Micro simulation Paul Sousa.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
Engineering Economic Analysis Canadian Edition
1 ERCOT LRS Detail Sample Design PWG Presentation April 24, 2007.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical Specialist.
1 MARKETING RESEARCH Week 5 Session A IBMS Term 2,
April 15, 2003 UFE 2002 ANALYSIS. April 15, 2003 LOAD AND UFE – ERCOT PEAK 2002 This is a graphic depiction of load and UFE on the ERCOT Peak Day for.
1 ERCOT LRS Precision Analysis PWG Presentation February 27, 2007.
Is the Continual Reassessment Method Superior to the Standard “3+3” dose escalation scheme? Alexia Iasonos 1 Elyn R. Riedel 1, David.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
1 Follow Up Analysis of 2 vs. 3 Decimals ERCOT Load Profiling Department June 26, 2007.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 UFE Workshop Sponsored by COPS October 19, 2004.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
Comparison of New Load Profile Models 14-Month Models vs 21-Month Models ERCOT Load Profiling Staff.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
1 ERCOT LRS Sample Design Review PWG Presentation March 27, 2007.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
Analysis of the ERCOT IDR Threshold Requirement Presented by Bill Boswell PWG Meeting May 27, 2009.
1 Impact of Sample Estimate Rounding on Accuracy ERCOT Load Profiling Department May 22, 2007.
Uncertainty2 Types of Uncertainties Random Uncertainties: result from the randomness of measuring instruments. They can be dealt with by making repeated.
ERCOT Staff Analysis of Model Treatment of Holidays.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Chapter 9: Introduction to the t statistic. The t Statistic The t statistic allows researchers to use sample data to test hypotheses about an unknown.
Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
Chapter 8: Confidence Intervals for One Population Mean 8.3 Margin of Error.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 A Review of Impacts to UFE and Load Ratio Share Based on AV Profile ID Changes Presented by ERCOT Staff to the Profiling Working Group 10/26/2005.
Data Mining Practical Machine Learning Tools and Techniques By I. H. Witten, E. Frank and M. A. Hall Chapter 5: Credibility: Evaluating What’s Been Learned.
Marketing Research Aaker, Kumar, Day and Leone Tenth Edition Instructor’s Presentation Slides 1.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Sample Size and Accuracy
Estimating Volatility : Consolidated Approach
Presentation transcript:

1 ERCOT LRS Precision Analysis PWG Presentation June 28, 2006

2 Options for Determining Round Two Sample Size Increases Option 1: –Determine minimum sample size increase needed to obtain ±10% Accuracy at 90% Confidence for a selected percent of intervals for the year independently for each Profile Type / Weather Zone Combination Option 2: –Determine minimum sample size increase needed to obtain ±10% Accuracy at 90% Confidence for a selected percent of intervals such that all Profile Type / Weather Zone Combinations meet the accuracy target in all selected interval Option 3: –Determine minimum sample size increase needed to obtain ±10% Accuracy at 90% Confidence for enough intervals to account for a selected percent of the MWh for each Profile Type / Weather Zone Combination Option 4: –Determine minimum sample size increase needed to obtain ±10% Accuracy at 90% Confidence for enough intervals to account for a selected percent of the dollars (ΣMWh * MCPE) for each Profile Type / Weather Zone Combination Option 5: –Iteratively allocate increments of 10 sample points to the Profile Type / Weather Zone Combination which produces the most gain in terms of reducing MWh estimation error Option 6: –Iteratively allocate increments of 10 sample points to the Profile Type / Weather Zone Combination which produces the most gain in terms of reducing Dollar estimation error

3 Option 1 To obtain ±10% Accuracy at 90% Confidence By Profile Type and Weather Zone - Independent of Interval Minimum Sample Size Increase Required For example: to obtain ±10% Accuracy at 90% Confidence for 50% of the intervals for BUSHILF_COAST would require a sample size increase of 10 points

4 Option 1 To obtain ±10% Accuracy at 90% Confidence By Profile Type and Weather Zone - Independent of Interval Minimum Sample Size Increase Required

5 Option 1 To obtain ±10% Accuracy at 90% Confidence By Profile Type and Weather Zone - Independent of Interval Increase of Sample Size

6 Option 1 To obtain ±10% Accuracy at 90% Confidence By Profile Type - Independent of Interval For example: to obtain ±10% Accuracy at 90% Confidence for 50% of the intervals for all Profile Type/Weather Zone combinations would require a sample size increase of 5,358 points

7 Option 2 To obtain ±10% Accuracy at 90% Confidence for all Profile Types and Weather Zones - Within Each Interval For example: to obtain ±10% Accuracy at 90% Confidence for 50% of the intervals such that all Profile Type/Weather Zone combinations within those intervals would achieve that level of accuracy would require a sample size increase of 750 points for BUSHILF and 2,267 points for BUSMEDLF

8 Option 2 To obtain ±10% Accuracy at 90% Confidence for all Profile Types and Weather Zones - Within Each Interval For example: to obtain ±10% Accuracy at 90% Confidence for 50% of the intervals such that all Profile Type/Weather Zone combinations within those intervals would achieve that level of accuracy would require a sample size increase of 5,703 points for BUSLOLF and 7,047 points for BUSNODEM

9 Option 2 To obtain ±10% Accuracy at 90% Confidence for all Profile Types and Weather Zones - Within Each Interval

10 Option 2 To obtain ±10% Accuracy at 90% Confidence for all Profile Types - Within Each Interval For example: to obtain ±10% Accuracy at 90% Confidence for 1% of the intervals such that all Profile Type/Weather Zone combinations within those intervals would require a sample size increase of 7,749 points

11 Option 3 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the MWH within Each Profile Type and Weather Zone For example: to obtain ±10% Accuracy at 90% Confidence for intervals accounting for 50% of the BUSMEDLF MWh would require a sample size increase of 170 points

12 Option 3 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the MWH within Each Profile Type and Weather Zone

13 Option 3 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the MWH within Each Profile Type and Weather Zone

14 Option 3 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the MWH within Each Profile Type Continues on next slide For example: to obtain ±10% Accuracy at 90% Confidence for intervals accounting for 50% of the MWh for each of the Profile Type / Weather Zone combinations would require a sample size increase of 4,322 points

15 Option 3 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the MWH within Each Profile Type

16 Option 4 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the dollars within each Profile Type & Weather Zone Note: Dollars = Σ (MWh * MCPE)

17 Option 4 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the dollars within each Profile Type & Weather Zone

18 Option 4 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the dollars within each Profile Type & Weather Zone

19 Option 4 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the dollars within each Profile Type Continues on next slide For example: to obtain ±10% Accuracy at 90% Confidence for intervals accounting for 50% of the Dollars for each of the Profile Type / Weather Zone combinations would require a sample size increase of 3,673 points

20 Option 4 To obtain ±10% Accuracy at 90% Confidence for Intervals Accounting for Selected Percents of the dollars within each Profile Type

21 Precision vs Sample Size Increasing sample size has a diminishing return on precision improvement Error Ratio (thus Precision improvement) varies across Profile Types / Weather Zones and across intervals Thus the impact of adding sample points varies by Profile Type and Weather Zone

22 Class Level MWH & Dollars Not all Profile Type / Weather Zone Combinations are created equal in either MWh or Total Dollars (ΣMWh * MCPE) !

23 Class Level MWH & Dollars Not all Profile Type / Weather Zone Combinations are created equal in either MWh or Total Dollars (ΣMWh * MCPE) !

24 Class Level MWH & Dollars Not all Profile Type / Weather Zone Combinations are created equal in either MWh or Total Dollars (ΣMWh * MCPE) !

25 Class Level MWH & Dollars Totals from previous three slides. Is accuracy more important for RESLOWR (41% of Dollars) than for BUSNODEM (2.1% of Dollars)?

26 Class Level MWH & Dollars - Descending Order by Dollars * Note: Dollars = Σ (MWh * MCPE) Continues on next slide Top 4 classes account for 49% of the MWh and 51% of the dollars

27 Class Level MWH & Dollars - Descending Order by Dollars * Dollars = Annual MWh * MCPE Continues on next slide

28 Class Level MWH & Dollars - Descending Order by Dollars * Dollars = Annual MWh * MCPE Continues on next slide

29 Options 5 & 6 These options iteratively allocate increments of 10 sample points to the next Profile Type / Weather Zone Combination in order to produce the most gain in –reducing MWh (Option 5) estimation error (Precision × MWh) summed across all intervals –reducing Dollar (option 6) estimation error (Precision × Dollars) summed across all intervals The allocations are based on –The MWh (or Dollars) associated with each of the Profile Type / Weather Zone combinations in each interval –The Error ratio in each interval for each Profile Type / Weather Zone combination –The cumulative number of sample points allocated by preceding iterations (including the original sample size) –The precision improvement that would be realized by adding 10 sample points, and the diminishing return on that improvement

30 Option 5 – MWh Error Reduction Optimization Cumulative sample sizes are shown in increments of 1,000; they were determined iteratively in increments of 10 sample points as additions to the current sample size.

31 Option 6 – Dollar Error Reduction Optimization

32 Option 5 with Collapsed Profiles/Weather Zones Collapse classes to reduce the number for which the few or no additional sample points are required. BUSNODEM would no additional points.

33 Option 6 with Collapsed Profiles/Weather Zones

34 Conclusions and Follow-up Analysis The iterative sample point allocation process has some intuitive appeal –Seems to allocate sample points where they do the most good –Maximizes UFE reduction However, –How does UFE allocation affect the final accuracy? –If the iterative allocation process is used, will we end up with more or less accurate estimates when they are adjusted for UFE? –ERCOT will try some Monte Carlo simulations to explore this question