Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected.

Slides:



Advertisements
Similar presentations
André Augustinus 22 June 2004 DCS Workshop Status on services controls.
Advertisements

Air and Water Chiller Basic Class
Mario Bätz CERN ST-MO-TC ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPM Gestion Technique dune Panne Majeure.
Training Presentation
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Daikin Altherma™ Troubling Shooting
André Augustinus 16 June 2003 DCS Workshop Safety.
38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Engineer Presentation
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Beckhoff Building Automation New Automation Technology HVAC-Library Exercise Air Conditioning System.
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Air condition installation
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Refer to Service Manual for details Fault codes. To retrieve fault codes from the remote controller Press the ‘CHECK’ button for approximately.
Update on the PSB Cooling and Ventilation Systems
Session 1: Major Events in 2006
1 ) Infrastructure consolidation (TS/FM and TS/CE groups)
Situation of the Static Var Compensators at CERN.
- Condensate pump and feed pump trip!
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
7. Test operation.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
EN-CV interventions during EYETS for PS and PSB
Pixel Cooling System Modifications
ATLAS Thermosiphon Electrical Distribution and Run Modes
Severe Weather Weather describes the conditions in the atmosphere in an area over a short period of time. Weather that is extreme and outside of normal.
Power cut 18kV cable for EMD404/E9 is heating
Fault codes.
- Condensate pump and feed pump trip!
FBE03: Building Construction & Science
November technical stop activities:
LHC Morning Meeting - G. Arduini
Operation of Target Safety System (TSS)
Mikael Olsson Control Engineer
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

Operation TCR 2 nd of July to 10 th of September 2001 More than 20 major events Events grouped by equipment group and zone affected

Electrical events z19/08 18:42: Electrical disturbance of 400 kV EDF due to storm, main PS magnet tripped. No electrical equipment switched off. y19:15 PS running again z19/08 21:08: Compensator 1 BE tripped due to storm. SPS and PS stopped. y21:21 PS running again y21:40 Meyrin filters fall out. PS still ok y22:14 Compensator in BE ok, SPS running y22:29 Meyrin filters ok z20/08 00:34: Compensator 1 BE tripped due to storm. PS and SPS stopped y1:30 PS and SPS running again Niels Schionneman ST/MO/TCR

Electrical events z20/8 06:48 Short circuit in transformer EHT3 BE yTransfo was idling but the short circuit caused an unbalance in the network and made the compensators trip. yDemi water off Prevessin and Meyrin yPS and SPS stopped xElectrical problem solved at 7:20 xCooling PS ok at 9:20 xCooling SPS ok at 10:20 Niels Schionneman ST/MO/TCR

Electrical events z29/8 18:47 Explosion in 18kV breaker sub- station 7 y7 18kV breakers in the PS loop trip yThe 66kV supply for the transfo SEH1 tripped. Meyrin off tension yAuto transfer switched to EOS after 5 sec xThe 18kV trips due to malfunction of protection equipment/selectivity problem yPS and SPS stopped for 24h Niels Schionneman ST/MO/TCR

CV events concerning PS z3/7 14:20 Water leak alarm in PS yDemanded access but found no leak. Drains were blocked and condense water from air condition caused the water level to raise y15:33 PS running again z4/7 21:43 Cooling problem in 361 yMCR can not switch on main magnet due to high temperature in 361 yVentilator in cooling tower not running on max speed y23:43 PS running again Niels Schionneman ST/MO/TCR

CV events concerning PS z15/7 9:01 PS demi water stopped yA UPS supplying the PLCs for the demi water stations had tripped due to water infiltration yUPS bypassed and PLCs and water stations started y11:25 PS running again z19/8 2:43 and 7:19 Demi water station 359 stopped. PS stopped yStation stopped twice due to heavy storms. Started station manually y3:05 and 7:39 Cooling ok Niels Schionneman ST/MO/TCR

CV events concerning PS y20/8 19:00 Demi water for TT2 stopped xNo beam for SPS xNo alarms received in TCR xMagnet in TT2 supplied from TOF line. To be changed x20:20 Cooling station in 378 started again y23/8 20:15 Demi water temperature too high in East area xPumping station running on max xPrimary water temperature at 25 degrees due to very warm weather. xInforming MCR. Situation unchanged all night Niels Schionneman ST/MO/TCR

CV events concerning PS y25/8 15:10 Pump in cooling circuit for ISOLDE exploded xISOLDE stopped xNo fluid alarms in TCR, only electrical alarm xIsolated pump and started spare pump x15:40 Cooling ok Niels Schionneman ST/MO/TCR

CV events concerning SPS y6/7 17:45 Temperature interlock on main magnet in BA3. SPS stopped xSupply valve closed on primary side of heat exchanger x19:38 SPS running again y9/7 11:45 Temperature interlock on septum magnet in BA6. SPS stopped xPump stopped by faulty pressure sensor x12:30 SPS running again y27/7 10:25 BA6 cooling off. SPS stopped xCV working on PLC for BA6 cooling. A faulty Siemens module caused the station to stop x10:55 SPS running again Niels Schionneman ST/MO/TCR

CV events concerning SPS y2/8 14:27 Demi water BA81 stopped due to water leak. No beam for North area xAccess to machine given but leak is not found xManages to start pumps and refill continuously x15:39 North area beam back on y5/8 Compensator tripped due to missing cooling in BA3. SPS Stopped xNo alarms in TCR xCooling stopped due to problem with the PLC x19:40 SPS running again y10/8 20:40 Same problem as above x21:30 SPS running again Niels Schionneman ST/MO/TCR

CV events concerning SPS y27/8 4:20 Cooling for septum magnet BA2 stopped. SPS stopped xNo alarms in the TCR. Pump restarted from TCR x4:22 SPS running again Niels Schionneman ST/MO/TCR

CV events concerning SPS y2/9 4:31 + 3/9 4:56 Demi water BA3 stopped. No alarms in TCR xProblem seen when compensator in BB3 tripped xSPS stopped for 1h each time xCooling stopped due to error in PLC y3/9 23:59 Demi water for CAV2+RF1 BB3 stopped xSPS stopped for 3.5h xCooling stopped due to electrical problem on pump for CAV2 circuit. Pumps started in forced mode. Niels Schionneman ST/MO/TCR

Various events y14/7-15/7 RTserver crashes several times xDifferent zones at Meyrin without supervision for various periods. xFire brigade instructed to do rounds and keep a close eye on the synoptic. x16/7 Bugs found and fixed by IN. Situation back to normal. y27/8 3:55 Vacuum sector valve closed TS1 and TS2. SPS stopped. x4:00 Valve in TS1 opened. OK for SPS x4:10 Valve in TS2 closes x4:12 Valve in TS2 opened. OK for SPS Niels Schionneman ST/MO/TCR