Optical Diagnostics T. Tsang BNL (Aug. 4, 2006). Optical Diagnostics tight environment high radiation area non-serviceable area passive components optics.

Slides:



Advertisements
Similar presentations
We are now working with 2 microscope: 1st Microscope Official setup: MICOS stage NIkON optics and illuminator DALSA camera cad-4 Recently several hardware.
Advertisements

Mock-Up Test For Optical Diagnostics MERIT VRVS Meeting April 12 th, 2006 By Thomas Tsang (BNL), Hee Jin Park (SUNY at Stony Brook) Thanks to Bill Sands.
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Design and Experimental Considerations for Multi-stage Laser Driven Particle Accelerator at 1μm Driving Wavelength Y.Y. Lin( 林元堯), A.C. Chiang (蔣安忠), Y.C.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Currently: 3 year ( ) NSF-supported UF/IAP collaborative project "Methods and Instruments for High-Precision Characterization of LIGO Optical Components"
Optical Diagnostics on Mock-up/SS Primary home-made mini-choppers Laser light Viewport #1Viewport #2Viewport #3Viewport #4 identification on window exterior.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Optical Diagnostics Hg_jet_meeting, Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no.
Optical Diagnostics T. Tsang, BNL, March 17, 2006 tight environment high radiation area non-serviceable area passive components optics only, no active.
Viewport 1, Sep. 19, 2007Viewport 1, Sep. 5, 2007 Temperature (ºC) on HPU display Primary : 77 Secondary : 30.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
Optical Diagnostics Thomas Tsang, BNL, Oct 20, 2006 tight environment high radiation area non-serviceable area passive components optics only, no active.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
Tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit image through flexible fiber.
Tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit image through flexible fiber.
Z 7.7 meter 10 meter Optics Layout and Imaging Fiber Update, T. Tsang, BNL, 1 Feb 2006.
Two-dimensional and wide dynamic range profile monitor using OTR/fluorescence screens for diagnosing beam halo of intense proton beam Y. Hashimoto, T.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
Irradiation Studies of Optical Components CERN, ~ April 15-24, GeV proton beam 4 x proton Irradiation dose: equivalent to 40 pulses.
Z 5.7 meter 8.0 meter Optics Layout and Imaging Fiber Update, T. Tsang, BNL, 25 Jan 2006.
Fast camera capture of waterjet September 16, Princeton Camera: FastVision 13 capability 1280x1024 pixels, 500 frames/sec, 0.5 sec video or … complete.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
LSC meeting, HLO, August 18, 2004 IAP/UF/LIGO Research Collaboration: Status and Prospectives Efim Khazanov, Ilya Kozhevatov, Anatoly Malshakov, Oleg Palashov,
Liquid scintillator for an off-axis neutrino detector? (The Minnesota group) We are actively investigating a liquid scintillator option for the off-axis.
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
Upgrade plan of the MOA 1.8-m telescope F. Abe MOA collaboration 19 Jan. 2009, 13th Microlensing Paris.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
Congresso del Dipartimento di Fisica Highlights in Physics –14 October 2005, Dipartimento di Fisica, Università di Milano An application of the.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
MICROSCOPE DESIGN. beam expander and objective Why do we need a beam expander? What facts about the laser do we need to know? How much expansion do we.
Understanding mass transport in fuel cells using neutron imaging
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
Bell Work 1.What are three basic behaviors of light waves? 2.Explain how the human eye sees an object’s color? 3.What is a prism?
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Compressor Helium filled optional equivalent plane imaging laser beam dump hole in mirror for e-beam SSA and more.
Continuous meter available illumination uniformity Sumitomo imaging fibers IGN-08/30 sample 0.3-meter 30,000 pixels Cost per foot $78$158$305 Cost.
Date of download: 5/27/2016 Copyright © 2016 SPIE. All rights reserved. Rendered design of the 4M device that illustrates optical components mounted on.
Astronomical Spectroscopic Techniques. Contents 1.Optics (1): Stops, Pupils, Field Optics and Cameras 2.Basic Electromagnetics –Math –Maxwell's equations.
Date of download: 6/28/2016 The Association for Research in Vision and Ophthalmology Copyright © All rights reserved. From: A Novel, Real-Time, In.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
Update on electron spectrometer measurements Introduction Setup, measurements carried out Some raw images Results and conclusions L. Deacon, M. Wing (UCL)
Date of download: 9/18/2016 Copyright © 2016 SPIE. All rights reserved. Schematic of the simultaneous time- and wavelength resolved fluorescence spectroscopy.
SMART CAMERAS AS EMBEDDED SYSTEM SMVEC. SMART CAMERA  See, think and act  Intelligent cameras  Embedding of image processing algorithms  Can be networked.
Low-Cost Fundus Camera Final Review. Optical Structure Camera Sensor Distance Between 16mm 20 Diopter Lens Distance Between 1mm 50mm Macro Camera Lens.
Project lead by Fusion For Energy (F4E)
Astronomical Spectroscopic Techniques
Laser calibration systems
Viewport 1, Sep. 26, 2007 Temperature (ºC) on HPU display Primary : 72
Production and commissioning of the 2nd BGC
Lasers for the polarimeter
Oct 4, :00 after 0.5 hrs TT2 tunnel access
From: A Novel, Real-Time, In Vivo Mouse Retinal Imaging System
Accelerator R&D for Future Neutrino Projects
Date of download: 1/9/2018 Copyright © ASME. All rights reserved.
Optical Diagnostics tight environment high radiation area
FRED Optical Engineering Software
MFM setup. MFM setup. The excitation lasers are combined in a fiber through an acousto-optic tunable filter, collimated, reflected on a dichroic mirror.
1st Hg jet run with pulsed solenoid
VENUS AND JUPITER.
Secondary Electron Emission and Photoemission Tests
Presentation transcript:

Optical Diagnostics T. Tsang BNL (Aug. 4, 2006)

Optical Diagnostics tight environment high radiation area non-serviceable area passive components optics only, no active electronics transmit image through flexible fiber bundle

Optical Diagnostics test target retroreflected illumination Spherical mirror laser illumination image collection Works OK in this tight environment cm scale

Optical Diagnostics optical design in secondary containment One set of optics per viewport Conceptual design completed

Sumitomo imaging fibers – used in oue setup IGN-08/30 sample 0.3-meter 30,000 pixels Cost per foot $78$158$305 Cost in 10 meter $2574$5214$10065 Total cost for 4 fibers (40 meter) $10.3k$20.8k$40.3k Rad-hard to 1 Mrad

Fujikura imaging fibers – Not used Fujikura data, FIGH-30 A continuous 20-meter fiber 30,000 pixel imaging fiber Cost per foot $85$250$540 Cost in 10 meter $2805$8250$17.8k Total cost for 4 fibers (40 meter) $11.2k$33k$71.8k unofficial price info illumination uniformity image after a continuous 20-meter long fiber Cost/foot$210$371.4 Cost in 10 meter$6,935.65$12,256.7 Cost in 20 meter$15,607.9 Total cost for 4 fibers (40 meter) $27,742.6$49,026.8 official price info

Image quality comparison camera SMD illumination NIR pulse, 10 us/frame 30,000 pixels, 1-mm diameter FujikuraSumitomo 25 cm long30 cm long NO significant difference in image quality Should go with Sumitomo fibers (20 meters have been ordered) $210/foot$78/footdelivery in 4 weeksdelivery in 3 months FIGH NIGN-08/30

Grin objective lens imaging fiber – 1 mm illumination fiber fiber holder All-in-one optical setup

July 2006 Sumitomo IGN08/30 imaging fiber – 20-meter long NIR 100 µs/frame static image 800 x 50 x

New baseplate on mock-up – SMD camera dynamic image SMD camera: NIR pulse 100 µs/frame illumination fiber imaging fiber 25 Watt pulsed NIR laser one set of viewport optics SMD camera mock-up primary stationary image

New baseplate on mock-up – FastVision camera dynamic image FastVision camera: NIR pulse 2 ms/frame stationary image

10-meter imaging fibers will be assembled on mock-up primary dynamic image collection on both viewports will be tested 1 st camera will be SMD CCD 2 nd camera will be FastVision CCD 2 sets of viewport/optics/CCD will be ready by the end of August 3 more 10-meter long imaging fibers in order – viewports 3 rd & 4 th Summary