STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 Low Energy Telescope (LET) Overview Alan Cummings 626-395-6708

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
IMPACT Report SSMO Receiving Review– January 23, 2007.
Critical Design Review 2002 November 20,21,22 STEREO IMPACT 1 SEP Central, LET, and SEPT Flight Software Presenter: Andrew Davis
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 LET Electronics Rick Cook
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
STEREO IMPACT Preliminary Design Review 2001-September 11,12 David Curtis1 IMPACT Project Overview.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
From Research Prototype to Production
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Peter Walpole, UMd1 SUPRATHERMAL ION TELESCOPE SIT.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
May contain Caltech/JPL proprietary information and be subject to U.S. Government Export Laws; U.S. recipient is responsible for compliance with all applicable.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 HET/SIT Flight Software and GSE Tycho von Rosenvinge )
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
C osmic R Ay T elescope for the E ffects of R adiation June 27, 2005Larry Kepko - Data ProcessingPage 1 CRaTER Characterization Data Products & Production.
STEREO IMPACT Preliminary Design Review 2001-September 11,12 Rick Cook1 LET Electronics.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Low Energy Telescope (LET) Overview Alan Cummings caltech
SPF MAG Quarterly Report – Feb 2015
WBS 1.03 Readout Systems Scope, Cost and Schedule
THEMIS Mission Assurance
FIELDS SCM Thermal iPER
High Energy Telescope (HET) GSFC Caltech JPL
PHI Status Report SO Cleanliness Working Group #24
University of California, Berkeley
GLAST Large Area Telescope
Systems Engineering Bob Goeke.
Launch and On-orbit Checkout
Integration and Test Organization Chart
GLAST Large Area Telescope
Introduction and Overview
PSS verification and validation
Presentation transcript:

STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 Low Energy Telescope (LET) Overview Alan Cummings

STEREO IMPACT Critical Design Review 2002 November 20,21,22 2 SEP Instrument Suites SEPT-E SIT SEP/ HET & LET SEPT-N/S AHEAD SPACECRAFT SIT SEP/ HET & LET SEPT-E SEPT-N/S IN SAME POSITION AS AHEAD S/C BEHIND SPACECRAFT

STEREO IMPACT Critical Design Review 2002 November 20,21,22 3 Main SEP Assembly LET Telescope HET Telescope SEP Central Enclosure Analog/ Post-Regulator Electronics Board Digital Logic Electronics Board LVPS HV Bias Supply Behind S/C configuration shown

STEREO IMPACT Critical Design Review 2002 November 20,21,22 4 Low Energy Telescope (LET) Schematic Top Cover M.I.S.C. Electronics Board Upper Shields L2 & L3 Detectors Inner Detector Housing Detector Collimators L1 Detectors Main Housing Lower Shields Front-End Electronics Bottom Covers

STEREO IMPACT Critical Design Review 2002 November 20,21,22 5 LET System dE/dX vs. E particle identifier Sensors (on each spacecraft) –Ten L1 Si ion-implanted detectors, 20 um x 2 cm 2 circular with 3 active areas, arranged in two sets of 5 around a “ferris wheel” (A side and B side form two identical telescopes) –Two L2 Si ion-implanted detectors, 50 um x 6.4 cm x 1.6 cm rectangular with 10 active areas, one for A side and one for B side –Two L3 Si ion-implanted detectors, 1 mm x 7.8 cm x 2.0 cm rectangular with 2 active areas, one for A side and one for B side 4 Pulse-Height Analysis System Integrated Circuit (PHASIC) chips packaged in 4 hybrids; each contains 16 channels of analog to digital signal processing One minimal instruction set computer (MISC) implemented in an Actel gate array SRAM Detector bias supply (shared, in SEP Central) Low voltage power supply (shared, in SEP Central) Analog/Post-regulator (shared, in SEP Central) Mechanical housing & bracket

STEREO IMPACT Critical Design Review 2002 November 20,21,22 6

STEREO IMPACT Critical Design Review 2002 November 20,21,22 7 LET Responsibilities Caltech –Low Energy Telescope development/test (lead) –Detector procurement –Flight software, including on-board algorithms (lead) –Electronics, including PHASIC and MISC –SEP integration & test –Scheduling JPL –LET development/test (assist) –GSE development –L1 detector testing GSFC –LET mechanical design and fabrication (e.g., detector mounts, telescope, and bracket) –LET thermal design –On-board algorithms (assist) –L2, L3 detector testing Space Instruments –Detector bias supply –Analog/Post-regulator U. C. Berkeley –Low voltage power supply

STEREO IMPACT Critical Design Review 2002 November 20,21,22 8 LET Personnel Tycho von Rosenvinge, SEP Coordinator, GSFC, Dean Aalami, Bias supply & analog/post-reg boards, SI, Jill Burnham, Layout support, Caltech, Rick Cook, Lead Electronics Engineer, Caltech, Alan Cummings, Project Manager at Caltech, Caltech, Andrew Davis, On-board software & LET testing, Caltech, Beverley Eyre, LET L1 detector thinning, JPL, Sven Geier, Detector testing, Caltech, John Hawk, Thermal engineering, GSFC, Branislav Kecman, Electronics Engineer, Caltech, Allan Labrador, Software support & det. testing, Caltech, Rick Leske, Accelerator and other testing, Caltech, Dick Mewaldt, LET design & testing, Caltech, Vincent Nguyen, Electronics Engineer, Caltech, Bob Radocinski, Electrical GSE, JPL, Caltech, Donald Reames, LET On-board algorithms, GSFC, Stacia Rutherford, Grants Manager, Caltech, Sandy Shuman, Mechanical design, GSFC, Ed Stone, Management, Caltech, Janet Valenzuela, Document control & tech. support, Caltech, Mark Wiedenbeck, Detectors & LET testing, JPL,

STEREO IMPACT Critical Design Review 2002 November 20,21,22 9 Applicable Documents Phase A Study for the IMPACT Investigation on STEREO, Volume 1: Tech. Sect., dated July, 2000 STEREO Mission Requirements Document STEREO EMI/EMC Control Plan, JHU/APL STEREO Contamination Control Plan, JHU/APL STEREO Environments Definition, Observatory, Component and Instrument & Test Requirements Document, JHU/APL STEREO IMPACT Interface Control Document, JHU/APL STEREO Mission Risk Management Plan STEREO IMPACT Performance Assurance Implementation Plan (PAIP) STEREO IMPACT Configuration Management Plan LET-SEP_Central Interface Control Document, STEREO-CIT-009.A LET and SEP_Central Software Development Plan, STEREO-CIT-001.J LET and SEP_Central Software Requirements, STEREO-CIT-002.E LET Level 1 Data Format, STEREO-CIT-004.B LET Science Telemetry Data Frame Format, STEREO-CIT P24 MISC Microprocessor Users Manual, STEREO-CIT-005.A LET Functional Test Plan, STEREO-CIT-006.A SEP Sensor Suite Commanding and Users Manual, STEREO-CIT-007.A Caltech STEREO PHASIC Design Document, STEREO-CIT-013.A Documents and schematics are available at ftp://mussel.srl.caltech.edu/pub/stereo/docs, ftp://mussel.srl.caltech.edu/pub/stereo/CDR, or ftp://mussel.srl.caltech.edu/pub/stereo/CDRhttp://sprg.ssl.berkeley.edu/impact/dwc/

STEREO IMPACT Critical Design Review 2002 November 20,21,22 10 LET Reviews and Action Item Status STEREO IMPACT SEP/MAG Peer Review, 4/19/01 STEREO IMPACT Project Site Visit to Caltech, 7/26/01 STEREO IMPACT System Peer Review, 8/2/01 Preliminary Design Review, 9/11/01 Software Design Review, 4/30/02 Contamination Peer Review, 10/24/02 Responded to all action items from these reviews

STEREO IMPACT Critical Design Review 2002 November 20,21,22 11 EMC/Contamination/Environmental Bias supply not synchronized –Waiver EMC3A submitted and approved Contamination –SEP contamination control plan not received from Project as of 13 November 2002 –Project-supplied contamination control engineer visited and made informal recommendations –JPL contamination control engineer visited, measured particulate counts in our assembly lab (room 5 Downs -> class 100K+) and on clean benches (Class 0), and made recommendations –Plan is to use similar techniques, but with more attention to contamination issues, to assemble and test LET as were used on ACE SIS & CRIS which were largely assembled and tested in our lab –LET L1 detectors will be stored in dry nitrogen and testing primarily done in a controlled room (clean room garments required for entry) – same as on ACE –GSFC will do testing on L2 and L3 detectors in a clean environment –LET flight units will be kept on clean benches; clean benches to be roped-off to cut down on foot traffic in the area – same as on ACE –Personnel will use gloves and clean room garments – same as on ACE –Will bag and purge during operations off the clean bench, e.g., accelerator testing, vibration, etc. –Considering use of a clean tent if bagging for transfer between clean benches is frequent –Will do bake outs according to Contamination Control Plan –Will do final clean of exterior surfaces (to get from expected 500A level to 300A for delivery to JHU/APL)

STEREO IMPACT Critical Design Review 2002 November 20,21,22 12 EMC/Contamination/Environmental (continued) Contamination (continued) –Incoming flight sensor assemblies (HET, SIT, and SEPT) will be unpacked on clean bench –JPL contamination control engineer will inspect external surfaces to establish incoming cleanliness –Will have 4 clean benches to handle all flight assemblies –Final clean of all may be necessary to get to 300A level for delivery Bake out of assemblies after sensors installed must be done at relatively low temperature (<35-40 C) –For LET & HET we are doing contamination test of detector & mount in next few weeks to assess outgassing of the sensitive detectors in their mounts –May have to pre-bake out the mounts before detectors are installed –Other parts can be baked out at higher temperatures before installing flight detectors Environmental –Test program defined by STEREO Environments Definition, Observatory, Component and Instrument & Test Requirements Document, JHU/APL and by LET Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 13 LET Verification Plan Detectors: –L1’s tested at Micron/Caltech/JPL; L2’s & L3’s tested at Micron/GSFC –Tests at Micron prior to delivery include random vibration and thermal cycle –Tests at Caltech/JPL/GSFC include noise & breakdown, thermal vacuum, and alpha particle response –Also will mockup housing/bracket and do acoustics & vibration tests –Thickness of L1 detectors will be measured with alphas Hybrids (containing PHASIC chip): –Electrical tests at room temp, hot, and cold –Radiation tests on prototype –Leak tests, etc. per Class H Detector/MISC board: –Originally two boards but now one single rigid-flex board –Board will be electrically tested over temperature

STEREO IMPACT Critical Design Review 2002 November 20,21,22 14 LET Verification Plan (continued) Windows: –Vibration, acoustics, and thermal cycle in mockup LET System: –Many tests per Verification Matrix –Environmental tests will be in conjunction with HET & SEP Central –EMC/EMI at UCB –Thermal vac, acoustics, and vibration at JPL –End-to-end test at accelerator –Functionality testing with pulsers and alpha particles –Simulation of instrument response

STEREO IMPACT Critical Design Review 2002 November 20,21,22 15 LET Verification Matrix

STEREO IMPACT Critical Design Review 2002 November 20,21,22 16 LET Integration & Test Flow

STEREO IMPACT Critical Design Review 2002 November 20,21,22 17 Outline of LET Functional Test The following functional test modules have been designed for use in ground and possibly in-flight testing (see LET Functional Test Plan, document no. STEREO- CIT-006.A). 1) ADC Calibration –Use built-in test pulsers (5 values) and 8-bit DAC –Calibrate all 54 ADCs at 32 specified DAC levels –Takes 15 minutes at ~5 pulses/second 2) Logic Test –Pulses detector combinations in specified patterns to test event identification, sorting, and prioritization for telemetry –Includes 1024 different detector combinations –Includes 64 pulse-height combinations from four DACs 3) ADC Threshold Test –Measures all 108 ADC threshold levels by pulsing 256 selected levels and monitoring rate data –Also monitors noise performance –Takes ~10 minutes to run

STEREO IMPACT Critical Design Review 2002 November 20,21,22 18 LET In-flight Livetime and ADC Calibration These two tests can be run continuously in-flight and on the ground to monitor ADC stability and instrument livetime performance. 1) ADC STIM Mode –Completes full test of all 54 ADCs (32 DAC levels) in 8 hours –Essentially same as ADC Functional Test but run at ~0.1 pulses/sec 2) Livetime Monitor –Stimulates 12 different event types to at fixed rate of ~2/sec –These events compete with normal rates for on-board analysis –Monitors livetime to <0.3% accuracy per hour at “background” event rates up to 10 4 /sec

STEREO IMPACT Critical Design Review 2002 November 20,21,22 19 Risks, Issues, & Mitigations L1 detector fabrication technique is new –Started a plan B approach as a backup using conventional fabrication method (with likely poorer performance) Windows covering L1 detectors on Sun-facing side may be thermally stressed –Thermal analysis indicates 60 deg temperature swing –Window is proposed to be 8 um Kapton with vapor deposited gold coating on inside and ITO silver conductive composite on outside –WIND EPACT instrument had nearly identical windows but it saw Sun only 50% of the time –ACE SIS stared at Sun (always within about 45 deg) but had larger-area, thicker, and additional windows (25 um, 8 um, and 8 um) –Telescope design will prevent rupture of one window from light contamination of other L1 or L2 detectors –Thermal tests of prototype windows will be conducted LET “Ferris Wheel” is on a bracket and may have problems with vibration –Vibration analysis underway –Vibration tests of mockup will be conducted PHASIC chip is no longer high risk item –2 nd version in process –1 st version good enough to keep design tasks and tests going; possibly could be used –1 st version passed radiation tests –3 rd run possible if 2 nd version fails – not thought to be likely

STEREO IMPACT Critical Design Review 2002 November 20,21,22 20 Risks, Issues, & Mitigations (continued) Layouts might not fit in chosen board sizes –Schematics and layout assessments have been done but not actual layouts –Impact would be to make any affected housing slightly larger –Weight would increase accordingly –Should know by end of 2002 for questionable one –Schedule impact should not be major as final housing drawings are not complete

STEREO IMPACT Critical Design Review 2002 November 20,21,22 21 LET Milestones CDR11/22/02 PHASIC version 2 chips received from vendor12/31/02 LET L1 detector decision date 1/31/03 Flight hybrids tested and ready 3/25/03 LET Detector/MISC EM board tested 6/23/03 LET Detector/MISC flight boards tested10/28/03 LET detectors tested & selected11/25/03 EM sytems test complete (with SEP Central + others)12/29/03 LET flight mechanical parts ready 9/1/03 LET telescope flight integration finished 1/27/04 LET-SEP integration & test finished 3/16/04 Remaining schedule addressed in SEP I&T section

STEREO IMPACT Critical Design Review 2002 November 20,21,22 22 Open Issues/Concerns See Risks & Mitigations slide Schedule needs to be re-baselined Budget is tight with no reserve held at Caltech