SAP Support Costs Am I Paying too Much?. Agenda  Company Background  SAP System Details & Support Model  Base Line Cost Assessment  Evaluate the Options.

Slides:



Advertisements
Similar presentations
Track 6 – Enterprise Resource Planning Higher Education ERP: Lessons Learned Ken Orgill West Virginia University Dave Swartz George Washington University.
Advertisements

Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
How to commence the IT Modernization Process?
SAP Overview SAP Solutions. 2 Agenda for the overview Introduction to the SAP R/3 system SAP system’s functionality SAP implemenation methodology mySAP.com.
ITIL: Service Transition
Acquiring Information Systems and Applications
Outsourcing MIS 5973 Rui Huang, Sujun, Lamont Allison, Allen Burcham.
The Outsourcing Process
Enterprise Impact on Funds Management with BCS
Copyright © 2003 Americas’ SAP Users’ Group Use of Impress SAP-P3 Interface for Projects – Session 3804 Stuart Graham, Halliburton Process Lead - Project.
3108: Enterprise Upgrade Lessons Learned
#4502 – Streamlining the Physical Inventory Process Using a Custom Solution.
Creating & Maintaining an Effective SAP CCC (On A Budget!)
CHAPTER 10 & 13 IS within the Organization & Acquiring IS and Applications.
Implementation Audit and Control Background Internal Audit Role Go-Live Criteria Audit Approach - Systems Audit Approach - People Summary Agenda.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 8 - ERP Modules Ir. Ekananta Manalif, MM, MKom (D2664)
Enterprise Resource Planning (ERP) Systems
Enterprise Content Management (ECM) Simulator for Return on Investment (ROI)
Acquiring Information Systems and Applications
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
Sponsored by Powered by Moving at the Speed of Change May 2015 Charlotte PowerBuilder Conference Appeon Case Study Deploying Appeon as a Commercial Software.
Building E-Commerce Applications and Infrastructure.
Categories of Software
Chapter 2 The Origins of Software Modern Systems Analysis and Design.
ITS Software A TxDOT Statewide Perspective Charlie Farnham ITS Configuration Manager ITS America June 6, 2007.
Transaction Processing Systems and System Development Life Cycle
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
© 2005 by Prentice Hall 2-1 Chapter 2 The Origins of Software Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Introduce SAP By Robert Hurt PhD, CFE Accounting Department.
Name Class.  Review of Implementation Process  Identify Critical Success Factors  Define Change Management (big picture)  Define Role of Corporate.
R McFadyen Chapter 10 Selecting the Best Alternative Design Strategy.
Acquiring Information Systems and Applications
Application Lifecycle Management : Leveraging the Cognos Investment Prepared for Cognos User Conference January 20, 2005.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Serena Project Case Study Sapphire, Atlanta April 23, 2007.
Information Technology Project Management Buying Packaged Software: RFPs and Vendor Selection.
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
CHAPTER 13 Acquiring Information Systems and Applications.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Chapter 2 The Origins of Software Modern Systems Analysis and Design Fifth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 Business Aspects of Software Engineering SWE 513.
Software Testing and Software Quality Assurance Process.
Installation and Maintenance of Health IT Systems Unit 8b Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Keys to Success Upgrade services to 2.5G or 3G 3G will be the expectation moving forward. Customer Service Coverage area Pricing.
Cis339 Chapter 2 The Origins of Software 2.1 Modern Systems Analysis and Design Fifth Edition.
8-1 © Prentice Hall, 2007 Topic 8: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra,
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
ITIL® Online Training Course Enhancement Service Design.
Ryan Kula CIST 3000 Report Presentation 05/01/2014.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 8 Moving from Analysis to Design Design Strategies.
Chapter 2 The Origins of Software
ROAD ACCIDENT FUND RFB/RAF/HO/00214 DATE: 11 August 011
ERP Proposal Evaluation Team Training
ITIL: Service Transition
ERP Systems Lecture # 7.
Your Next LIMS: SaaS or On-Premise? Presented by:
Chapter 2 The Origins of Software
Construction and Materials Management System
Systems analysis and design, 6th edition Dennis, wixom, and roth
Chapter 2 The Origins of Software
Chapter 2 The Origins of Software
Systems analysis and design, 6th edition Dennis, wixom, and roth
Enterprise Resource Planning (ERP) Systems
Chapter 2 The Origins of Software
SOFTWARE DEVELOPMENT LIFE CYCLE
City of Minneapolis IT Outsourcing Why We Outsource &
Presentation transcript:

SAP Support Costs Am I Paying too Much?

Agenda  Company Background  SAP System Details & Support Model  Base Line Cost Assessment  Evaluate the Options  Redesigned Support Model  Service / Cost Comparisons  Performance Metrics  Other Tips

Company Background  Joint Venture Company  Primary Business: Oil Refining  1200 Employees + A Variable Number Contractors  236,000 barrels per day  Revenues = $1.0 billion (approximate)  Converted to SAP in 1999

SAP System Details  Release 4.6C IS-Oil  Operating System: IBM AIX (4.3.3)  Database: Oracle (8.1.7)  Hardware: IBM RS/6000  Number of Servers = 12  Production Data Base = 89 Gigabytes  Total Storage = 0.6 Terabytes

SAP System Details (cont.)  Modules: FI, CO, AM, MM, PM, PS, SD, HR  1 company code  3 Core Modifications  1670 Custom Programs (< 100 used)  28 Interfaces  800 Licensed Users  Peak Concurrent Users = 120

Support Model -History  Implementation Team Transition -Hardware / Software Acquisition -Outsourcing Agreement (BPM)  Implementation Steering Team (Business) -Minimal In-house IS support staff -Application Support = 12.5 FTE’s (outsourced)

Support Model –History (cont.)  Upgrade from 3.1H to 4.6C -Application Support = 10 FTE’s (outsourced) -Some Production Support Transitioned to In- house Upgrade Team  2003 “Transition Year” -Business Process Leads -In-house Support Team -New Outsourcing Agreement

Baseline Support Costs

Observations  Application Costs Not Adjusted for Current SAP Market Conditions  Technical Landscape Outdated; High Maintenance Effort  Minimal Knowledge Transfer Occurring  Few Process Improvement Initiatives  SAP Strategy Not Well Defined  Metrics tracked were of minimal value

Baseline Support Costs Observations (cont.)  Support work processes not well defined  Users interacting directly with 3 rd tier support staff

Evaluate the Options  Attempt to Re-negotiate with Current Outsourcing Vendor  Initiate “Request For Proposals” Process  Redefine In-house Staffing – How Big?  Move to a “Fully Hosted Solution”  Change Management – Gauge what the Business Will Accept?

Redesigned Support Model  Attempt to Re-negotiate with Current Outsourcing Vendor  Initiate “Request For Proposals” Process  Redefine In-house Staffing – How Big?  Move to a “Fully Hosted Solution”  Change Management – Gauge what the Business Will Accept?

Redesigned Support Model End Users Information Systems Dept. Process Owners & Process Leads SAP Team 3 rd Party Outsourcer(s) Operations SAP Support Level Service Level Agreement Low High TechnicalFunctional Maintenance Agreement Power Users Service Level Agreement(s)

Service / Cost Comparison  AIX/Oracle or Win2000/SQL?  Fixed Price For Base Maintenance and Support “All Inclusive”  Enhancements on a Time & Material Basis  Quality of Service Expected to Improve  In-house Staff Focused on Improving ROI and Alignment With Business Initiatives  42% Reduction in Annual Support Cost

Baseline Support Costs

Performance Metrics Bug Fixes DescriptionMetricResolution Time Critical100%Within 24 hours (clock time) High97%Within 2 business days Medium90%Within 5 business days Low90%Within 7 business days

Performance Metrics (cont.) Availability Production = % Non-Production = 97% Response Time (User Dialog) 95.0% within 1 Second 97.5% within 2 Seconds Critical Business Transactions Set User Expectations Work toward continuous improvements

Tips  Evaluate operating system options (AIX vs Win2000)  Be selective on 3 rd Party Software  Assess impact of custom development  Define “Steady State” services and RFP for lowest cost  Shop for best resource(s) to do enhancement work and apply project management principles  Lowest cost per hour does not always translate into lowest total cost

Tips (cont.)  In-house staff are best positioned to drive process improvement efforts but may need a jump start from an outside consultant  Establish Cost Indicators in order to evaluate efficiencies (i.e. Cost Per Concurrent User)  Select an outsourcing vendor who has a good relationship with SAP  Conduct operations and efficiency audits  Frequently assess business needs

Thank you for attending! Please remember to complete and return your evaluation form following this session. Session Code: 2811