DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE AND INFORMATION TECHNOLOGIES DURING G.Shirkov, JINR Chief Engineer 106 th JINR Scientific Council, 25 September, 2009
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative properties of the entire system: operability assurance of the JINR basic facilities; supply of energy resources; communication service; safety protection of vitally important and potentially dangerous elements of the JINR infrastructure ENGINEERING INFRASTRUCTURE G.Shirkov, JINR Scientific Council,
BASIC FACILITIES G.Shirkov, JINR Scientific Council, Development of the JINR engineering infrastructure is the necessary condition for the operation of basic facilities and the basement for new facility creation according to the 7 years programme. The programme of basic facilities development and creation is the subject of the years scientific programmes of JINR Laboratories. NICA-MPD DRIBs IBR-2M IREN
G.Shirkov, JINR Scientific Council, ENGINEERING INFRASTRUCTURE Electric power Heat supply Liquid nitrogen production Water supply Cooling systems Communication service SAFETY POLICY Radiation and nuclear safety Physical protection Industrial safety Labour protection Fire safety
ELECTRIC POWER G.Shirkov, JINR Scientific Council, At presentPlansGoals Main step-down station 1 P=19 MW 2 transformers + 15 MW + 1 transformer LHEP (NICA) Main step-down station 2 P=25 MW 2 transformers + 19 MW + 2 transformers DRIBs, IBR-2, Phasotron Other+ 4 MW from Moscow Channel To release the load of the main step- down station 2 Approx. cost ( ): ~ 4.3 M$ including budget: ~ 0.1 M$ to increase the total power; to improve reliability; to provide independent power supply of the basic facilities. Objectives:
HEAT AND WATER SUPPLY G.Shirkov, JINR Scientific Council, Boiler-houses and heat network: Automation of boiler-houses. Replacement of the steam- boiler in the east boiler-house. Reconstruction and replacement of the heat network. Heat accounting. Plan: Replacement of the outdated equipment Goal: Reliability, modern equipment, economy Water supply: Enlargement and reconstruction of the pumping-filtering station. Automation of the drinking water preparation. Reconstruction and replacement of the water pipes. Water accounting. Approx. cost ( ): ~14.1 M$ including budget: ~ 2.5 M$ Activities to be continued:
TELEPHONY G.Shirkov, JINR Scientific Council, At Present: Analog station ( ) 5500 users (~3800 at JINR) Old network No additional services (IP-telephony, etc.) Space requirement is ~950 m 2 In the Future: Digital electronic station Scalability Optical connection Low cost of long distance calls Modern services Floor space and electricity saving Approx. cost: ~ 0.5 M$ JINR Technical Council ( ) recommended to replace the analog station by digital one, to increase the level of services, keep the communication reliability in emergency situation, reduce the expenses for the station operation.
RADIATION AND NUCLEAR SAFETY G.Shirkov, JINR Scientific Council, Objectives: Purchasing of devices and the equipment for the radiation control. Purchasing of a mobile radiological laboratory. (*) Reconstruction and development of new systems of the radiation control (e.g. IBR-2M, NICA, IREN). (*) Disposal of the used radioactive sources. Handling with the radioactive wastes. Metrological maintenance of the radiation control. Accreditation of the radiation control laboratory. (*) - financial means of JINR Laboratories Approx. cost ( ): ~ 0.5 M$
LABOUR PROTECTION AND INDUSTRIAL SAFETY G.Shirkov, JINR Scientific Council, Main Goals: Providing safe and healthy working conditions for personnel. Ensuring prescribed benefits and compensation for appropriate category of workers. Realization of preventive actions to avoid traumatism, industrial- caused diseases, and also emergencies and failures. Activities to be continued: Certification of workplaces in regard to working conditions to validate, in particular, available benefits and compensation for work in harmful and/or dangerous working conditions. Scheduled replacement of morally and physically outdated equipment and technical devices. Re-equipment of the JINR Industrial and Sanitary Lab with modern instrumentation to take more precisely measurements and online processing of parameters and levels of the harmful and dangerous production factors. Technical upgrade of workplaces of the specialists on labor protection in the JINR departments. Advanced training in the fields of labor and industrial safety for the JINR experts and department heads. The JINR University Center can be involved in this activity.
FIRE SAFETY G.Shirkov, JINR Scientific Council, FIRE STATION control panel GOALS: Re-equipment of the fire station with fire engineering. Modern control panel (GSM, large covering area, etc.). Gradual replacement of the RID-1 enunciators Persistent activities to maintain the JINR infrastructure in accordance with the fire safety requirements. JINR enunciators including ~3500 RID-1 which have to be replaced 7 automatic gas fire-fighting systems Approx. cost ( ): ~ 2 M$
G.Shirkov, JINR Scientific Council, SUMMARY Preliminary estimate of the financing for the programme of JINR engineering infrastructure development in Budget, M$Off-budget, M$TOTAL, M$ Electric power Heat and water supply Telephony0.5- Radiation and nuclear safety0.5- Industrial safety and labour protection 2.0- Fire safety2.0- TOTAL, M$
INFORMATION TECHNOLOGIES G.Shirkov, JINR Scientific Council, The Laboratory of Information Technologies Main Tasks: Provision of JINR and its Member States with high-speed telecommunication data links Maintenance of a high-speed, reliable and protected local area network (LAN) of JINR Further development of the Central Information and Computing Complex (CICC) Maintenance of the JINR Grid-segment Development and support of information systems with web-interface: thematic portals, paperless document circulation, workshop and conference sites, etc. Development of general Institute strategy and further implementation of the licensed software JINR - Moscow communication channel 20 Gbps The channel has been launched in 2009 with a capacity of 20 Gbps. The mentioned technologies allow one to create up to 72 channels of 10 Gbps each, and to raise the total throughput up to 720 Gbps. The project is realized in cooperation by JINR, RSCC, NORTEL, JET Infosystems, RosNIIROS, the Computer Networks Interaction Center “MCK-IX” Recent significant results Central Information and Computing Complex (CICC) upgrade 2300 kSI2K 400 TB During the last year the CICC performance was increased up to 2300 kSI2K (60%) and the disk storage capacity up to 400 TB (4 times) The working group at the JINR Technical Council was formed to analyze the current status, usage efficiency and plans of development of Information and Computing infrastructure and communication services: telecommunication data links local area network computing power and data storage telephony The aim of this working group is to prepare recommendation directed to the effective usage of these systems as a part of general Institute engineering and information infrastructure development strategy.
G.Shirkov, JINR Scientific Council, COMPUTER NETWORK Short description of the JINR network 6505 computers and nodes 3588 users 7531 IP 1223 Remote VPN users 1Gbps LAN (min. 100 Mbps) Controllead-access at network entrance General services: AFS, batch, Grid, JINR remote access, etc.) JINR – Moscow communication channel International channels The main JINR service-provider for access to the international networks is RBNеt. The parent organization, the ROSNIIROS, is operating the international channel for science and education. They started the process of transition of the trunk lines of these networks to the DWDM technology. Plans: Step-by-step increasing the total throughput based on DWDM technology Local area network Step-by-step modernization of the JINR Backbone – transfer to 10 Gbps (could be started this year) Development and modernization of the control system of the network Development of IP telephony and other services based on JINR LAN Traffic 20 Gbps (2009) → 40 Gbps (2011) → 60 Gbps (2013) →…. Full incoming traffic during 9 months 2009 is > 300 TB In 2010 it is expected > 1 TB It will be useful to investigate a possibility of using the channel for companies - residents of the Special Economic Zone.
G.Shirkov, JINR Scientific Council, Central Information and Computing Complex (CICC) JINR GRID SEGMENT CPU (kSI2k) Disk systems (TB) Mass storage (TB) ~85% of CICC CPU time and ~80% of CICC disk space are used by GRID (mainly LHC) The allocated resources for their use in JINR only should be increased constantly with development of CICC for successful realization of JINR new home projects and JINR participation in future large scale projects It is also necessary to organize in LIT series of lectures and a practical training on bases and methods in GRID system RDIG (Russian Data Intensive Grid) CPUKSI2KDisk, TB FIAN IHEP ITEP JINR MEPHI SPbSU PNPI PSN36-- SINP RRC-KI
G.Shirkov, JINR Scientific Council, Summary External communication links: 1.1 maintenance (1) development one-time expenses (2) LAN: 2.1 maintenance development (3) one-time expenses (4) CICC and Grid-infrastructure: 3.1 maintenance development one-time expenses (5) Licensed software: Service acquisition and other expenses: Totals: (1) payments according agreement and the total cost is distributed among the JINR subdivisions (2) laying a single mode optical cable from LIT to SCC “Dubna” (3) large investment funds are needed along the first years during the switch to 10 GE (4) laying high throughput optical cable between LIT and the settlement in Ratmino (5) acquisition of long term data mass storage using tape robot k$
G.Shirkov, JINR Scientific Council, PROGRAMME OF DEVELOPMENT OF THE JINR ENGINEERING INFRASTRUCTURE The development of the engineering infrastructure is the basis, which has to provide effective realization of the research programme to achieve significant scientific results.