GoldenDOMs Status and analysis plan Shigeru Yoshida (for Hiroko M) Dept. of Physics, Chiba University.

Slides:



Advertisements
Similar presentations
PMT absolute calibration using the Rayleigh scattering in Nitrogen air PMT absolute calibration using the Rayleigh scattering in Nitrogen air S. Yoshida,
Advertisements

PMT Calibration Results and the MC simulation Shigeru Yoshida, Chiba University
NSF Baseline Review February 10-12, 2004 Optical Module Production Phil Robl Physical Sciences Laboratory.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
Uniformity Measurement of the Hamamatsu 10 inch PMT Hiroko Miyamoto Dept. of Physics CHIBA University Laguna Beach2003.
EHE Neutrino Search with the IceCube Aya Ishihara The University of Wisconsin - Madison for the EHE Verification working group.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University Angular Response of 10inch PMT.
The result of GoldenDOM Calibration Hiroko Miyamoto T.Noda, S.Yoshida, K.Mase K.Hoshina, M.Krasberg, K.Hanson, C.Rott Chiba University, UW Madison, PSU.
A first look of the 10” High QE PMT Shigeru Yoshida for Yuusuke Hasegawa and Mina Inaba Dep. of Physics, Chiba University “Super Bialkali” photocathode.
Pre-shipping PMT screening at Chiba Chiba University Shigeru Yoshida for Kazuhiro “ Jee ” Fujimoto.
April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY.
Angular Response of 10inch PMT for IceCube Hiroko Miyamoto Dept. of Physics Chiba University.
PMT SPE Chiba (new parameters for next version of ROMEO) (new parameters for next version of ROMEO) Yusuke Hasegawa et al., presented by.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
April 4, 2007 Rolf Nahnhauer1 DESY-PROJECT IceCube Digital Optical Module Production.
IceCube 1400 m 2400 m AMANDA South Pole IceTop Skiway 80 Strings 4800 PMT Instrumented volume: 1 km3 (1 Gt) IceCube is designed to detect neutrinos of.
High Energy Workshop 2006 Summary and status Shigeru Yoshida (Chiba University) For the EHE( “ track and cascade ” ) WG.
The IceCube High Energy Telesope The detector elements Expected Sensitivity Project Status Shigeru Yoshida Dept. of Physics CHIBA Univ. ICRC 2003.
High Energy Verification Status and plan for PY Shigeru Yoshida (Chiba University)
Cross-Calibration of FDs Sean R. Stratton TA-All Meeting – June 2010.
PD Kobe Univ. 06/29/2007 General performance of the IceCube detector and the calibration results I am Mina Inaba from Chiba university. I will.
IceCube System Testing
1 TPC online  offline calibration November 2002.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
EHE Search for EHE neutrinos with the IceCube detector Aya Ishihara for the IceCube collaboration Chiba University.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
A km 3 Neutrino Telescope: IceCube at the South Pole Howard Matis - LBNL for the IceCube Collaboration.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
IceCube: String 21 reconstruction Dmitry Chirkin, LBNL Presented by Spencer Klein LLH reconstruction algorithm Reconstruction of digital waveforms Muon.
AMANDA and IceCube neutrino telescopes at the South Pole Per Olof Hulth Stockholm University.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
Performance of CRTNT for Sub-EeV Cosmoc Ray Measurement Zhen Cao IHEP, Beijing & Univ. of Utah, SLC Aspen, CO, 04/2005.
CIPANP 2006K. Filimonov, UC Berkeley From AMANDA to IceCube: Neutrino Astronomy at the South Pole Kirill Filimonov University of California, Berkeley.
Why Neutrino ? High energy photons are absorbed beyond ~ 150Mpc   HE  LE  e - e + HE s are unique to probe HE processes in the vicinity of cosmic.
The Status of IceCube Mark Krasberg University of Wisconsin-Madison RICH 2004 Conference, Playa del Carmen, Mexico Dec 3, 2004.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
NESTOR SIMULATION TOOLS AND METHODS Antonis Leisos Hellenic Open University Vlvnt Workhop.
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
Standard Candle, Flasher, and Cascade Simulations in IceCube Michelangelo D’Agostino UC Berkeley PSU Analysis Meeting June 21-24, 2006.
RENO PMT TEST  PMT type DAQ setup Single Photon Electron Resolution Dark Current After Pulse Ratio with two methods  Summary Kyung Ju Ma, Oct.
Calibrating the first four IceCube strings Kurt Woschnagg, UCB L3 Detector Characterization IceCube Collaboration Meeting, Bartol, March 2004.
Azriel Goldschmidt AMANDA/IceCube Collaboration Meeting Laguna Beach, CA March 2003 String-18 Progress and Plans.
IC59 Cascade Filter Comparison between the recos for (HLC+SLC) and (HLC only) pulses Part I Mariola Lesiak-Bzdak LBNL 1 Cascade Phone Call, Nov. 8, 2010.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
DOM Two Dimensional Scanning using testDAQ Hiroko Miyamoto T. Noda Faculty of Science Department of Physics Chiba University.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
Baikal-GVD: status and plans Denis Kuleshov Denis Kuleshov INR, Moscow, Oct 28, 2015.
IceCube Calibration Overview Kurt Woschnagg University of California, Berkeley MANTS 2009 Berlin, 25 September identical sensors in ultraclean,
IceCube project Shigeru Yoshida Dept. of Physics, Chiba University.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Z. Cao, H.H. He, J.L. Liu, M. Zha Y. Zhang The 2 nd workshop of air shower detection at high altitude.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
DOM acceptance and calibration
Recent progress of PureCsI+APD readout
IceCube System Testing
Calibrations What’s new in Kurt Woschnagg, UCB
Time resolution measurement with Madison test-DAQ
Time calibration Dmitry Chirkin, LBNL UC Berkeley, November 2004.
Department of Physics and Astronomy,
md-NUV PET project meeting
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

GoldenDOMs Status and analysis plan Shigeru Yoshida (for Hiroko M) Dept. of Physics, Chiba University.

The Golden DOM people Chiba Hiroko, Tsuyoshi, Mina, Shigeru UW-Madison Kael, Mark, Aya, Kotoyo PSU Carsten

DOM 2D Scan 2D PMT Scan N 2 laserN2N2 PMT/DOM Absolute Efficiency

Chamber and DAQ ATTENUATOR Pressure meter Temp monitor

■ Calibration of PMTs and Digital Optical Modules (DOMs) Main board metal cageFlasher board Optical gel HV board 10 inch PMT DOM PMT Normal check  Normal check: (1/10)  Linearity of the PMT gain  dark noise rate  charge resolution Golden PMTs  Golden PMTs: (1/60) normal check +  2D sensitivity scan  Absolute calibration HamamatsuChiba Univ.Wisconsin Univ.Chiba Univ.South Pole  makes all PMTs  assembles DOMs  check all DOMs (under low temperature)  Linearity of the DOM gain  dark noise rate  component check  cold reboot  communication test  Golden DOMs  Golden DOMs: (1/80)  2D sensitivity scan  Absolute calibration

Hakkenden (“eight” dog) Warriors….? DOM name PMT # Sosuke_Inukawa : TA failed Dosetsu_Inuyama : TA1069 Shino_Inuzuka : TA1052 Genpachi_Inukai : TA1167 Kobungo_Inuta : TA1062 Keno_Inuzaka : TA failed Shinbei_Inue : TA1059 Daikaku_Inuyama : TA failed

Shinbei_Inue GDOM absolute calibration data Local Coincidence with a sync signal of N2 laser!!

Genpachi_Inukai GDOM absolute calibration data Local Coincidence with a sync signal of N2 laser!!

Shinbei_Inue GDOM 2D scan data DOM PMT

Shino_Inuzuka GDOM 2D scan data DOM PMT

S39-53 S39-55 S39-56 X-axis in [ns] y-axis in [mV] String 39 GDOM Flasher data FADC ATWD time window S21-55 flasher By Aya (UW-Madison)

IceRayTrace Simulation By Kotoyo (UW-Madison)

IceRayTrace Simulation By Kotoyo (UW-Madison)

Analysis Plan ROMEO-GPMT DOMIMANT(Geant4) String-39 Flasher/SC IceRayTrace Energy Calibration (Hole)Ice

Golden DOM production for PY05 8Golden Chiba DOM UW-Madison 3 left-over UW-Madison <11 Golden Chiba South Pole !! May August Nov