TRINITIANGARA-5 V.I.Zaitsev, A.V.Kartashov, N.I.Lachtjushko State Research Center of Russian Federation Troitsk Institute for Innovation and Fusion Research,

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

1. Instrument Clusters Theory Support Automotive – Displays & Accessories 1 of 13 Instrument Clusters Topics covered in this presentation: Analog Instrument.
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
Analog-to-Digital Converter (ADC) And
Multi Functional Digital Fault Recorder
01/10/2013 Ebro Observatory, October 1st, 2013 New Technology involved in SWING: Software Radio and HF Links A.L. Saverino A.Capria, F.Berizzi, M. Martorella,
PPT 206 Instrumentation, Measurement and Control SEM 2 (2012/2013) Dr. Hayder Kh. Q. Ali 1.
EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
Team Dec13_11: Cole Hoven Jared Pixley Derek Reiser Rick Sutton Adviser/Client: Prof. Manimaran Govindarasu Graduate Assistant: Aditya Ashok PowerCyber.
Using an FPGA to Control the Protection of National Security and Sailor Lives at Sea Brenda G. Martinez, Undergraduate Student K.L. Butler-Purry, Ph.D.,
Introduction to LabVIEW 8.5
Applying Wireless I/O Controller To NeSSI May 7, 2001 Mike Horton President & CEO Crossbow Technology, Inc.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
1 High Speed Fully Integrated On-Chip DC/DC Power Converter By Prabal Upadhyaya Sponsor: National Aeronautics and Space Administration.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
NeSSI Wireless Sensor / Actuator Networking March 7, 2001 John Crawford VP, Business Development Crossbow Technology, Inc.
P07301 Summary Data Acquisition Module. Team Members.
PWM (Pulse Width Modulation)
Secure Systems Research Group - FAU 1 SCADA Software Architecture Meha Garg Dept. of Computer Science and Engineering Florida Atlantic University Boca.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
System Components Hardware overview for Apollo ACS.
Hardware-In-The-Loop Testbed Team 186: Douglas Pence, Ken Gobin, Aaron Eaddy, Advisor Sung Yeul Park Department of Electrical and Computer Engineering,
Oscilloscope Tutorial
2 A. Prof. Hala Abdel-monem Elsadek Microstrip Department Head, Electronics Research Institute Institute /Company: Electronics Research Institute l December.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
REU/RET Optics Research Workshop 2014 Workshop #2 Basic Electronics Dr. Mike Nofziger Professor College of Optical Sciences University of Arizona Dr. Mike.
EMBEDDED WEB SERVER. CONTENT: 1.ABSTRACT 2.INTRODUCTION TO EMBEDDED SYSTEMS 3.INTRODUCTION TO EMBEDDED WEB SERVER 4.BLOCK DIAGRAM 5.POER SUPPLY 6.COMPONENT.
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
DATA ACQUISITION Today’s Topics Define DAQ and DAQ systems Signals (digital and analogue types) Transducers Signal Conditioning - Importance of grounding.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Chapter 5 Engineering Tools for Electrical and Computer Engineers.
The Cathode Ray Oscilloscope
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
New Nuclotron Beam Intensity Monitoring Subsystem V. Andreev, A. Butenko, A. Kirichenko, S. Romanov, G. Trubnikov, V. Volkov Veksler and Baldin Laboratory.
Digital Electronics and Computer Interfacing
Embedded device set for control systems. Implementation and application. Victor R. Kozak BINP, Novosibirsk, Russia Budker INP, Novosibirsk RuPAC-2006.
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
A Measuring Polygon with a Complex of Polarimetric, Combined Active-Passive Sensors of S-, Ku-, and Ka-band of Frequencies for Soil and Snow Remote Sensing.
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
Introduction to LabVIEW 8.5
Department of Industrial Engineering Sharif University of Technology Session# 10.
Floyd, Digital Fundamentals, 10 th ed Digital Fundamentals Tenth Edition Floyd © 2008 Pearson Education Chapter 1.
IMAGE DATA ACQUISITION
Assoc. Prof. Dr. Ahmet Turan ÖZCERİT.  What is engineer,  What is Computer Engineering  The topics in Computer Engineering You will learn: 2.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Bar code scanner Department of Computer Engineering, M.S.P.V.L. Polytechnic College, Pavoorchatram.
A Presentation on Mr. SAJID NAEEM M.SC – Electronics (UOP) PG-DEP (C-DAC)
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
1 T. Mohite and H. Welker LINAC and Operation/ Electric Power Systems GSI Darmstadt Power Converters for the Magnets of Collector Ring in FAIR
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
A DSP based on on-line UPS R.Padamaja G.Mamatha Reddy EEE EEE S.V.C.E S.V.C.E BY.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
FUNCTION GENERATOR.
Instrument Clusters Topics covered in this presentation:
Wireless Power Driven Car or Train
Figure 17.1 (a) As an engine is accelerated under a load, the engine vacuum drops. (b) The relationship between absolute pressure, vacuum, and gauge pressure.
SCADA for Remote Industrial Plant
ATF/ATF2 Control System
How SCADA Systems Work?.
Engineering Tools for Electrical and Computer Engineers
Naoki Watanabe et al. BTS 2017;2:
Data Acquisition (DAQ)
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Integrated Circuits Computer Signals
Presentation transcript:

TRINITIANGARA-5 V.I.Zaitsev, A.V.Kartashov, N.I.Lachtjushko State Research Center of Russian Federation Troitsk Institute for Innovation and Fusion Research, TRINITI, Troitsk, Moscow reg., , Russian Federation PRESENT STATUS OF THE ANGARA-5 FUSION FACILITY CONTROL SYSTEM

TRINITIANGARA-5 CONTENTS What is HIGH POWER * FACILITY?* Fields of applications. ANGARA-5 facility: -parameters; -research program. Control tasks. Upgrading steps. State of art.

TRINITIANGARA-5 Working cycle (shot) algorithm of HPF

TRINITIANGARA-5 ANGARA-5 fusion facility

TRINITIANGARA-5 ANGARA-5 parameters ANGARA-5 parameters SCIENTIFIC PROGRAM: FUSION EXPERIMENTS; SHOCK WAVE EXPERIMENTS ; X-RAY GENERATION; X-RAY INTERACTION WITH MATTER. PARAMETERS: NUMBER of MODULES 8 OUTPUT VOLTAGE 1 MV CURRENT ON THE LOADup to 5 MA PULSE DURIATION 90 ns NUMBER of SHOT per day up to + 4 LOAD TYPES * ** ELECTRON BEAMS; DIFFERENT LINER KINDS: GAS, WIRES, FOAM

TRINITIANGARA-5 The main tasks of Angara-5 control technological preparation of shot; ** shot permission and start; synchronization of facility units operation;** waveform data acquisition;** data processing and their representation.**

Steps of development of Angara-5 control systems years. Realization and operation of the initial project of the A-5 control and data acquisition systems. Hardware: – VECTOR blocks (Russian analog CAMAC); – computers ELEKTRONIK-60, SM-4 (DEC types). Software: operation systems – RSX, RT years. The first upgrading of A- 5 control and data acquisition systems. Hardware: Change of the computer type: DEC to IBM PC. * * Software instrument: –operation systemMS DOS; –language Quick C and Borland C++; –local network protocol DOS Decnet. ** years. The new subsystem of waveform acquisition Digital Tektronix TDS-××× oscilloscopes, IEEE interface Software: LabVIEW, TCP/IP protocol****TRINITIANGARA-5

TRINITIANGARA-5 Acknowledgements A number of scientists and engineers from various organizations participated, at different stages, in the creation and development of CDAS. The authors, noting a valuable contribution of the SNIP team headed by Prof. Kurochkin S.S. and co-workers in the SRC RF TRINITI, Savochkin V.N., Dudorova E.L. Luzin Yu.N., and Bulan V.V., express their profound gratitude to these institutions and friends.

TRINITIANGARA-5 Angara-5 software structure (state of art)

TRINITIANGARA-5 Waveform2 subsystem**

TRINITIANGARA-5 Liner experiment

TRINITIANGARA-5

TRINITIANGARA-5 checking oil, water, vacuum parameters; gas pressure control in to 200 switch volume; high voltage capacitor battery (80 kV), charging – 16 lines Technological preparation

TRINITIANGARA-5 Synchronization of facility part operation Functions of the timing system. Preparation of the facility parts and devices for shot: –time interval – hours; –time step- 1msec ; –number of channels -32. Starting some system and devices before shot: –time interval -16 sec; –time step -1 µs; –number of channels -32. Synchronization waveform devices during shot: –time interval – 16 µs; –time step – 10 ns; –number of channels – 64 –accuracy –±2,5 ns. Data acquisition of signals front time : –time interval – 16 µs; –time step – 10 ns; –number of channels – 64 –accuracy –±2,5 ns.

TRINITIANGARA-5 Waveform data acquisition Time interval of waveform data acquisition~2-3 µs. Number of signals up to 100 Signal duration  t: Different ADC types are used for signal registration. tt 1-2 µs ns5-15 ns N

TRINITIANGARA-5 Data processing and their representation Creation of database of signals with measuring lines parameters taken into account: -sensor sensitivity; -length ( meters) and other parameters of transmission lines; -ADC sensitivity. Restoration of high frequency of fast signals. Multiwindow presentation of signals.** 

Control and Data Acquisition System of the Angara-5 facility TRINITIANGARA-5

Angara-5 software structure**TRINITIANGARA-5

TRINITIANGARA-5 Application object-oriented program -Experiment description programDSR; -dispatcher program specifying the CDAS operation conditions, initiating the operation cycle start and providing the supervisor connection with local systems D; -local systems control programs and their testing DR; -database including also stationary parameters of measurement channels DB; -users’applied programs.

TRINITIANGARA-5 Multiwindows presentation

TRINITIANGARA-5 Waveform2 subsystem fragment

TRINITIANGARA-5 High rower facilities Like the A-5 HPF are generators of high power electric pulse. Typical parameters: V  1 MV;  I  1-10 MA;  T  nsec. The most powerful facility of such type is the Z- facility of Sandia Laboratory, USA. Its current on the load is about 20 MA. Next year the current of the facility is to be increased up to 30 MA by upgrading. Application areas: -high power electron–ion beams accelerators; -high power x-ray generators; -fusion experiments.

TRINITIANGARA-5

TRINITIANGARA-5