“The Pennsylvania Project” High Speed Maglev A Cost Benefit Analysis Presented by: Shawn Buckner, Poonsri O’ Charoen, Chia-Hui Lan & Afshan Yousuf April.

Slides:



Advertisements
Similar presentations
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Advertisements

Maglev Trains Trains that fly on air.. Presentation Outline How Transrapid works. How Transrapid works. Application information about Transrapid magnetic.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Laura DegitzLogan Stern.  Magnetic Levitation  Alternative to traditional train systems  Lift and propulsion is provided by a large number of magnets.
CHSRA 2012 BUSINESS PLAN Tom Umberg Chair, California High Speed Rail Authority.
Cost-Effectiveness of Reductions in Greenhouse Gas Emissions from High- Speed Rail and Urban Transportation Projects in California Juan Matute and Mikhail.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Elizabeth Sall Maren Outwater Cambridge Systematics,
1 California-Nevada Interstate MaglevProject (CNIMP) Presented to: 87 th Annual Transportation Research Board (TRB) Meeting Presented by: Bob Baldi General.
C O N F I D E N T I A L | Transportation Economics & Management Systems, Inc. Briefing: Northern Indiana / Ohio Passenger Rail Corridor Chicago – Gary.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT When to invest in High Speed Rail Links and Networks Chris Nash Research Professor
Standard Transrapid Maglev System. Standard Titel Wheel-on-railElectromagnetic Levitation Guidance Propulsion Support Propulsion Guidance.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
HSRD Systems Diagram Ten FRA Criteria 1.Ridership Forecasts: Calculated using a logit model that incorporates the reliability, cost, and travel time of.
Public Expenditure Analysis May 4, 2007 Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment Your presenters: Annie Gorman Hazel-Ann Petersen.
North Shore Connector Cost-Benefit Study of Extending Pittsburgh Light Rail Transit to the North Shore Parshwanath Adiraja Dan Concepcion Nicolas Zitelli.
Dulles Metro Extension Phase I: Tyson’s Corner Martene Bryan Luis Serna Matt Zarit.
Skis on the roof or on the slope?: Mobility improvement options for the Colorado I-70 Mountain Corridor Tammy Blackburn Paul Kazemersky May 4, 2007.
“President Obama’s vision for high-speed rail mirrors that of President Eisenhower, the father of the Interstate highway system, which revolutionized.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
The MAGLEV Alternative
Is the expenditure on the ‘HS2’ rail route to Birmingham justified? To see more of our products visit our website at Mark Evetts, Cheltenham.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
MAGLEV TRANSRAPID. WHAT IS MAGLEV? Maglev is a system of transportation that uses magnetic levitation to suspend, guide and propel vehicles from magnets.
TRANSRAPID MANGLEV BY– ISHAAN GUPTA ECE
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Large Starts Issues for the Notice of Proposed Rulemaking New Starts/Small Starts Listening Session and Seminar San Francisco, CA February 15-16, 2006.
The History, Principle and Benefits of the Magnetic Levitation Train Jan Novák Faculty of Mechanical Engineering University of West Bohemia.
Maglev Trains Sloan Hazel.
Florida High Speed Rail Authority Update for Orange County Board of County Commissioners April 7, 2009.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
All within 5 square miles and at the doorstep of ARTIC Study Area Approximately 73,000 employees Home for 25,000 residents Approximately 20 million visitors.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
MAGLEV TRAINS Branch – EXTC 2 Semester – 2 Batch Group 2 Communication Skills.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
Metropolitan Bakersfield High- Speed Rail Terminal Analysis and Evaluation A Presentation to the California High-Speed Rail Authority By the Kern Council.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
High Speed Ground Transportation Association The U.S. High Speed Trains Story – Where do we stand today? Presentation to EurailSpeed – Milan, Italy – November.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
Long Island’s Offshore Wind Farm David Tobias Project Evaluation.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Social cost benefit analysis of Delhi Metro
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Making the Job-Infrastructure Connection CALCOG Region Issues Forum Darin Chidsey.
MAGLEV TRAINS Trains that fly on air. PRESENTED BY DEBAJYOTI DUTTA (Team Leader) SUDIPTA ADHIKARY PAYEL MAJUMDER NIVEDITA SAHA RITAM DAS.
TRI Standard Transrapid Maglev System Innovative traintechnology.
Northern Lights Express Minneapolis/Duluth-Superior Passenger Rail Alliance February 24, Northern Lights Express Minneapolis/Duluth-Superior Passenger.
SHRI RAM MURTI SMARAK COLLEGE OF ENGINEERING & TECHNOLOGY BAREILLY Seminar on “MAGLEV TRAINS” Submitted To- Mr. Virat Bhambhe Submitted By- Bharat Kumar.
Transrapid Maglev System Innovative traintechnology
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
Master Plan Personal Rapid Transit Analysis for Baltimore/Washington International Thurgood Marshall Airport by Peter Muller, P.E. President, PRT.
Calculating the benefits of Transit in North Carolina
Cost-Benefit Analysis: Seattle Link Light Rail, Initial Segment
EWG Study Tour, Galway, 18/09/2006
High Speed Ground Transportation
MAGLEV TRAINS SEMINAR ON GUIDED BY: PRESENTED BY: Ms.SHIKHA BHARDWAJ
Project Feasibility Analysis
Alternative Financing
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
MTA 2019 Final Proposed Budget November Financial Plan
Maglev Trains Trains that fly on air..
Chicago to Council Bluffs-Omaha
Maglev System Application: Transrapid in Shanghai
DART Financial Plan and Fare Structure
Presentation transcript:

“The Pennsylvania Project” High Speed Maglev A Cost Benefit Analysis Presented by: Shawn Buckner, Poonsri O’ Charoen, Chia-Hui Lan & Afshan Yousuf April 25, 2003

Agenda Overview of Maglev Costs Benefits Synthesis Conclusion

What is Maglev? Short for Magnetic Levitation Magnetic Levitation is an advanced technology in which magnetic forces lift, propel, and guide a vehicle over a guideway Authorized by Congress in the Transportation Equity Act (TEA 21), encouraging the development and construction capable of safe use by the public New and proven mode for high speed ground transportation Maglev permits cruising speeds of over 300 mph, or almost 2 times the speed of conventional high-speed rail service Source: Final Programmatic Environmental Impact Statement Vol. I

Technology Propulsion Travelling magnetic field (guideway) Source:

Vehicle Structure and Dimensions Vertical Structure Passenger Vehicle Source: End SectionMiddle Section Length m24.77 m Width 3.70 m Height 4.16 m Passenger Seating Total 62.0 t64.5 t

Why Pittsburgh?

Objectives and purpose of The Pennsylvania Project Bring high speed Maglev to the U.S. –Begin in SW PA –Expand across PA –Expand to neighboring states Capture the economic benefits of PA –Develop new technology –Create new jobs –Become a tourist attraction –Technology for the Maglev Guideway Provide benefits to the traveler Source:

MAGLEV, Inc Creation of the high- speed rail by CMU 2001 Downselect to PA and MD Late 1999 Downselect to 7 Projects: PA, Nevada, Baltimore-Washington, California, Georgia, Louisiana, Florida Early 1999 Downselect to 11 projects 1997 Technology transfer Agreement (MAGLEV, Inc., and Transrapid International 1995 Preliminary study On suitability of Maglev in PA 1991 Completion of Maglev demonstration/ design/development Source: May 2003 Decision will be made 2005 Construction begins

Proposed initial high speed maglev line Pittsburgh International Airport Downtown Pittsburgh Monroeville Greensburg 19 Miles/7 minutes 15 miles/10 Minutes 13 Miles/6 Minutes 47 Miles in 26 Minutes With Stops

Cost-Benefit Analysis

Assumptions Project planning period30 years Construction period5 years Monetary valuesMarket/Nominal term Discount rate10% Principle of accountingAnnual cash basis Salvage valueExcluded from PV Bond period20 years Bond coupon rate7% annual rate Life cycle of vehicle15 years

Ridership Source: The Pennsylvania Project High Speed Maglev Presentation on May 2000.

Ridership Projection Approach Number of passenger 140 in 1 section. Total hour operating 20 hours per day with 6 hours rush hour Number of vehicle service in 1 hour is 7 vehicles while 6 vehicles for off Peak Ridership per vehicle = # of section * # of seat available *% of passenger filled Ridership per one day = ridership per vehicle * (#of rush hour* # of vehicle per one rush hour) + (#of off-peak hour*# of vehicle per one off-peak hour) Ridership per year = ridership per one day* 365 Year # of section % of passenger per one vehicleper one dayper year Year %182 22,932 8,370,180 Year %294 37,044 13,521,060 Year %315 39,690 14,486,850 Year %336 42,336 15,452,640 Year %357 44,982 16,418,430

Cost Methodology Detail$ Infrastructure including guide way and vehicle $1.8 billion ($360 million per year for first 5 years) Other related costs$1 billion ($200 million per year for first 5 years) Operating and maintenance 10 cent*annual ridership* # of total kilometers of the route (increases by 20% every ten years) Vehicle replacement$70 million outflow at year 16 Parking construction$3 million Operating and maintenance for parking $2.83 million per year (increases by 20% every ten years) Interests on bondsPrincipal*annual interest rate

Financing of the Initial Project Total initial Cost: $2.8 Billion 1.6 billion 575 million 500 million 125 million

Cost Analysis Year0 Beginning 5 Full completion 16 Veh.repla- cement 20 Last year of bonds 30 End of Project Infrastructure$ Other related costs$ Operating and maintenance -$102.76$ $ Vehicle replacement --$70-- Parking construction $3---- O&M for parking-$2.84$3.41 $4.09 Interests on bonds-$35 $535- (In Million)

Cost Allocation NPV of Total Cost: $3, Million

Benefit Methodology Revenue from riding (real revenue) Fare*Ridership (Increase at 10-year interval) Revenue from parking (real revenue) Fee*Ridership (Increase at 10-year interval) Value of time saved$10.88*1.3hr saved*70%Ridership Energy savingsFuel cost/mile*Miles of Maglev*70%Ridership Savings from air pollutionAir pollution cost/mile*Miles of Maglev*70%Ridership

Benefit Analysis Year3 Partial completion 5 Full completion 1020 Last year of bonds 30 End of project Revenue from riding $23.02$108.17$115.89$148.35$ Revenue from parking $9.75 $10.40$11.05 Value of time saved $82.87$113.87$143.43$152.99$ Energy savings $22.03$35.59$38.13$40.67$43.21 Savings from air pollution $5.56$8.35$8.99$5.78$3.70 (In Million)

Benefit Allocation NPV of Total Benefit: $2, Million

Cost-Benefit Analysis Net Social Benefit = Total Benefit – Total Cost Total Benefit$2,815.57Million Total Cost$3,657.12Million Net Social Benefit-$841.55Million Total Benefit$1,160.99Million Total Cost$3,657.12Million Loss-$2,496.13Million Profit/Loss = Revenue – Cost

Synthesis Analysis

Synthesis Discount rate Bond coupon rate Percentage of bonds issued Total cost Fare Price Economic development

Discount Rate Break-even discount rate: 4.27%

Percentage of Bond Issued

Bond Coupon Rate

Total Cost Base Case 50% increase 100% increase

Fare Price (In Million)

Economic Development

Conclusion

Circumstances that Warrant Investment in Public Project When society’s resources are under utilized When public funds are idling and can be invested When the potential project will lead to a higher level of productivity than any competing project

Economic Impact Maglev Productivity Multiplier Effects Benefits Investment Productivity Multiplier Effects Benefits Investment Alternative Investment

The Maglev Project Vision

Conclusion Maglev is a worthy pursuit, although the CBA study does not directly reflect this conclusion “Sometimes the numbers do lie!” Professor Shawn Buckner, Clinton School, Hovard University

Thank you Afshan  Shawn  Chia-Hui  Poonsri Prof. Strauss