K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, Neutrino Factory and Muon Collider Collaboration meeting Sergei.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves.
K. McDonald 2 nd Oxford-Princeton Targetry Workshop 6 Nov 2008 High-Power Targets for Superbeams and Neutrino Factories (and Muon Colliders) K.T. McDonald.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
KT McDonald 4 th High-Power Targetry Workshop May 2, The High-Power Target System for a Muon Collider or Neutrino Factory K. McDonald Princeton.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
K. McDonald EURO Meeting 26 Mar 2009 High-PowerTargets for Neutrino Beams and Muon Colliders K.T. McDonald Princeton U. EURO Meeting CERN, March 26, 2009.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Euro -IDS-NF Target Meeting Dec nd Oxford-Princeton Workshop on High-PowerTargets Held at Princeton U. Nov 6-7, 2008 O-P Workshop.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Managed by UT-Battelle for the Department of Energy Follow-on MERIT Testing at ORNL Van Graves NFMCC Friday Meeting Feb 29, 2008.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
Target R&D Kirk T McDonald Princeton University Feb. 19, 2014 February 19, 2014 KT McDonald | DOE Review of MAP (FNAL, February 19-20, 2014)1 Scope of.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Thermomechanical characterization of candidate materials for solid high power targets Goran Skoro, R. Bennett, R. Edgecock 6 November 2012 UKNF Target.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
K. McDonald NFMCC Collaboration Meeting Jan 2009 High-PowerTargets for Neutrino Beams and Muon Colliders K.T. McDonald Princeton U. NFMCC Collaboration.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
K. McDonald NFMCC Collaboration Meeting Jan 14, The Capture Solenoid as an Emittance-Reducing Element K. McDonald Princeton U. (Jan. 14, 2010)
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN High-Power Targetry Workshop Oak Ridge, TN October 10, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Simulation of High-Power Mercury Jet Targets for Neutrino Factory and Muon Collider R. Samulyak, 1,2 H.C. Chen, 1 H.G. Kirk, 2 K.T. McDonald 3 1 Stony.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Target R&D A.Fabich, CERN 30.July 2004 A.Fabich, CERN.
Horn and Solenoid Options in Neutrino Factory
MERIT Scientific goals and importance
Target and Horn status report
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Presentation transcript:

K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab, April 22, 2008 Targetry Web Page: Syringe Pump Secondary Containment Jet Chamber Proton Beam Solenoid

K. McDonald LEMC Workshop 22 Apr 2008 Targetry Challenges of a Muon Collider Palmer (1994) proposed a solenoidal capture system. Low-energy  's collected from side of long, thin cylindrical target. Collects both signs of  's and  's,  Shorter data runs (with magnetic detector). Solenoid coils can be some distance from proton beam.   4-year life against radiation damage at 4 MW.  Proton beam readily tilted with respect to magnetic axis.  Beam dump (mercury pool) out of the way of secondary  's and  's. Desire   /s from  p /s (  4 MW proton beam). Highest rate  + beam to date: PSI  E4 with  10 9  /s from  p /s at 600 MeV.  Some R&D needed!

K. McDonald LEMC Workshop 22 Apr 2008 A Carbon Target is Feasible at 1-2 MW Beam Power Low energy deposition per gram and low thermal-expansion coefficient reduce thermal “shock” in carbon. Operating temperature > 2000 C if use only radiation cooling. A carbon target in vacuum would sublimate away in 1 day at 4 MW, but sublimation of carbon is negligible in a helium atmosphere. Radiation damage is limiting factor:  12 weeks (?) at 1 MW.  Carbon target is baseline design for most neutrino superbeams.} Useful pion capture increased by compact, high- Z target,  Continued R&D on solid targets.

K. McDonald LEMC Workshop 22 Apr 2008 Neutrino Factory Feasibility Study 2 Infrastructure studies based on SNS mercury target experience. Should be extended during the Muon Collider Feasibility Study. Considerable engineering support needed to go beyond Study 2. ORNL/TM-2001/124, P. Spampinato et al.

K. McDonald LEMC Workshop 22 Apr 2008 Features of the Study 2 Target Design Mercury jet with 1-cm diameter, 20 m/s velocity, at 100 mrad to magnetic axis. Proton beam at 67 mrad to magnetic axis. Iron plug at upstream end of capture solenoid to reduce fringe-field effect on shape of free jet. Mercury collected in a pool in ~ 4 T magnetic field. Issues: Jet quality after emerging from long cylindrical nozzle in iron plug. Splash in mercury pool should not extend up into nominal beam region.

K. McDonald LEMC Workshop 22 Apr 2008 CERN nToF11 Experiment (MERIT) The MERIT experiment was a proof-of-principle demonstration of a free mercury jet target for a 4-megawatt proton beam, contained in a 15-T solenoid for maximal collection of soft secondary pions. MERIT = MERcury Intense Target. Key parameters: 24-GeV Proton beam pulses, up to 16 bunches/pulse, up to 2  p /bunch.  r of proton bunch = 1.2 mm, proton beam axis at 67 mrad to magnet axis. Mercury jet of 1 cm diameter, v = 20 m/s, jet axis at 33 mrad to magnet axis.  Each proton intercepted the Hg jet over 30 cm = 2 interaction lengths. Every beam pulse was a separate experiment.  360 Beam pulses in total. Varied bunch intensity, bunch spacing, no. of bunches. Varied magnetic field strength. Varied beam-jet alignment, beam spot size.

K. McDonald LEMC Workshop 22 Apr 2008 CERN was Proof of Principle not Prototype CERN used a 180  bend in the mercury delivery path because CERN would not permit any mercury-wetted connections to be made onsite Syringe Pump Secondary Containment Jet Chamber Proton Beam Solenoid

K. McDonald LEMC Workshop 22 Apr 2008 CERN nToF11 Experiment (MERIT), II Data taken Oct Nov.12, 2007 with mercury jet velocities of 15 & 20 m/s, magnetic fields up to 15 T, and pulses of up to 3  protons in 2.5  s. As expected, beam-induced jet breakup is relatively benign, and somewhat suppressed at high magnetic field. “Pump-Probe” studies with bunches separated by up to 700  s indicated that the jet would hold together during, say, a 1-ms-long 8-GeV linac pulse.  Good success as proof-of-principle of liquid metal jet target in strong magnetic fields for use with intense pulsed proton beams.

K. McDonald LEMC Workshop 22 Apr 2008 Post-MERIT Liquid Target Issues MHD simulations Optimize performance of nozzle in Fe plug Eliminate bend Splash in liquid pool beam dump Particle production Rep-rate delay limits Use of a Pb-Bi alloy rather than Hg Target station engineering Study these issues in context of IDS/MCFS

K. McDonald LEMC Workshop 22 Apr 2008 Issues from MERIT: Jet Quality, Vertical Height 0 T 10 T Jet quality poor in zero magnetic field, and improves (as expected) with increasing field. Jet vertical height times nozzle diameter, and little affected by magnetic field. Simulations predict that vertical expansion of jet would be small, and would vary as B 2. Suggests that 180  bend before nozzle leads to vertical expansion of jet. Interesting hydrodynamic issues, but may be best to focus of aspects relevant to Factory/Muon Collider – where no 180  bend is contemplated.

K. McDonald LEMC Workshop 22 Apr 2008 Could Reuse MERIT Equipment to Study Jet Issues without Beam At a facility suitable for more general handling of mercury, could connect the mercury test volume to the mercury pump by hoses so that mercury enters at one end of magnet and exits at the other. Could study jet quality in nozzles with no sharp bends. Could use optical diagnostics with both side and top views. Could add iron plugs to the MERIT magnet to study effect of field on a jet at 100 mrad (instead of 33 mrad as in CERN). Could also study collection of the jet in a mercury pool.

K. McDonald LEMC Workshop 22 Apr 2008 Option for Follow-On Studies at ORNL A new fusion test facility in bldgs 7625, 7627 will be completed in late Several 10-MW power supplies available. LN 2 dewar 20-t overhead crane, equipment pit. Could begin with zero field studies (nozzle optimatization, Hg splash in pool,….) Eventual option to use MERIT magnet at 15 (or 20!) T. Bldg 7625Bldg 7627 Vertical field power supplies (capability of each) 650V peak 15,000 A pulsed > 5 sec Voltage and/or current can be controlled by SCR gate waveform control

K. McDonald LEMC Workshop 22 Apr 2008 Lead-Bismuth Alloys Lead-bismuth alloys are solid are room temperature, but liquefy at  C. Easier to contain a target “spill” if material solidifies at room temperature. More radioisotope production with Pb-Bi than with Hg (but “trivial” compared to a reactor). Boiling of liquid target by proton beam (> 4 MW) less of an issue than with mercury. Design studies for MERIT-like tests mandated by the NFMCC. Some Pb-Bi alloys wet quartz, so difficult to use with optical diagnostics. Woods metal (Low 158) does not wet glass (Palmer), but contains cadmium. Pb-Bi-Sn alloys melt as low as 95  C. Lab tests will be done soon on wetting of quartz by several low melting alloys.

K. McDonald LEMC Workshop 22 Apr 2008 Summary Liquid-target MHD simulations are ongoing and should continue to be supported. Studies of radiation damage of solid-target candidates are ongoing, largely without NFMCC support. Systems engineering of a 4 MW target facility should be supported in the context of the IDS and/or Muon Collider Feasibility Study. Hardware studies of jet (and splash) quality in configurations close to those of Feasibility Study 2 could be performed with MERIT equipment at ORNL. Preliminary studies for use of a liquid Pb-Bi alloy are underway. Next Targetry Workshop: 1-2 May, 2008, Oxford, UK