1 Invenergy. 2 Invenergy Introduction Developer, owner and operator of power generation projects. Focused on the development of renewable energy and natural.

Slides:



Advertisements
Similar presentations
1 Siting, Real Estate and Interconnection Issues for Wind Projects Tim Conboy IPED Financing Windpower May 8, 2008.
Advertisements

WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
New York State Jack Nasca, New York State Department of Environmental Conservation GLWC Offshore Wind Workgroup Advancing Regional Collaboration Webinar.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
The Role of State, Local and Tribal Governments in the Federal NEPA Process Presented by Susan E. Bromm Director, Office of Federal Activities United States.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
IRWA 2013 Federal Agency Update Bureau of Land Management (BLM) U.S. Forest Service (USFS) Energy Corridors & Rapid Response Team.
Oil & Natural Gas Development in the West: Thoughts on Improving the Process 2014 Utah Governor’s Energy Summit Ursula Rick, PhD June 4, 2014.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Western States Energy & Environment Symposium October 27, 2009.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
Case Study Milford Wind Corridor Project Presenter: Lucas Lucero, Washington Office Project Manager Phone:
Renewable Energy and the BLM May 4, 2009 Ashley Conrad-Saydah BLM Renewable Energy Project Manager.
Terra-Gen Power, LLC California Renewables Portfolio Standards: Challenges and Opportunities CCPUC Annual Meeting October 5, 2009.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
The Role of the Project Proponent in the NEPA Process PUBLIC LANDS ADVOCACY NEPA & PERMITTING SEMINAR Zeke Williams June 11, 2008.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Marine Spatial Planning for Wave Energy Development in Oregon Kate Sherman, M.S. Candidate Marine Resource Management College of Earth, Ocean, and Atmospheric.
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Designing for Renewable Energy A View From Arizona BLM Jim Kenna April 2010.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Paint Product Stewardship Initiative Chicago, IL September 20-21, 2004.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Renewable Energy Challenges -an Air Force view 1 Ken Gray Energy Rates.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
On Site Review Overview. 2 The On Site Review Process.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
Electric Transmission Lines and Utility Corridors.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Lynne Welsh Massachusetts Department of Environmental Protection.
Defenders of Wildlife Species we are helping to protect.
MGE ISSUES. 2 ENERGY 2015 MGE’s plan to meet the energy needs of our customers Solicit customer input Community Energy Conversations.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Strategic Planning Linked to Long Range Planning Presentation to Faculty and Staff February 13-14, 2008
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Kitsap County ▪ Jefferson County ▪ City of Bremerton Naval Base Kitsap ▪ Naval Magazine Indian Island
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Environmental Business Council: RI Wind Energy Planning Dennis J. Duffy VP-Regulatory Affairs May 25, 2006.
2009 Federal Environmental Symposium East June 16-18, 2009 Bucky Green, EPA Sustainable Facilities Practices Branch Matt Sawatzki, Booz Allen Hamilton.
CLIMATE CHANGE POLICY IN THE ARCTIC THE CASES OF GREENLAND, NUNAVUT AND THE ICC Dr. Natalia Loukacheva
Energy Policy Act – 2005 West-Wide Energy Corridors.
Arizona State Technical Committee Meeting October 15 th, 2014 Steve Smarik State Resource Conservationist.
RE-Powering America’s Land: Siting Renewable Energy on Potentially Contaminated Land, Landfills and Mine Sites.
Solar Electricity Generation: Government Leading by Example in Solar Deployment Federal Environmental Symposium June 5, 2007 U.S. Department of Energy.
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Creating a Market for New Investment in Biomass Renewable Energy Generation Capacity Presented by Steven Jay Mueller President – DG Energy llc
SEPTEMBER 10, 2013 JENNIFER MACARTHY BUTTE COUNTY ECONOMIC & COMMUNITY DEVELOPMENT MANAGER Butte County Regional Economic Development Strategy.
Presentation transcript:

1 Invenergy

2 Invenergy Introduction Developer, owner and operator of power generation projects. Focused on the development of renewable energy and natural gas energy projects. Invenergy management team is headquartered in Chicago with regional offices in Austin, Denver, Minneapolis, Washington D.C. and international offices in Toronto and Warsaw. At the end of 2009, Invenergy was the 6 th largest owner/operator of wind energy facilities in the United States.

3 Invenergy Wind and Thermal Portfolio - Map

4 Invenergy Solar Development More than 400 MW of solar projects in development and 20 MW under contract Projects range in size from 1 to 200 MW Technologies: PV, CPV, Solar Thermal, Solar/Combined Cycle Hybrid Majority of projects located in the Western U.S.; remaining projects located in states having renewable portfolio standards with attractive solar “carve-out” provisions or in international locations with attractive incentive regimes.

5 The BLM Wind Development Process Siting Issues/ Understanding Developer Needs Right of Ways Resource Management Plans/ Land use issues Visual Resource Management Environmental Studies/ Agency Coordination Plans of Development Environmental Impact Statements Government/Private Sector Cultural Differences/ Relationships and Expectations

6 Siting Wind Development in the Western US on Federal Land Limited Site Availability Viable Wind Resource Land Use Restrictions on Federal Land Transmission Limited network on remote BLM lands Private Developers do no have resources Linear ROW Applications for Project GenTie Access to Market

10 Right of Way Grants Type II Wind Development Lease Applications Developer begins research/scouting May 2010 SF-299 with Met Tower Locations identified Request received in August 2010 Botanical Survey in June 2011 ROW Grant might be issued in September 2011, Met Towers installed October Rarely is the 3 year term granted under a STAMPA Type II ROW Grant Adequate

11 Resource Management Plans Do they address energy development? Many older plans created before renewable energy was issue ACECs – purpose of the ACEC, is it compatible with renewable energy development VRMs- might be most common conflict found between renewable energy development and existing land use designations –ROW issue Concurrent EIS/RMP Amendment Process

13 Environmental Studies/ Agency Coordination Coordination between the BLM Field Staff and Developer essential Development of comprehensive study plan early in process is critical Consultations with Responsible Agencies/ Agency buy in critical Documentation of Agency Consultations/ buy in State or Local cooperation critical for Joint Document type permitting tracks

14 The Plan of Development POD Requirements When should a POD be submitted? Post Resource Study-Developer completes all baseline studies first, then submits POD POD is submitted first then Third Party EIS Contractor completes studies as part of the EIS Process Scoping Issues without Baseline Data

15 Environmental Impact Statements Explanation of process, timeline, responsibilities to developer Selection of third party contractor/ who contracts with who? Public Scoping/ Developer role in process Joint Documents/ Three Party MOU between Developer/BLM/State or Local Permitting Agency or two party MOU

16 Government and Private Sector Conflicts Cultural Differences Time Horizons Balance between long term view of Stewardship of Public Resources vs. Private Sector need to move forward or die Limited private sector resources, often time is most limiting factor for Private Sector Encourage Developer to become stakeholders and participate at every level