Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Polarized Photon Beam Instrumentation for GlueX Part 1: active collimation Part 2: polarimetry Richard Jones, University of Connecticut GlueX collaboration.
Collimation and tagging instrumentation for the GlueX photon beamline Richard Jones Igor Senderovich, Anne-Marie Carroll University of Connecticut APS/DNP.
June Yong Yang, Nuclear physics site Mentor : Dr. Richard Jones.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
James M c Intyre University of Connecticut GlueX Collaboration Meeting JLab, Feb. 2-4, 2011.
Active Collimator Test in Hall B Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting September ,
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Beam Position Stabilization Using an Active Collimator in Hall D at Jefferson Lab Richard Jones, University of Connecticut, for the GlueX collaboration.
Simulation of electron beam halo in the Hall D tagger Richard Jones University of Connecticut GlueX collaboration meeting, Newport News, March 29-31, 2007.
Electron Beam Simulation for GlueX Richard Jones, University of Connecticut GlueX collaboration meeting April 27-29, 2006 presented by.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
The Hall D Photon Beam Richard Jones, University of Connecticut Hall D Photon Beamline-Tagger ReviewJan , 2005, Newport News presented by GlueX Tagged.
Tagger hodoscope and photon beam monitoring D.Sober, F.Klein (CUA) Tagger Review, Jan.23-24, 2006.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
The GlueX Photon Beam Richard Jones, University of Connecticut GlueX Photon Beamline-Tagger ReviewJan , 2005, Newport News presented by GlueX Tagged.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
The Hall D Photon Beam Overview Richard Jones, University of Connecticut Hall D Tagger and Beamline ReviewNov , 2008, Newport News presented by GlueX.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Tagging Near the End-Point Richard Jones, University of Connecticut GlueX Collaboration Meeting, Newport News, May 8-10, Current design capabilities.
Experimenting with Quarks Prof. Richard Jones University of Connecticut, Storrs Science Symposium, Darien High School, May 28, 2008.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
Photon Beam and Tagger working group status report Richard Jones Catholic University Glasgow University University of Connecticut University of Connecticut.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The Hall D Photon Beam Overview Richard Jones, University of Connecticut Hall D Tagged Photon Beam ReviewNov , 2008, Newport News presented by GlueX.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Elton S. Smith Tagger and Photon Beam Dry Runs Nov 14, Tagger and Photon Beamline Review and goals for today.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Overview of the GlueX Tagger and Photon Beamline..
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
Photon Flux Control Liping Gan UNCW. Outline PrimEx-  experiment requirement Tagged photon Procedure to obtain the number of tagged photons Relative.
Start and Vertex Detector W. Boeglin, A.Klein Current Design: 3300 scintillating fibers 1mm diameter 3 double layers (1 axial, 2 stereo) cylindrical geometry.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
B. Azadegan, S. A. Mahdipour Hakim Sabzevari University
Hall D Tagger and Beamline Review, Nov , 2008, Newport News1 Question Question: How can you reliably extract the polarization of the collimated beam.
Photon Source and Tagger Richard Jones, University of Connecticut GlueX Detector ReviewOctober 20-22, 2004, Newport News presented by GlueX Tagged Beam.
SPring-8 レーザー電子光 ビームラインでの タギング検出器の性能評価 核物理研究センター 三部 勉 LEPS collaboration 日本物理学会 近畿大学 1.レーザー電子光 2.タギング検出器 3.実験セットアップ 4.エネルギー分解能 5.検出効率とバックグラウンドレート.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
Collimation and tagging instrumentation
IHEP group Shashlyk activity towards TDR
Polarimetry Ken Livingston Sept 2012
MAGIX Detectors Overview
CLIC damping rings working plan towards the CDR
The Hall D Photon Beam Overview
East Hall under construction
Presentation transcript:

Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting September , Storrs

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 2 Dates design and simulation position stability specification prototype construction test setup in Hall B alcove results with Hall B photon beam recommendations

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 3 Draft agenda 08:00-09:00 Executive session 09:00-09:15 Charge – 12 GeV team 09:15-09:45 Overview – GlueX 09:45-10:00 Break 10:00-10:20 12 GeV Electron Beam – Accelerator 10:20-10:50 Photon Beam Overview – GlueX 10:50-11:10 Beam Simulations – GlueX 11:10-11:30 Personnel and Machine Safety – 11:30-12:00 Photon Beam Line – GlueX 12:00-13:00 Lunch 13:00-13:15 Tagger Optics – GlueX 13:15-14:00 Magnet Design – GlueX 14:30-15:00 Fixed Array Hodoscope – GlueX 15:30-15:45 Break 15:45-16:15 Microscope – GlueX 16:15-17:00 Diamond Research – GlueX 17:00-17:30Pair spectrometer – GlueX 17:30-18:00 Executive session very squeezed to fit into 1 day

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 4 Overview – 30 minutes Introduction to GlueX Physics justification Justify energy and polarization Overall schedule Budget and manpower

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 5 12 GeV Electron Beam – 20 minutes Overview of accelerator upgrade Progress toward boosting cavity performance Electron beam energy determination 12 GeV beam emittance – and how to know it Beam transport to the tagger hall and optics Interface with tagger – accelerator side Post-tagger beam transport and dump Beam line instrumentation Beam stability and active collimator feedback Expectation for beam halo

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 6 Photon Beam Overview – 30 minutes Systematics of coherent bremsstrahlung Polarization and energy spectra Importance of energy Importance of emittance Machine interface document Requirements for the tagger Requirements for the pair spectrometer Requirements for the collimation system

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 7 Beam Simulations – 20 minutes Tagger area: – background count rate in focal plane counters – specification on electron beam halo – scattering at beam exit from tagger vacuum chamber – background from dump Cave extension area: – active collimator design and performance – shielding optimization in the collimator cave – backgrounds in the pair spectrometer – background in core of photon beam, impact on GlueX

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 8 Photon Beam Line – 30 minutes Layout of equipment in tagger hall – vacuum system – 3D model – instrumentation – alignment – installation – cost+schedule Layout of collimator cave – shielding issues – 3D model – installation plan – alignment – cost + schedule

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 9 Tagger Optics – 15 minutes Opera model Ray tracing results Optimal location for tagging counters Quadrupole and vertical focusing

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 10 Tagger Magnet Design – 45 minutes Change to one magnet design Layout and assembly of magnet and vacuum system Alignment plan Force calculations deflections tolerances Review of specs and drawings Instrumentation Power supply Mapping Schedule

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 11 Fixed Array Tagger Hodoscope – 15 minutes Coverage and segmentation Readout, resolution and rates Crystal alignment considerations End-point tagging Support structure and alignment

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 12 Tagger Microscope – 30 minutes Coverage and segmentation Scintillating fiber geometry Readout, resolution and rates Vertical readout and collimation Tagging efficiency and backgrounds Support structure and alignment

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 13 Diamond Research – 45 minutes Thickness criteria: performance vs. lifetime Diamond assessment with X-rays Challenge of producing 20 micron radiators Assessment with X-rays Development plan

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 14 Pair Spectrometer Design – 30 minutes Specification Choice of magnet Design of vacuum system and shielding Counter segmentation and resolution Rates and background

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 15 Recommendations from 2006 review 1.The Collaboration should work closely with the 12 GeV Accelerator Project Team to insure that the electron beam emittance, positioning, stability, and halo match the requirements of the experiment 2.The Collaboration should revisit the time resolution requirement for the tagger hodoscope system to optimize the rejection of accidental coincidences (σ ≤200 ps seems to be a reasonable goal). 3.Complete the Monte Carlo simulation of the background in the tagging counters caused by backscattering from the dump or the beam line 3.Complete the Monte Carlo simulation of the background in the tagging counters caused by backscattering from the dump or the beam line. 4.Consider a clamped Al foil with an O-ring seal for the vacuum chamber exit window. 5.To enable an online monitoring of the vertical electron distribution in the focal plane, the count rate distribution of (at least some of) the microscope detectors outside of the mid-plane should be read out, too.

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 16 Recommendations from 2006 review 6.Include the energy calibration of the tagging system in the commissioning plan. 7.Include as an option in the procurement strategy the possibility that different manufacturers produce the tagging spectrometer components, and that these components are assembled at JLab for the first time. 8.The Collaboration should work closely with the 12 GeV Civil Construction Project Team to make sure that the tagger area dimensions and the access to the area are consistent with the planned assembly and alignment strategy for the tagging system components. 9.Contact rigging and alignment services at JLab to make sure that the planned assembly and alignment strategy for the tagging system is feasible and consistent with the best practices of those groups. 10.The possibility that the system will have to be disassembled should be included in the design studies.

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 17 Issues to resolve before review Pair spectrometer – energy calibration precision, absolute accuracy – polarimetry precision from spectral analysis Active beam position stabilization plan – conceptual design that accel. group agrees with Passive collimators design optimization – replace outer layers with lead, test with simulation Redo tagger background studies – get revised halo model from CASA – redo the background simulation – cpu intensive!

GlueX Collaboration Meeting, September 18-20, 2008, Storrs 18 Issues to resolve before review Flesh out plan for diamond development – vendors with thinning capability – manpower Assemble pre-brief materials Assign and write talks