© SPI PARTNERS, 2003, www.spipartners.nl 1 ESEPG Conference London, 2003 - Tutorial Tom Gilb & Simon Porro How Competitive Engineering (Tom Gilb) Supports.

Slides:



Advertisements
Similar presentations
CMMI Arnon Rotem-Gal-Oz. The kings Ship Wasa No Specification No Specification No Architecture description No Architecture description Changes.
Advertisements

Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Implementing CMMI® for Development Version 1.3
CMMI Course Introduction CMMI course Module 0.
SPIN-BG Seminar 1.Overview of CMMI Model changes 3.SCAMPI method changes 4.Training changes 5.CMMI Architecture Author: Kiril Karaatanasov
National Cheng-Kung University
Kelemen Zádor Dániel  About ISO 9001: 2000  About CMMI v1.2  Main differences  Differences in terminology  Similarities 
Capability Maturity Model Integration CMMI®
CMMI FOR SMALL BUSINESS PILOT – ASI KICKOFF MEETING
1 Software Process Models Lawrence ChungSoftware Engineering.
Painless Transition From SW- CMM Level 2 to CMMI Level 3 Ruth Berggren EDS EIT, Enterprise Processes and Solutions Ruth Berggren EDS EIT, Enterprise Processes.
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
1 Intro to the CMMI (Capability Maturity Model Integration) Management Overview.
1 Presenter: Tracy Wessler June 6, 2007 Outsourcing Quality Assurance and Contract Surveillance Activities U.S. Census Bureau Decennial Response Integration.
SM CMM Integration, SCAMPI, SCAMPI Lead Assessor, SCAMPI Lead Appraiser, and SEI are service marks of Carnegie Mellon University.  CMM and CMMI are registered.
ITIL, CMMI, MOPS, six-Sigma, LEAN.... (where to start?) A Voyage Thru the Acronyms. Methodologies for managing IT Dennis Adams a s s o c i a t e s Management.
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
Process Area : Requirement Management (REQM) By: Amna Rehmat Maria Habib Sana Ahmed.
CMMI December 3rd 2014.
CS 577b Software Engineering II -- Introduction
CS 577b Software Engineering II -- Introduction
Space and Airborne Systems NDIA/SEI CMMI Technology Conference Presented by N. Fleischer 1 Raytheon’s Six Sigma Process and Its Application for CMMI By.
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
SPIN-BG Seminar Intermediate Concepts of CMMI
Capability Maturity Model Integrated
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
Copyright © 2009, Systems and Software Consortium, Inc. Introduction to an Integrated Lean Thinking, Six Sigma  and CMMI  Approach for Process Improvement.
8. CMMI Standards and Certifications
Light-Weight CMMI (Capability Maturity Model Integration ) Stage 1: Requirement Development and Project Planning For NSC Open Source Projects Dr. Chaw-Kwei.
Process Assessment Motivation SEI Capability Maturity Model
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
Capability Maturity Model Integration for Development Prof. Dr. ir J
Methodologies for managing IT A Voyage through Acronyms Dennis Adams a s s o c i a t e s UK Oracle User Group Conference 2007 Dennis Adams 4th December.
『华东师范大学』 课程名称: 软件开发实践 Software Development Practice 课程类型: 实践课 第二讲: 项目管理 Lect_02: Manage the Project 主讲 : 软件学院 周勇 副 教授 日期 :
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
Adaptive Processes Overview Adaptive Processes©. Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better2 Objective To provide an over view of.
Application of the CMMI SM to Plan and Control Life Cycle Costs Dr. Mary Anne Herndon Science Applications International Corporation (SAIC) November, 2003.
1 © Mahindra Satyam 2009 Mahindra Satyam Confidential Welcome To CMMI Introduction.
SMU SELAB Joo mi Yang Master of Science course at SangMyung University in Republic of Korea CMMI Compliance.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
January 2003 CMMI ® CMMI ® V1.1 Tutorial Sponsored by the U.S. Department of Defense © 2003 by Carnegie Mellon University SM CMM Integration and SCAMPI.
1 / 25 IPM CMMI Integrated Project Management (IPM) Dieter De Paepe & Sarah Bourgeois.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
Guidelines for Process
CMMI November 25 th Copyright © 2015 Accenture All rights reserved. The aim of the presentation is to introduce Capability Maturity Model Integrated.
1 Overview of Maintenance CPRE 416-Software Evolution and Maintenance-Lecture 3.
9 th Annual National Defense Industrial Association CMMI Technology Conference and User Group November 18, 2009 Denver, Colorado, USA Bill Smith, CEO Leading.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
Space and Airborne Systems Prepared For 3rd Annual CMMI Technology Conference Presented In Denver, CO Tom Cowles November 19, 2003 Peer Reviews For CMMI.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
Figures – Chapter 26. Figure 26.1 Factors affecting software product quality.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
CS 577b Software Engineering II -- Introduction
Capability Maturity Model Integration
CMMI November 22nd 2017.
Level - 3 Process Areas (CMMI-DEV)
CS 577b Software Engineering II -- Introduction
CMMI November 2018.
Experiences with a Single PA SCAMPIsm
Engineering Processes
Project Management Group
Presentation transcript:

© SPI PARTNERS, 2003, 1 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro How Competitive Engineering (Tom Gilb) Supports CMMI Implementation Simon Porro Systems Performance Improvement Consultant CBA-IPI Lead Assessor tel: +31.(0) Download this presentation & CE-CMMI excel-sheet from

© SPI PARTNERS, 2003, 2 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Competitive Engineering versus CMMI Competititive Engineering is an Engineering handbook: It provides concrete processes how to develop systems The Competitive Engineering processes fulfil several of the requirements of CMMI. This presentation gives an overview of how CE-concepts and processes support the implementation of CMMI. The presentation assumes your basic understanding of the CE processes. CMMI is not an engineering handbook, but a process model with requirements for processes, which are categorized and specified in Process Areas, Goals and Practices. The CMMI practices are based on good engineering discipline. In the past 30 years, Tom Gilb contributed to establishing this engineering discipline. Now common terms in the CMMI like Software Metrics (1976), Software Inspection (1993), Evolutionary Delivery (1988) and Defect Prevention have been introduced and/or promoted by Tom in the past three decades.

© SPI PARTNERS, 2003, 3 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Competitive Engineering Book Chapters 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control 9. Impact Estimation 10. Evolutionary Project Management Topics in this Presentation Quantification of Objectives, Requirements, Value Requirements & Design EVO delivery Project & Risk Management Impact Estimation Specification Quality Control CE Support for Generic Goals and Practices

© SPI PARTNERS, 2003, 4 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Quantification of Objectives, Requirements, Value Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control 9. Impact Estimation 10. Evolutionary Project Management CMMI ML-2: M&A (quanitfy objectives) ML-2: SAM (accept against measurable requirements) ML-3: OPF (quanitified PI objectives) ML-3: OEI, IPM, IT (shared visions) ML-3: ISM (analyze sources of products) ML-3: RSKM (define (quantified) risk parameters) ML-3: RD, TS (quantify requirements & design) ML-3: VER, VAL (against quantified requirements) ML-4: OPP (org. process & quality objectives, measures) ML-4: QPM (select project’s quantitative objectives)

© SPI PARTNERS, 2003, 5 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro RD RM CMMI: The REQM, RD and TS Partnership TS

© SPI PARTNERS, 2003, 6 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Requirements & Design Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control 9. Impact Estimation 10. Evolutionary Project Management CMMI ML-2: REQM - whole PA (CE: Requirements + EVO + IE) ML-3: RD: - whole PA (CE: Requirements + Design + Function + Performance) ML-3: TS: - whole PA (CE: Requirements + Design + IE + Resources, budget, costs)

© SPI PARTNERS, 2003, 7 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro RD EVO & IE: RM, PP, PT, VAL EVO Delivery and CMMI Engineering PA’s TSPI

© SPI PARTNERS, 2003, 8 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Project & Risk Management in CE Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control 9. Impact Estimation 10. Evolutionary Project Management ML-2 PP: REQS.Objectives EVO plans IE: priority setting ML-2 PMC: Monitoring: EVO and IE IE: Reprioritizing ML-2 SAM: Monitoring supplier: EVO and IE ML-3 RSKM: IE ML-3VAL: Embedded in EVO process Complete Focus on Early Value Delivery to stakeholders and Early Learning !!

© SPI PARTNERS, 2003, 9 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Impact Estimation (IE) Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control 9. Impact Estimation 10. Evolutionary Project Management CMMI Analyze … ML-3: DAR (Evaluate alternative solutions, ROI, Risks) ML-3: TS (Evaluate alternative solutions) ML-3: RD (analyze reqs to achieve balance) ML-3: RSKM (Estimate risks and impacts) ML-3: VAL (Analyze validation results) ML-3: ISM (analyze, ML-2: REQM (Manage changes - estimate impact) ML-2: PP (Identify risks, reconcile work and resource levels) ML-2: PMC (monitor progress and risks) ML-2: SAM (select suppliers, review COTS products)

© SPI PARTNERS, 2003, 10 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Specification Quality Control Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control - Defect Detection Process (DDP) - Defect Prevention Process (DPP) 9. Impact Estimation 10. Evolutionary Project Management CMMI ML-3: VER (SG2: Perform Peer Reviews) - [DDP] Review of work products ML-5: CAR (SG1: determine causes of defects) - [DPP]

© SPI PARTNERS, 2003, 11 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro CE Support for Generic Goals and Practices Competitive Engineering 1. Planguage 2. Requirements 3. Function 4. Performance 5. Scales 6. Resources, Budget, Costs 7. Design 8. Specification Quality Control - Defect Detection Process (DDP) - Defect Prevention Process (DPP) 9. Impact Estimation 10. Evolutionary Project Management CMMI GG2 GP 2.2: Plan the process GP 2.7: Manage stakeholders GP 2.8: M&C the process (IE, EVO) GP 2.10: Review with higher level management GG3 GP 3.2: Collect improvement information GG4 GP 4.1: Establish Quantitatve Objectives GP 4.2: Stabilize Subprocess Performance GG5: GP 5.1: Ensure Continuous PI GP 5.2: Correct Root causes of problems

© SPI PARTNERS, 2003, 12 ESEPG Conference London, Tutorial Tom Gilb & Simon Porro Overview CE Support for CMMI Process Areas CE processes are very powerful and effective, both for engineering and for managing process improvement