03/06/2015CARE SC College de France First steps of ELAN Frascati Workshop Financial aspects Joint meeting Steering Committee Joint meeting Steering Committee.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
1. 2 HIPPI at end Official end of the Activity in December 2008  no extensions will be considered. The remaining deliverables are due at the latest.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Roles & Responsibilities
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
2 nd Wind Seminar 28 September Project The Wind Atlas for South Africa project is an initiative of the South African Government - Department of.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
Co-ordination Action Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses, and their Vectors, in European Crops FOOD-CT
BA-DEGREE PROGRAMME: BANKING AND INSURANCE INDUSTRY UNIVERSITY OF APPLIED SCIENCES Welcome to: KICK-OFF MEETING GRAZ Financial Education Levering the Implementation.
Facilities Steering Committee Meeting 6 Welcome!
Webinar on Reporting and Evaluation for Museums for America Grantees January 6-8, 2009.
Policy and Research Committee Zoetermeer, November 18 th, 2011 Jeremy Candfield and Imrich Korpanec.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
AGILE: it’s aims, status, and activities 5th EC GIS Workshop “GIS of Tomorrow” Fred Toppen (University of Utrecht, The Netherlands) June 30, 1999 Stresa,
The South Africa I know, the home I understand. Introduction.
Welcoming and Training New Members to a Board of Directors.
Entrepreneurship Strategy CCI de Lyon February the 9th 2010 IMAGEEN.
Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January
SMART INCO-MED 1 st Management Board Meeting, June NCRS, Beirut DDr. Kurt Fedra ESS GmbH, Austria Environmental.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
SEARO –CSR Early Warning and Surveillance System Module Prioritization in EWAR Methodology and Objectives.
WP 9: 1 st Planning meeting summary Clarification between WP members of common objectives: Workshop planning and logistics with time- line Planning for.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
Erasmus Mundus Action 2 - Strand 1 Lot 1: Algeria, Morocco, Tunisia Erasmus Mundus - Al Idrisi: A scholarship scheme for exchange and cooperation between.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Tuesday Long Beach Cal SOAP College Prep Summer Camp.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
ERASMUS+ EMREX – Status report 1/2015 EMREX status template.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WORKSHOP GUIDELINES It is our pleasure to welcome you as a speaker at the 21st Cochrane Colloquium! We kindly ask you to follow the instructions below.
Steering group (SG) The SG will monitor the implementation of the project plan and control the operation in accordance with the Grant Contract. Coordination.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
WP8 Project management Milan Gocić University of Niš
AMICI WP1 – Management, coordination and dissemination
OPTIMALE OPTIMALE Optimising professional translator training in a multilingual Europe
University of Lapland as a Lead partner will be responsible for the
European Network for Novel Accelerators (EuroNNAc)
How far have we come? The implementation of the 2008
The NEW Distance Education Guidelines
TIARA Executive Office
Overview of the first project year
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
9/18/2018 Bids CONTRACTING Khamis…..
as of today 123 registered participants
The Joint Commission Web site home page –
The Joint Commission Web site home page –
Welcoming and Training New Members to a Board of Directors
Are we ready to move to the Creation Phase?
WP 10 Service Activities: Access to data products and knowledge
Marcello A. Giorgi Università di Pisa & INFN Pisa
Presentation transcript:

03/06/2015CARE SC College de France First steps of ELAN Frascati Workshop Financial aspects Joint meeting Steering Committee Joint meeting Steering Committee and Dissemination Board and Dissemination Board

03/06/2015CARE SC College de France First Steps ELAN SC by Phone each month with minutes Contacts with groups established 244 answers - 4 contractors: PSI, TEU Twente University, Enschede IPJ Soltan Institute, WUT-ISE Warsaw Univ. of Technology - 7 Associates: Annecy, Legnaro, Napoli, (E2V, TMD, DAN,TECUK in CCLRC) Format of ELAN in 2004, priority for: - Dedicated workshop in FRASCATI (site ready) - Full CARE meeting ELAN Web site started, visible from CARE

03/06/2015CARE SC College de France

03/06/2015CARE SC College de France Plans for the Frascati Meeting: 1 st day (Tuesday May 4 ) Plenary 9h-13h: - DS EUROTeV - ITRP J.E. Augustin - Presentation from 5 WP (including connections) Parallel + common(BDYN-INSTR, BDYN-ANAD) sessions between the 5 Work Packages WP Welcome Drink 18h30 2 nd day(Wednesday May 5 ) Parallel + common WP Critical discussion of our strategy (plenary in the afternoon) Dinner 3d day(Thursday May 6 ) Summaries of the 5 WP Steering Committee meeting

03/06/2015CARE SC College de France Sharing of Resources Money according to FTE but no ‘automatic’ sharing between sub-contractors DESY has formal agreements with sub-contractors but sums corresponds to upper limits Priority for general ELAN meetings but Lab ressources allow some flexibility, e.g. for specialized meetings and/or meetings with JRA Make sure that contractors have an agreement with their sub-contractors: mechanism ? Pragmatic attitude: evaluate at Frascati (at least 1 representative /lab)

03/06/2015CARE SC College de France Some unbalance in the number of participants/FTE for: CEA,ICL,UMA Statistics of ELAN