MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
MWPC Commissioning: A Status Report What the MWPC’s do and how Data taking Jan-Feb 2000 Results from the Analysis.
Chicago, January 8, 2002P. Colas - micromegas TPC1 A micromegas TPC prototype in a magnetic field Principle and advantages of a micromegas TPCPrinciple.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
1 Initial Tests of DHC Tower Update - 09/03/2003 Kurt Francis, Donna Kubik - Northern Illinois University.
TOF at 10ps with SiGe BJT Amplifiers
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
1 Small GEM Detectors at STAR Yi Zhou University of Science & Technology of China.
Status of DRIFT II Ed Daw representing the DRIFT collaboration: Univ. of Sheffield, Univ. of Edinburgh, Occidental College, Univ. of New Mexico Overview.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ICARUS General Trigger Design Contributions from: M.Della Pietra, A.Di Cicco, P.Di Meo, G.Fiorillo, P.Parascandolo, R.Santorelli, P.Trattino B.Baboussinov,
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Tools for Discovery CAEN solutions for Diamond Detectors June 24 th 2011, Viareggio Giuliano Mini.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
N. Morgan, Virginia Tech Qweak meeting,Oct ‘05 Region 2 Drift Chambers Status Report Qweak Collaboration Meeting October 2005.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
W-DHCAL Analysis Overview José Repond Argonne National Laboratory.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CERN, 18 december 2003Coincidence Matrix ASIC PRR Coincidence ASIC modifications E.Petrolo, R.Vari, S.Veneziano INFN-Rome.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
A Highly Selective Dilepton Trigger System Based on Ring Recognition Alberica Toia II Physikalisches Institut Justus-Liebig-Universität Gießen, Germany.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
CERN, May 9, 2001P. Colas - TPC, kick-off meeting1 Present and future TPC work at LBL-Orsay-Saclay Principle and advantages of a micromegas TPCPrinciple.
Trigger & Tracking detector for CMS
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Beam detectors performance during the Au+Au runs in HADES
Chapter 5. Signals and Noise
CTA-LST meeting February 2015
Present Read Out Chain for the PANDA Barrel DIRC
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Start Detector for pion experiments
Tracking results from Au+Au test Beam
Luminosity Monitor Status
Tassielli G.F. INFN Lecce & Università del Salento
Muon Recording Studies and Progress for the MICE Tracker
Front-end electronic system for large area photomultipliers readout
Shifter Instructions regarding the ZD, Dan Peterson
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
Engineering Design Review
Presentation transcript:

MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team

Why do we need MDC Trigger? Current Trigger is based on multiplicity in META detector Current Trigger is based on multiplicity in META detector Problem: Tracks have META hit but no MDC Information –> Events are useless Problem: Tracks have META hit but no MDC Information –> Events are useless : include MDC information in the trigger decision -> Gives about a factor of 2 more statistics : include MDC information in the trigger decision -> Gives about a factor of 2 more statistics

MDC Trigger Implementation Particles crossing any drift cell produce a signal on field/cathode planes Particles crossing any drift cell produce a signal on field/cathode planes Signal is collected at the HV input to the chamber (HV filter box) Signal is collected at the HV input to the chamber (HV filter box) Problem: Large capacitance –> low signal/noise ratio Problem: Large capacitance –> low signal/noise ratio MDC II MDC II stable chambers stable chambers short drift times (40 – 160 ns) short drift times (40 – 160 ns)

Status Cyprus Meeting Used field plane readout Used field plane readout Used analog summing of amplified signals Used analog summing of amplified signals 55-75% efficiency at the working point 55-75% efficiency at the working point 65-85% efficiency at 1790V (40V above working point) 65-85% efficiency at 1790V (40V above working point)

New Scheme Rossendorf: New HV filter boxes for cathode readout Rossendorf: New HV filter boxes for cathode readout No improvement in S/N due to correlated noise No improvement in S/N due to correlated noise Wolfgang: New discriminator board Wolfgang: New discriminator board Amplified cathode signals are first discriminated then summed to define multiplicity Amplified cathode signals are first discriminated then summed to define multiplicity Sergey: Improved amplifier Sergey: Improved amplifier Minimized time delay Minimized time delay Wolfgang: Alternative amplifier Wolfgang: Alternative amplifier high amplification high amplification short rise time short rise time short life time short life time

Properties of Amplifiers Sergey Sergey Amplification ~ 120 Amplification ~ 120 Delay ~ 55ns Delay ~ 55ns Rise time ~ 65ns Rise time ~ 65ns Input impedance 50Ω Input impedance 50Ω Robust Robust Wolfgang Wolfgang Amplification ~ Delay ~ 45 ns Rise time ~ 40ns Input impedance 1kΩ Not reliable: trips can kill channels

Typical Signals Positive signals come from Sergey's amplifier Positive signals come from Sergey's amplifier Negative signal comes from Wolfgang's amplifier Negative signal comes from Wolfgang's amplifier Each signal is for a different cathode plane Each signal is for a different cathode plane

Main Problem: Noise Noise 3 times higher than electronic noise is observed Noise 3 times higher than electronic noise is observed Repetition rate: 5 MHz Repetition rate: 5 MHz Noise increases if HV connectors are plugged in Noise increases if HV connectors are plugged in Pulser connection to the field planes was introducing noise Pulser connection to the field planes was introducing noise Pulser connection is removed Pulser connection is removed Due to noise: reduced efficiency (trigger threshold) Due to noise: reduced efficiency (trigger threshold)

Cosmics Results using Sergey's Amplifier based on Offline Analysis Efficiency at the HV working point about 60% Efficiency at the HV working point about 60% at the same voltage Wolfgang's amplifier showed roughly about 25% more efficiency (needs verification) at the same voltage Wolfgang's amplifier showed roughly about 25% more efficiency (needs verification) Efficiency at 1790V about 80% Efficiency at 1790V about 80% MDC-Trigger Signal is ns earlier than TOF coincidence signal MDC-Trigger Signal is ns earlier than TOF coincidence signal

Different Multiplicities

Summary Digital summing is implemented Digital summing is implemented Cathode readout doesn't provide advantages in S/N due to correlated noise and larger capacitance Cathode readout doesn't provide advantages in S/N due to correlated noise and larger capacitance Timing is no longer crucial Timing is no longer crucial We have a perfect amplifier from Sergey We have a perfect amplifier from Sergey We still have too high noise We still have too high noise Current efficiency is not yet satisfactory Current efficiency is not yet satisfactory

Outlook Currently looking for grounding/shielding problems Currently looking for grounding/shielding problems A new dedicated filter designed by Wolfgang will be tested soon A new dedicated filter designed by Wolfgang will be tested soon If succeeded in reducing noise we can reach more than 90% efficiency for multiplicity I at 1790 V If succeeded in reducing noise we can reach more than 90% efficiency for multiplicity I at 1790 V During the test run this month we will check trigger efficiency in beam and hadron/lepton ratio. During the test run this month we will check trigger efficiency in beam and hadron/lepton ratio.