AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens.

Slides:



Advertisements
Similar presentations
Detector Characterisation Group
Advertisements

Advanced GAmma Tracking Array
Teresa Kurtukian-Nieto Centre d’Etudes Nucléaires de Bordeaux Gradignan Precision half-life determination of the superallowed 0 + → 0 + β + -emmiters 42.
AGATA Introduction John Simpson Nuclear Physics Group.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
P07301 Summary Data Acquisition Module. Team Members.
Performances of a pixel ionization chamber to monitor a voxel scan hadron beam A.Boriano 3, F.Bourhaleb 2,3, R. Cirio 3, M. Donetti 2,3, F. Marchetto 3,
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
AGATA 2 nd Prototype Detector Initial Measurements & Evaluation Andrew Boston, Matthew Dimmock, Laura Nelson, Sarah Rigby.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Data acquisition techniques and development of testing equipment for the JLab Hall C 12 GeV kaon aerogel detector Nathaniel Hlavin, Mike Metz VSL Presentation.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Measurements of the (n,xn) reactions cross sections using new digital methods. Habib Karam Group GRACE.
Parallel Data Acquisition Systems for a Compton Camera
Concept of the scanning table in Strasbourg François DIDIERJEAN Tatjana FAUL, Fabrice STEHLIN Strasbourg AGATA week July 2008 Uppsala, Sweden.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Lab tests of Thick GEMs (THGEM) Lab tests of Thick GEMs (THGEM) S. Dalla Torre, Elena Rocco, L. Ropelewski, F. Tessarotto May – August 2007.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Bertram Blank CEN Bordeaux-Gradignan main physics goals detector scans source measurements MC simulations ISOLDE workshop, December 5-7, 2011.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Alignment for 2010 run and n_TOF 2009 beam profile M. Calviani (CERN), S. Andriamonje (CERN), E. Berthoumieux (CEA), C. Guerrero (CIEMAT),
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
1 Report on analysis of PoGO Beam Test at Spring-8 Tsunefumi Mizuno July 15, 2003 July 21, 2003 revised.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Micromegas Vertex Tracker Status Report
Detector characterization overview of the AGATA scanning tables
SiTRA multipurpose and standalone test infrastructure
Status of the AGATA installation at GANIL
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Performance of an Automated Water Based Cooling System for CBM MuCh
CMS EMU TRIGGER ELECTRONICS
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
Hall A Compton Electron detector overview
VELO readout On detector electronics Off detector electronics to DAQ
AGATA week Uppsala, July 2008
Status of muon monitor R&D and construction
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens & A Korichi for the Orsay (IPN-CSNSM) Group

 LN 2 XYZ table Ge segment and anode signals / NaI 500 MBq Digital [TNT]/Analogue electronics Industrial PC Scanning PC Linux [NARVAL] + SDLT TB NAS NaI Linux Experimental hall at the CSNSM EM shielded and air conditionned Area & EMC control

Concept : xyz Table + TOHR (Orsay) Digital electronics Focal point 2r Fe dd’ Positionning rods Tungten sheet Brace 40 triangular–shaped 200  m thick W-plates Plate separation : 200  m 200  m diameter holes on a hexagonal lattice Agata detector :  movment Xy movment Tohr : z movment Coincidences : 6 NaI detectors Intense Source : 15 mCi Volume /scan point : 2 x 2 x 2- 3 mm3 : 3D Scan of the whole detector From simulations, the number of single interaction Compton scatter events at a given position : face and back of the detector

Collimated 137 Cs delivered : 477 MBq -> 2 kHz After a heavy safety procedure (A. Lopez-Martens) we are allowed to use the source Security trolley Security lock down More security

G4 simulations have shown that TOHR collimator are too thin (K. Hauschild) Double up the thikness Recalibration of each TOHR module (focal point) Done (J. Robin & F. Le Blanc)

 Mechanics ready (P. Pariset)  A conventional XY table, the motorised rotational plate to turn the AGATA detector and the stepping motor for the z-translation of TOHR : delivered  Programming Software for the different movements : done (E. Legay, N. Dosme and X. Grave)

VME interface ACQ-CAMC __________________ CAMAC Analogique ___________________ TNT2 + trigger ___________________ HT et BT détecteur ___________________ ATCA AGATA The analog electronics: 3x(16 channels) CADC cards developped and tested VME interface ACQ- CAMAC : under way (D. Linget, E. Legay, S. Leboutelier, X. Grave) Electronics housing : Spécial temperature Controlled rack

AP1 Infrastructure : ready Analogue electronics (48ch) and DAQ (Narval) ready Digital electronics : 10 TNT2 cards (Gabriela) are under tests at Strasbourg Commmissioning of the set-up with a real Agata detector Possible from April 2006 Orsay set-up : Ready to scan summer 2006 Summary

VME interface ACQ-CAMC __________________ CAMAC Analogique ___________________ TNT2 + trigger ___________________ HT et BT détecteur ___________________ ATCA AGATA (plus tard) PC-Linux ACQ __________________ PC table xy, Commande moteur __________________ LN2-Auto _

Status : future prospects Manque ACQ et é lectronique analogique TNT2 cards under tests at ires Ready in few weeks Commmissioning of the set-up with a real agata detector April 2006 Ready to scan summer 2006 Liste des gens

Collimated 137 Cs source ‘security’ trolley ‘ security’ lock down more ‘security’