SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,

Slides:



Advertisements
Similar presentations
Iain Nicol Assistant Director DTI Standards and Technical Regulations Directorate Responsible for EMC Directive.
Advertisements

Doc.: IEEE Submission July 2003 Andy Gowans (UK RA) UK Ultra Wide Band (UWB) Compatibility Study Andy Gowans & Bharat Dudhia UK.
3.7) On-going activities within CEPT/ECC Thomas Weilacher Vice Chairman of CEPT/ECC Working Group FM (Frequency Management)
Activities in CEPT ECC/WGFM/ Project Team FM54
On-Going Activities in the CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Interactive Workshop.
WRC-12 Preparation CPG Chairman /
Regulatory Framework in Europe Titus Spoelstra Wim van Driel CRAF URL:
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
COST286 EMC in Diffused Communications Systems Professor Andy Marvin Chairman, COST 286 Management Committee.
COST286 meeting Barcelona 14/15 April BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices János Löcher; György Varjú BUTE.
Development of CEPT and ITU deliverables Ralf Trautmann 6 th International Seminar on Spectrum Monitoring Kyiv, 10 – 12 July 2013.
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
GSC: Standardization Advancing Global Communications Review of GRSC3 meeting SOURCE:ETSI TITLE:Review of GRSC3 AGENDA ITEM:GRSC4 3 CONTACT:Karl Heinz Rosenbrock.
OPERA Open PLC European Research Alliance 6TH FRAMEWORK PROGRAMME Author: Luis J. Legorburu Date: October 14 th 2004 OPERA-COPRAS Brussels October 14th.
I.U.C.A.F Summer School May / June CRAF Committee for Radio Astronomy Frequencies.
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 Update on EMC Activities in ETSI GRSC (27 April – 1 May 2003) Olly Wheaton.
CHANGING TECHNOLOGIES: Implications for viewers & listeners Philip Laven VLV Autumn Conference November 2014.
Doc.: IEEE /168r0 Submission March 2001 Stephen Berger, TEM Consulting Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
GSM onboard aircraft : SE7 activities Joint meeting, ETSI – 09 September GSM ONBOARD AICRAFT CEPT / SEWG / PT SE7 Jean-Philippe Millet, ANFR
Federal Ministry of Economics and Technology, VII B 3 "Digital Broadcasting" Initiative 1 The Initiative „Digital Broadcasting“ of the German Government,
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
UNITED NATIONS and ITU an effective vehicle to support the needs for spectrum and technology in developing countries An outstanding example AAU Conference.
Doc.: IEEE /016r0 Submission March 2003 Andy Gowans - UK RA Andy Gowans Private Business Systems Unit Radiocommunications Agency
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 RAST 10/2-3 Generic Standards
24/03/2003Jacques MdM / REF France1 HF Receivers desensitisation from wideband noise spurious in HF bands (1.8 to 30 MHZ) Impact of spurious radiations.
Frequency Bands Prepared by, J.Jayastree ( ) M.Tech(COS)
Transition to Digital Broadcasting and Digital Dividend 6-7 October 2011, Belgrade, Serbia 1 Sub-Regional Workshop on Transition to Digital Broadcasting.
1 Emerging issues Titus Spoelstra ESF Committee on Radio Astronomy Frequencies P.O.Box 2, 7990AA Dwingeloo, Netherlands
A new challenge – creating a regulatory environment for implementing geo-location databases for White Space Devices (WSD) Andy Gowans Date (26 th January.
ETP European Telecommunications Platform Presented by: Ernst Weiss Former Chairman ETP E T P.
Seniorklubben af 1991 Introduction Presentation to Seniorklubben af 1991 – 19 April 2012.
Doc.: IEEE /0041r0 Submission November 2006 Mark Austin, OfcomSlide 1 SEAMCAT Introduction Presentation to IEEE Notice: This document has.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
Third Generation Developments RADIOCOMMUNICATIONS AGENCY A presentation for the Mobile Services Committee RA2/PTN Radiocommunications Agency.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO,
CEPT/ECC-ETSI Co-operation Process
20 th EMC WP / TCAM EG 5 – CENELEC Standardization Report Publication of recast EMCD, LVD and RED CLC/TC 65X (Industrial Wireless Automation) 800 MHz Decision.
Doc.: IEEE /0958r0 Submission September 2005 Knut Evensen, Q-Free ASASlide 1 ETSI-TG37-liaison-report-september-2005 Notice: This document has.
Activities in CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Trends in Automotive Radar and.
WGFM PT49 BB PPDR Dublin, 26 – 27 November 2013 Peter Buttenschön Chairman WGFM PT 49
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Doc.: IEEE /??r0 TG4a Presentation Andy Gowans/Mark Austin – OFCOM UK Slide 0 Ultra Wideband in Europe The EC Decision January 2007.
Updates on the digital dividend and UWB in the UK and Europe
RADIO SPECTRUM MANAGEMENT
Reflection Of The NJFA In The ERC Report 25 (ECA Table) And Relation To EFIS And To The RSPP Inventory CEPT/ECC Civil/Military Meeting, November.
Activities in CEPT-ECC potentially relevant for UIC
CEPT/ECC-ETSI Co-operation Process
Session 1 Introduction to CEPT, its committees and ECO
Introduction to ECC PT1 February 2011.
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
Thomas Weilacher Chairman ECC Working Group FM
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
WRC-07 decisions and follow-up
Wi-Fi Alliance meeting
Broadband PPDR frequency situation in Europe
RSPG 34th Plenary Meeting
Progress & the Future Brian Copsey (ETSI)
EU-US-JP ITS Steering Group Annual Meeting 2018
Submission Title: Status Report of European UWB Regulatory Activities
Submission Title: European UWB Regulations Date Submitted: 14 May 2003
Sergio Buonomo Counselor ITU-R Study Group 5
ITU-T Study Group 5 Protection against electromagnetic environment effects in telecommunications Roberto Pomponi.
GSC: Standardization Advancing Global Communications
Relevant Activities in CEPT-ECC
Relevant Activities in CEPT-ECC
What can CISPR do to help ?
GSC: Standardization Advancing Global Communications
Wireless Power Transmission – WPT
Presentation transcript:

SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik, 6-7 March 2001 Bernard Després Chairman CEPT SE35

SE35presentation.ppt - November 23, 2000 France Telecom R&D History of the work in CEPT -1 è In 1999, the UK administration presented in CEPT ERC Working Group Spectrum Engineering (WG SE) papers on the Power Line Telecommunication (PLT) trials in the Manchester area and on the potential disturbances induced into radio services è May 1999, a PLT correspondence group was established within WG SE ‡ A questionnaire on the PLT National regulations and on the appropriate way to regulate such systems was prepared in Summer 1999 and sent to CEPT administrations participating in WG SE. ‡ 10 answers were received and a compilation was prepared. è In the course of this work, the idea was expressed to also address other types of cable transmission systems like xDSL and cable TV

SE35presentation.ppt - November 23, 2000 France Telecom R&D History of the work in CEPT -2 è A special meeting on PLT was organised in Mainz on December 6-7, ‡ Conclusion from the Mainz meeting : The group recommends to WG SE to create a Project Team on Power Line Telecommunications (PLT) and cable transmissions in general. è February 2000 : at the CEPT ERC WG SE meeting in Naples, the proposal was endorsed and it was decided to establish a new Project Team SE35 entitled : è Power Line Telecommunications (PLT) and cable transmissions in general

SE35presentation.ppt - November 23, 2000 France Telecom R&D SE35 terms of reference è Extracts from the approved SE35 terms of reference : è identify the frequency ranges over which PLT and cable transmission are likely to operate now and for the future ; è identify those services that are likely to be affected by PLT and cable transmissions in general (broadcasting, maritime, radionavigation, radioamateurs…) and evaluate their protection needs ; è investigate methods of measuring the emissions from PLT and cable transmissions ; è perform compatibility studies to derive limiting values for emissions from PLT and cable transmissions to protect primary services ; è propose a harmonised European approach for PLT systems and cable transmissions in general ; è produce a report covering the various aspects for wide consultation within Europe ; è in the course of these studies, liaise closely with the relevant EMC standardisation committees and with ITU-R WP 1A and 1C.

SE35presentation.ppt - November 23, 2000 France Telecom R&D SE35 activities è Since the creation of the group, four meetings have been held with an average participation of 25 people from 10 CEPT administrations and from the industry ‡ Work has progressed towards the preparation of an ERC report on « PLT, cable transmission in general and their effects on radiocommunication services » ‡ Liaison statements have been sent and received from several CEPT and ETSI standardisation groups è Information has been gathered on the characteristics of radio services to be protected (frequency band, sensitivity, protection ratio…) in the frequency ranges where cable signals run (1-30 MHz for PLT) è The ERO and WG FM have made a review and will produce a report on the use of the HF band throughout CEPT

SE35presentation.ppt - November 23, 2000 France Telecom R&D Field trial results in Germany frequency (kHz) E in dB(µV/m) NB30_3m T5MSWQ_on in dBµV/m T5MSWQ_off in dBµV/m T5MS_on in dBµV/m è Field strength measured outside the building at 5 meters from the injection point (transformer room), compared with the proposed German NB30 limit (red line, the limit is defined at 3 meters) ; the PLT injected level is +17 dBm and ranges from 2 to 3 MHz

SE35presentation.ppt - November 23, 2000 France Telecom R&D Field trial results in Germany-2 è Field strength measured at 3 meters outside a house (this experiment combined both access and in-House PLT) compared with the proposed German NB30 limit (red line) ; the PLT injected level is +10 dBm and ranges from 1.5 to 3.5 MHz In both trials, when the injected PLT signal exceeds 10 dBm, the result exceeds NB30 But, if lower injection levels are used, the radiation level is around the NB 30 level

SE35presentation.ppt - November 23, 2000 France Telecom R&D Field trials in Norway è Two pilot-projects took place in Norway in two different cities with two different PLT manufacturers è Maximum field strength measured at 3 meters range from 45 to 65 dBµV/m (as a comparison, the proposed German NB30 limit range from 30 to 40 dBµV/m) è Listening tests with a shortwave radio receiver showed that radiation from the powerline systems gave an embarrassing noise in the frequency corresponding to the PLT wanted signals ‡ Audible interference up to 350 meters from the line in some cases

SE35presentation.ppt - November 23, 2000 France Telecom R&D Other SE35 results è A measurement procedure based on two initial proposals made by the UK and German administrations have been elaborated. It explains the procedure to measure radiated field around cable transmission installations è Theoretical calculations on the cumulative effect of a large number of PLT or cable transmission installations have been presented è Results of an extensive study involving measurements and calculations made in Switzerland on the far field behaviour of electricity lines have also been presented è The PLC Forum presented K factor values (ratio between the injected power fed into the cable and the resulting radiated field at a given distance) measured over a very large number of PLT installations è All these elements will be incorporated into the ERC report in preparation

SE35presentation.ppt - November 23, 2000 France Telecom R&D Latest developments in CEPT è WG FM (Frequency Management) February 2001 meeting : è Extract from an approved liaison statement to ETSI on PLT : è During the meeting of WG FM many administrations expressed serious doubts about the possibility to allocate spectrum to PLT applications based on the current regulations and definitions in the Radio Regulations such due to the fact that PLT applications cannot be considered as a radio service. These doubts relate to the possibility of changing the Radio Regulations to the benefit of systems like PLT at a future competent WRC. è WG SE (Spectrum Engineering) February 2001 meeting : è WG SE instructed SE35 to prepare an ERC Recommendation which should define generic flat or slowly varying limits (likely to be based on the German and UK limits) for any PLT and cable transmission installation

SE35presentation.ppt - November 23, 2000 France Telecom R&D Conclusions : SE35 future activities on PLT è The work continues towards the preparation of an ERC report on PLT, cable transmission in general and their effects on radiocommunication services : the aim is to produce a first consolidated draft to be presented at the WG SE meeting in May 2001 è Work will start towards the preparation of an ERC Recommendation proposing some limits to be applied to PLT and similar cable transmission systems : the agreed time scale is to try to have it finalised for the WG SE October meeting è In the course of these activities, close liaison with the relevant standardisation bodies (CENELEC, ETSI…) will be maintained