25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
ISS After One Year Peter Dornan Imperial College London.
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004 Aims of the meeting At least four universities in Switzerland do research in Neutrino Physics.
EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
European design study on Neutrinofacilities - Euronu within FP7.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Preparation of design study ICL May 2005 accelerator Alain Blondel ECFA/BENE Future Neutrino Beam studies Towards a comparison of options on equal footing.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
Neutrino Factory R&D in Europe Rob Edgecock/RAL. Outline Introduction i.e. what has happened since last year European feasibility study Proton driver.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
UK Neutrino Factory Conceptual Design
IPHC-IN2P3/CNRS Strasbourg
Accelerator R&D for Future Neutrino Projects
The ESS Neutrino Super Beam and associated large Cherenkov Detector Design Study Lund 2014 M. Dracos.
Status of the beta-beam study
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Superbeams with SPL at CERN
Progress towards Pulsed Multi-MW CERN Proton Drivers
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Poster session: Wednesday 6 June
Presentation transcript:

25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)

25/10/2007M. Dracos2 What is an EU Design Study? The 27 European Union member states is in the process of creating a common Research Area with common Research Infrastructure The EU funding for research is organized as Frame Work programmers with different components –The FP contributes with 5% to the total national research funding in Europe –We are presently working within the 6 th FP –The Design Studies is one component in the FP and has as objective to provide first designs for possible common research infrastructure The ESFRI (European Strategy Forum on Research Infrastructures, European roadmap for research infrastructures) committee establishes a priority list for new common infrastructure to which the EU is willing to contribute –The Design Studies is the first step in the process to qualify for financing from the EU for the infrastructure –For the infrastructure to be constructed a member state(s) or an intergovernmental organization must bid for it and offer an important part of the funding International participation is strongly encouraged

25/10/2007M. Dracos3 Work Program: Capacities EU call

25/10/2007M. Dracos4 Design Studies budget

25/10/2007M. Dracos5 Objectives of EURONU DS The recent discovery that the neutrino changes type (or flavour) as it travels through space, a phenomenon referred to as neutrino oscillations… The implications are far reaching… Knowledge of the contribution of neutrinos in these areas needs precise measurements of the parameters governing neutrino oscillations. This will require a new high intensity beam-based neutrino oscillation facility in which neutrino beams are generated using new and highly challenging concepts. This Design Study will review all three currently accepted methods of realizing this facility (the so-called neutrino Super-Beams, Beta Beams and Neutrino Factories). It includes a detailed study of the key technical challenges of the accelerator facilities, of the detector options necessary to measure the neutrino oscillation parameters and a comparison of the physics reach of these facilities. The design study will also perform a cost assessment that, coupled with the physics performance, will permit the European research authorities to make a timely decision on the lay-out and construction of the future European neutrino oscillation facility.

25/10/2007M. Dracos6 Neutrino Facilities p H- linac 2.2 (3.5) GeV, 4 MW Target ~300 MeV   beam to far detector decay tunnel Accumulator ring + bunch compressor Magnetic horn capture (collector) proton driver hadrons  p Proton driver Isol target & ion source DECAY RING B = 5T L=6880 m PSB EURISOL Existing at CERN New RFQ SPS PS Linac H- linac 2.2 GeV, 4 MW Target Linac  2 GeV Recirculating Linacs 2  50 GeV Decay ring – 50 GeV  2000 m circumference Ionization cooling Phase rotation beam to far detector Drift Accumulator ring + bunch compressor Magnetic capture beam to near detector SPL Super-Beam Neutrino Factory Beta-Beam

25/10/2007M. Dracos7 Participants

25/10/2007M. Dracos8 p-driver target collector  front-end  accel. stor. ring technologies  beam Overview SBBBNF  13 CPVMSW … (non-acc.  ?) LAr Cerenkov Emulsions magnetized physics detectors facilities

25/10/2007M. Dracos9 p-driver target collector  front-end  accel. stor. ring technologies  beam Work Packages and Deliverables Super-Beam Neutrino Factory Beta-Beam in order to underline synergies… Near det. Beam instr. Far det. Perform. Comparison Detectors Physics

25/10/2007M. Dracos10 Objectives of the tasks Management: –Lead and coordinate the DS –Comparison of the three facilities Super beam: –Design of target and collector –Beam characteristics for the SPL superbeam –Specifications for the proton driver Neutrino factory –Design of muon front end –Design of an acceleration scenario –Develop a conceptual design for proton beam handling after the primary production target (proton beam dump) –End-to-end simulation of the neutrino factory complex

25/10/2007M. Dracos11 Objectives of the tasks Beta-beam –Review acceleration scenario for high-Q value isotopes –Production of beta-beam isotopes with the production ring concept –Review decay ring design for high-Q value isotopes –Continue R&D on bunching Detector task –Study a Magnetized Iron Neutrino Detector –Study a Cerenkov detector –Study a near detector Physics task –Study physics performance –Make optimization of the different possible scenarios –Make a comparison

25/10/2007M. Dracos12 Effort in people (120 person years)

25/10/2007M. Dracos13 Organization

25/10/2007M. Dracos14 Organization

25/10/2007M. Dracos15 Money Total cost: 14.45M€ EC request: 4.8M€ Ratio: 33%

25/10/2007M. Dracos16 Time scale In short: –We will work for 4 years –We hope to start beginning 2008 –We will use the last year for the comparison task

25/10/2007M. Dracos17 EU decision The proposal got a top ranking in the evaluation of the proposals We have been invited to negotiate for a maximum 4 MEuro EU financing

25/10/2007M. Dracos18 Annual meeting Annual meeting to gather the Neutrino physics community and report on the progress of the study The meeting will be combined with task meeting, management meetings and reviews –November 2008: CERN –November 2009: USA –November 2010: RAL (Project review) –November 2011: Paris Your are invited to participate!

25/10/2007M. Dracos19 Participation CNRS et CEA PartnerIn proposalAfter step (1) cuts After all cuts - FINAL NUMBERS Total cost (EUR)EC request (EUR)Re-imbursement rate (%)EC Request Total cost STFC CEA CERN Glasgow Imperial CSIC CNRS CUT UDUR INFN MPG UOXF UniSofia Warwick UCL TOTAL

25/10/2007M. Dracos20 Participation CNRS et CEA Participant no./short name WP1WP2WP3WP4WP5WP6Total person months CNRS12 (12) (IPHC) 102 (108) (IPHC) 12 (12) (LPSC) 78 (83) (LPSC+ LCMI) 44 (48) (APC) 0248 (263) CEA04836

25/10/2007M. Dracos21 End