1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

WAREHOUSING MANAGEMENT
Strategic Decisions (Part II)
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Pull and Kanban in SAP.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Enterprise Resource Planning MPC 6 th Edition Chapter 1a.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Omercan Barut Dokuz Eylul University Industrial Engineering.
The Fundamentals of Enterprise Resource Planning Olayele Adelakun (Ph.D) Assistant Professor CTI Office: Room 735 CTI 7th Floor Phone: Fax:
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 6 Production and Operation Information System Ir. Ekananta.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Supply Chain Management
Enterprise Resource Planning, 1st Edition by Mary Sumner
Production Logistics and ERP
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 6-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
Supply Chain Management COSC643 E-Commerce Supply Chain Management Sungchul Hong.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Production Planning and Control Introduction
April 10–12, 2006 Hyatt Regency Atlanta Atlanta, GA NCMA World Congress 2006 : Achieving High Performance in Global Business: Leadership, Outsourcing,
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
SUBTITLE TEXT. Optimal Solutions What is E- Business Suite Oracle E-Business Suite is the most comprehensive suite of integrated, global business applications.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
1 Session 19 Just-In-Time Manufacturing JIT Impact on the MPC System JIT Continuous Improvement –JIT Building Blocks –Elements of JIT Kanban Systems –Single.
extending the supply chain through inter-enterprise integration
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
LEAN MANUFACTURING IMPLEMENTATION -- Lean Supply Chain
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Operations Management Material Requirements Planning
1 Session 21 Implementing JIT Manufacturing Session 21 Implementing JIT Manufacturing John Striebich Copeland Corporation.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
SUPPLY CHAIN MANAGEMENT. PARTICIPANTS INTRODUCTION SUPPLY CHAIN MANAGEMENT.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Dr K. ROUIBAHChapter 11 (QM 240) / dept QM & IS1 Chapter 11 Objectives How do enterprise systems provide value for businesses? How do supply chain management.
1 Outsourced Manufacturing Within The Current Global Marketplace Mr. Anthony Della-Croce VP Solutions Architecture Core Services.
Apparel Industry Trends, Challenges, Observations and Solutions Presented by Fred Isenberg, VP Sales New Generation Computing, Inc. New Generation Computing.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
© 2011 Pearson Education, Inc. publishing as Prentice Hall Figure 11.1.
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
Resource Planning Chapter 14. Step Stool Assembly.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
M0254 ERP Session #2 – Supply Chain
SYSPRO ERP for all Manufacturing Types and Processes
6-1 Manufacturing Systems ERP Background Designed to re-order inventory using re-order point –Adapts production to customer orders –Increased flexibility,
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
CONCEPTS IN ENTERPRISE RESOURCE PLANNING FOURTH EDITION Chapter Four Production and Supply Chain Management Information Systems.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
M0254 ERP Session #2 – Supply Chain
Enterprise Resource Planning, 1st Edition by Mary Sumner
AXUG Partner Showcase – Introducing Preactor
Supply Chain Management
Concepts in Enterprise Resource Planning Third Edition
Facility Inventory Old Facilities Modern Facilities Classroom Size
andon Japanese term for a signaling system announcing problems
extending the supply chain through inter-enterprise integration
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
MODERN TRENDS IN PRODUCTION ENGINEERING
Enterprise Resource Planning, 1st Edition by Mary Sumner
A Process View of the Supply Chain
Operations Management
Enterprise Resource Planning, 1st Edition by Mary Sumner
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation

2 Planning and Scheduling Lean Operations Copeland Corporation Current Environment (FY99) MRP II System – Home Grown/Customized Weekly MRP Runs Nightly Batch Updates Of Transactions No Long Term Capacity Planning Short Term Capacity Planning – Push Out Orders Forecast Driven Suppliers Inventory Management – Hold PO’s At Month End PerformanceCustomer Metrics Requirements Delivery 70-90% 98+% Lead Time 3-5 WeeksConsignment Inventory 5-6 Turns Double in 5 Years

3 Planning and Scheduling Lean Operations Copeland Corporation Copeland MRP II System Supports Three Divisions - Copeland A/C - Standard MRP II User - Copeland Refrigeration – Lean Manufacturing - Copeland Asia - Standard MRP II User With Specific Lean Applications Must Support 23 Hour Operation Interface With e-Business Tools Standardize Unique Operations - Widespread Customization

4 COPELAND MRP II MATERIALS SYSTEM - CONCEPTUAL DESIGN Sales Forecast Backlog - Order Inventory Service Parts Fcst & Interplant Demand Inventory Control Forecast By Planning BOM MRP Supplier Scheduling Materials Inventories Shop Floor Control Financial Analysis Cash Flow Projection Cash Forecast Consumption Load Report Machining Schedule Order Acknowledgment Customer Order Entry MPS Machine Shop Scheduling Assembly Area Scheduling Net ProfitsROI Prod Reporting Material Labor Overhead Ending Cash Income Starting Cash To Financial Analysis Shipments

5 Planning and Scheduling Lean Operations Copeland Corporation MRPII Systems MRP Systems Today Rigid MRP Schedule Limited Updating Between Scheduled Runs Structured To Support Complex BOM’s Often Mainframe Or Central Control Forecast Driven (Inaccurate) Supports Long Lead-times Beyond MRP Run Frequency Infinite Capacity Complex

6 Planning and Scheduling Lean Operations Copeland Corporation MRP II/Lean Systems MRP Systems Today JIT/Lean Enterprise Rigid MRP ScheduleHigh Flexibility Limited Updating Between SchedulesFast Response Structured To Support Complex BOM’sFlattened BOM’s To Reduce Transactions Often Mainframe Or Central ControlDecentralization Of Processes - Ownership Forecast Driven (Inaccurate)Consumption Driven Supports Long Lead-times BeyondSupports Lead-times Inside of MRP Run Frequency Infinite CapacityPlanned Capacity - Takt Times ComplexSimple (Usually)

7 Planning and Scheduling Lean Operations Copeland Corporation Closing The Gaps – MRP vs Lean Lean Material Systems Must: - Be Highly Flexible (Daily Capability) - Exception Based - “Expected” Demand Covered By Pull Systems/ POU - Require Minimal Transactions To Support - Flat Bills - Backflushing Essential - Support Much Less Inventory/ Safety Stock - Inventory Accuracy IS Critical - Cycle Count Program Essential – Cause and Effect Focused - PC Based, Can Not Wait For Overnight Runs/ Updates

8 Planning and Scheduling Lean Operations Copeland Corporation Analysis MRP Function Changes - Long Term Forecast To Supplier - Transaction Processor/Collector - Data Warehouse – Download Of Static Data To PC - Develop Daily “Kanban” Capability MRP Is Separated From Shop Floor/Purchasing Activity - Responsiveness No Longer Limited To MRP Run Frequency

9 COPELAND MRP II MATERIALS SYSTEM - CONCEPTUAL DESIGN IN LEAN ENVIRONMENT Sales Forecast Sales And Operations Planning Backlog - Order Inventory Service Parts Fcst & Interplant Demand Inventory Control Forecast By Planning BOM MRP Supplier Scheduling Materials Inventories Shop Floor Control Financial Analysis Cash Flow Projection Cash Forecast Consumption Load Report Order Acknowledgment Customer Order Entry MPS Machine Shop Scheduling Assembly Area Scheduling Net ProfitsROI Prod Reporting Material Labor Overhead Ending Cash Income Starting Cash To Financial Analysis Shipments Supplier Forecast E - Kanban Kanban

10 Planning and Scheduling Lean Operations Copeland Corporation Integrating e-Business Supplier Portal -Replace Faxed Kanban Signal With e-Kanban - Increase Speed Of Orders To Suppliers - Increase Speed Of Response From Suppliers - Facilitate Expediting, Exception Based Customer Portal - Increase Speed Of Customer Order Into System - Auto-Acknowledge Capability - Customer Ease Of Use, Exception Expediting

Before Flow Copeland Refrigeration Flow Enterprise/e-Business Integration Days Next Steps:- Convert Order To Production Schedule Real Time - Supplier Lead Time Reductions Receive Order Weekly MRP Distribute MRP Assemble & Ship Flow & Portal Flow Pull Signal Manual Expedite To Pull Order In Supplier Lead Time

12 Planning and Scheduling Lean Operations Copeland Corporation Flow Results On Time Delivery (Pre-Flow) – % On Time Delivery to Customers –199886% –199983% Since Flow Implementation –200090% –200195% (98% 2 nd Half of Year) Lead Time Reduction – Up To 66% (So Far) Inventory - First Higher (Stabilization) - Now Dropping Productivity – Pockets of Improvement Expanding Rapidly

13 Planning and Scheduling Lean Operations Copeland Corporation Issues Lumpy Actual Demand - Often Caused By Process, Shortages, Pulls/Pushes - When Actual Demand Exceeds Pull Sizing - Utilize MRP To Recover Changing Old Habits/Mindset Issues – Across Supply Chain Maintaining Labor Efficiencies Operating With Less Backlog (Safety Blanket) Right Sizing Inventory – Short Term Increase Old Metrics No Longer Valid – New Metrics Needed

14 Planning and Scheduling Lean Operations Copeland Corporation Supply Chain Management Some Suppliers Unable To Reduce Lead-Time - Offshore Sourcing - Consignment, VMI, Right Sizing Work With Strategic Suppliers - Set Up Reduction, Pull Systems - EDI, B2B Ordering - Cycle Time Reduction - More Responsive/Competitive Change Expectations, Incorporate into Contracts

15 Planning and Scheduling Lean Operations Copeland Corporation Next Steps Full e-Business Implementation Database Warehouse B2B Data Transfer Supply Chain Development - Supplier – MCT/Lead-time Reduction - Customer – Point of Sale Replenishment - Daily Ordering - Freight Management

16 Planning and Scheduling Lean Operations Copeland Corporation Summary Companies Are Implementing Lean Concepts To: Increase Responsiveness Improve Productivity MRP Systems Must Adjust To New Requirements From Lean Operations Less Complexity More Frequent Updates, Exception Based Support Flatter BOM’s, Fewer Transactions Better Metrics And Data Collection/Download Capabilities e-Business Support Even With Less Complexity, Some ERP Modules May Be Eliminated Visual Systems, Hands On Management