SOA Testing Overview. Quarterly Software Upgrade Cycle Sysprog test LPARS Flash copy DEV LPARS Flash copy PROD LPARS DEV LPARS PROD LPARS IVPs, customisation,

Slides:



Advertisements
Similar presentations
By Ethan. Time can be a unit of measurement. There are 60 second in 1 minute. There is 60 minutes in 1 hour and there are 365 days in a year. Interesting.
Advertisements

Local Touch – Global Reach The New Tester Matthew Eakin, Manager Managed Testing Practice Sogeti, USA.
Converting Time Conventional 12-hour clock –Source of errors in medication administration –Each time occurs twice daily 10:00 a.m. 10:00 p.m.
Time 1 day = 24 hours 1 hour = 60 minutes 1 minute = 60 seconds 1 year
Peter Plevka, BMC Software Managing IT and Your Business – Optimizing Mainframe Cost and Performance.
® © 2006 IBM Corporation Usage of TPM for ITM V6 agent install, upgrade and configuration Mike McIntyre
Collaborative Web Development Designing and Building a Collaborative Web Infrastructure Andrew Gehring - NREL.
Copyright 2007, Information Builders. Slide 1 iWay Service Manager Naomi T. Klamen Director, SM Product Management.
Week 1 intro to PM Project Management Introduction to Project Management and the Software Development Lifecycle Week 1 Winter quarter 1/7/02 SOS.
Introduction to z/OS Basics © 2006 IBM Corporation Chapter 15: WebSphere MQ.
Limonene 50ppb on Beta-Caryo SOA Lights on at 09:49.
Introduction to the new mainframe: Large-Scale Commercial Computing © Copyright IBM Corp., All rights reserved. Chapter 8: Autonomic computing.
Click to add text Introduction to z/OS Basics © 2006 IBM Corporation Chapter 15: WebSphere MQ.
24 Hour Clock Grade 6 Math.
® IBM Software Group © 2008 IBM Corporation Rational Developer for System z User Group Kickoff.
Thanks Special thanks for allowing me to “borrow” from their presentations and providing details for this one: Steve Conger :VP - Mainframe Systems Dev.
Maciej Gruszka Principal System Engineer 11 October 2005 The New World Order is Fluid BEA’s integration infrastructure as a tool decreasing operational.
Performance and Capacity Experiences with Websphere on z/OS & OS/390 CMG Canada April 24, 2002.
ISPW Natural Demo Mar 2011 Created by the kindness of CN Rail using the their Test ISPW system Through the efforts of Paul Vaenas CN - IT - Release Management.
Software Testing Science EXPERIENCE OF TESTING GUI APPLICATIONS IN A RAD ENVIRONMENT Graham Thomas Software Testing Science.
What’s new with EntireX Communicator 7.3 Rolf Bahlke crossvision Chief Architect October 2006.
SAG Infotech Private Limited Soft solution for those who can not afford to make errors. HOW TO DO OFFLINE REGISTRATION OF A SOFTWARE ?
Our Data Management and Transaction Processing Company Name 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence z/OS Application.
Course Overview Ted Baker  Andy Wang COP 5641 / CIS 4930.
Dr. Jim Adams’ Experience TARRANT ANNUAL MEETING Saturday, April 26, :00 pm.
BIT 115: Introduction To Programming Instructor: Mike Panitz
0 Apex as Your Integration Platform: Is It Possible? Copyright 2012 Fujitsu America, Inc.
SOA Testing IMS applications Regression testing of Z/OS, IMS DB2 and MQ at the SCC by replaying production workload.
IMS performance savings. Background IMS is backend system for Standard Life SOA applications Distributed applications Increased CPU consumption in IMS.
Welcome to the Winter Training Series Today we will be focusing on Campaign actions – the basics.
Sudhir Hasbe Sr. Product Manager Microsoft Corporation SESSION CODE: SIA307 Renga Srinivas Sr. Program Manager Paul Larsen Product Unit Manager.
NUMBERS o´clock.
Chapter Seven Telling Time. 1.hour – a unit used to measure time 1 hour = 60 minutes 1 day = 24 hours.
Who Wants to be a Millionaire? Type your name and send
3WSDS 3-Way Secure Data Splitting Supervisor: Dr. Talal Alkharobi ABDUL-MOHSIN AL-FARAJ ( ) Hamed Al-Mehdhar ( )
MAINFRAMES.
AN ASPECT-ORIENTED ARCHITECTURE FOR HANDLING VARIATION ACROSS MOBILE PLATFORMS Proposed by: Chokchai Phatharamalai Advisor: Dr. Paul Janecek.
CREATING “COLLEGE- LEVEL” ART How to make sure your art doesn’t scream “I’m still in High School”
Our Programming and Batch Systems Company Name 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence z/OS Application Development.
MANP1163 (Course Overview).  Dr Suriayati Chuprat   Room: IT-Manager’s.
Converting Time Revision Level D Learning Intention Success Criteria
1.32 Analyze diagrams, charts, graphs, and tales to interpret healthcare results Record time using the 24-hour clock.
Introduction to the new mainframe © Copyright IBM Corp., All rights reserved. Chapter 15 WebSphere MQ.
FINAL EXAM OVERVIEW Aliya Farheen
User Data : Enhancements This document s intended only for AX conference attendees and their parent companies, holding a valid AXIS ERP license from.
Building usable software through early testing. Objective Show the value of testing from the beginning of the development cycle. Consensus in the industry.
Mobile Testing Overview. Agenda Mobile application quality poses a unique challenge Mobile changes the ALM cycle – Interoperability is unique to mobile.
© 2008 IBM Corporation z/OS and z/VSE Comparison The future runs on System z G. M. (Jerry) Johnston Senior Advisor – Boeblingen Lab.
Building Blocks CS 1308 Computer Literacy and the Internet.
© University of Reading 2007www.reading.ac.uk University of West Indies March 17, hour clock time Dr Geoff Tennant
Technologies Environments. Quick Poll  What stack are you planning to use?
Nicolas Georgeault Solution Architect - CDO Negotium
IBM Infrastructure Services
CIS 234: Object-Oriented Programming with Java
SEI Robotics Lego Mindstorm Competition
Adobe Max 2011.
Overview of CUNY Aleph migration 18 -> 21
The Linux Command Line Chapter 14
Time Revision.
What Is Your DevOps Toolchain?
MILITARY TIME.
ضرورت آموزش و یادگیری الکترونیکی در مدارس
How to Improve Releasing Efficiency via i18N/L10n Test Automation.
Time Grade 4.
Bellwork Identify two materials that you would need to get for Mr. Hughes’ Class. Describe how Make-Up work is obtained in Mr. Hughes’ Class. Explain.
Project Management - ime380
Elapsed Time.
Who Wants to be a Millionaire?
Conversions for Other Clinical Applications: Time and Temperature
Vendor Software Lessons From Consulting Vendor Software.
Presentation transcript:

SOA Testing Overview

Quarterly Software Upgrade Cycle Sysprog test LPARS Flash copy DEV LPARS Flash copy PROD LPARS DEV LPARS PROD LPARS IVPs, customisation, exits, limited regression testing Developer testing Developer tools Only ACCT envt “Business testing” Development “is production” Service variance once per quarter. Sat 8pm – 6am Midnight testing Change controlled

SOA Environment WAS AIX JVM MQ OTMA DDF DB2 IMS MPR SP ODBA Z/OS

SOA Testing AIX development environments connect to development mainframe systems No equivalent flash copy test systems Use the ‘offline leg’ instead DR “Mega test” –Connects offline leg to flash copy systems –Reduces production resiliency –Requires cross platform coordination, skill sets, etc –Still tests only a small percentage of applications

Flash copy Environment MQ OTMA DDF DB2 IMS MPR SP ODBA No distributed Systems to drive the mainframe!

SOA testing Development systems are production Developers geared towards testing new stuff Development work has business sponsorship Software upgrades seen as ‘keeping the lights on’ What is more important?

SOA testing Application reuse is good but People writing code don’t know what they are driving on the mainframe Difficult to get/find the right people for an application Errors are difficult to diagnose Especially true for out of hours testing